X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726103316000

Well Details

Well ID: 0726103316000
Loading map...
Location: 00/16-33-072-10W6/0
Location Alias: 00/16-33-72-10 W6M
Location Alias 2: 00/16-33-072-10 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 10
Section: 33
County/Municipality: County of Grande Prairie No. 1
Well Name: HUSKY HZ WEMBLEY 16-33-72-10
Operator Name: Husky Oil Operations Limited
License Number: 0491245
License Date: 2018-10-01
License Status: Amended
Spud Date: 2019-02-17
Final Drill Date: 2019-03-08
Well Total Depth: 5126.00 m
Surface Hole Latitude: 55.268763
Surface Hole Longitude: -119.433748

For data sources see[1][2]

Well History

Date Event
2018-10-01 Obtained License
2019-02-18 Surface Casing Operation Performed
2019-02-19 Direction Drilling Operation Performed - Deviate
2019-02-23 Intermediate Casing Operation Performed
2019-02-26 Direction Drilling Operation Performed - Horizontal
2019-02-27 Well Log Performed
2019-03-08 Finished Drilling
2019-03-08 Well Log Performed
2019-03-08 Well Mode changed to Drilled and Cased
2019-03-09 Well Log Performed
2019-03-10 Liner Casing Operation Performed
2019-03-11 Rig Released
2019-06-02 Perforation Treatment Performed - Jet Perforation
2019-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-03 Perforation Treatment Performed - Jet Perforation
2019-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-07 Perforation Treatment Performed - Jet Perforation
2019-06-14 Perforation Treatment Performed - Fractured
2019-06-14 Perforation Treatment Performed - Jet Perforation
2019-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-15 Perforation Treatment Performed - Fractured
2019-06-15 Perforation Treatment Performed - Jet Perforation
2019-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-16 Perforation Treatment Performed - Fractured
2019-06-16 Perforation Treatment Performed - Jet Perforation
2019-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-17 Perforation Treatment Performed - Fractured
2019-06-17 Perforation Treatment Performed - Jet Perforation
2019-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-18 Perforation Treatment Performed - Fractured
2019-06-18 Perforation Treatment Performed - Jet Perforation
2019-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-19 Perforation Treatment Performed - Fractured
2019-06-19 Perforation Treatment Performed - Jet Perforation
2019-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-20 Perforation Treatment Performed - Fractured
2019-06-20 Perforation Treatment Performed - Jet Perforation
2019-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-21 Perforation Treatment Performed - Fractured
2019-06-21 Perforation Treatment Performed - Jet Perforation
2019-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-22 Perforation Treatment Performed - Jet Perforation
2019-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-23 Perforation Treatment Performed - Fractured
2019-06-23 Perforation Treatment Performed - Jet Perforation
2019-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-24 Perforation Treatment Performed - Fractured
2019-06-24 Perforation Treatment Performed - Jet Perforation
2019-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-25 Perforation Treatment Performed - Fractured
2019-06-25 Perforation Treatment Performed - Jet Perforation
2019-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-26 Perforation Treatment Performed - Fractured
2019-06-26 Perforation Treatment Performed - Jet Perforation
2019-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-27 Perforation Treatment Performed - Fractured
2019-06-27 Perforation Treatment Performed - Jet Perforation
2019-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-28 Perforation Treatment Performed - Fractured
2019-06-28 Perforation Treatment Performed - Jet Perforation
2019-06-29 Perforation Treatment Performed - Fractured
2019-07-01 Well Fluid changed to Gas
2019-07-01 Well Mode changed to Drilling and Completing
2019-11-01 Well Began Production
2019-11-01 Well Fluid changed to Gas
2019-11-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-17 Horizon Drilling Inc. 37 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-19 1455.30 Deviate (5 - 79 degrees)
2019-02-26 2699.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-06-02 Perforation 5067.10 5067.20 20
2019-06-14 Perforation 4997.10 4997.30 20
2019-06-21 Perforation 3877.10 3877.30 20
2019-06-21 Acid Treatment 3877.10 3937.30 0
2019-06-21 Fracture 3877.10 3937.30 0
2019-06-22 Perforation 3852.10 3852.30 20
2019-06-22 Perforation 3837.10 3837.30 20
2019-06-22 Perforation 3822.10 3822.30 20
2019-06-22 Perforation 3807.10 3807.30 20
2019-06-22 Perforation 3792.10 3792.30 20
2019-06-22 Acid Treatment 3792.10 3852.30 0
2019-06-23 Fracture 3792.10 3852.30 0
2019-06-14 Perforation 4982.10 4982.30 20
2019-06-23 Perforation 3767.10 3767.30 20
2019-06-23 Perforation 3752.10 3752.30 20
2019-06-23 Perforation 3737.10 3737.30 20
2019-06-23 Perforation 3722.10 3722.30 20
2019-06-23 Perforation 3707.10 3707.30 20
2019-06-23 Acid Treatment 3707.10 3767.30 0
2019-06-23 Fracture 3707.10 3767.30 0
2019-06-23 Perforation 3682.10 3682.30 20
2019-06-23 Perforation 3667.10 3667.30 20
2019-06-23 Perforation 3652.10 3652.30 20
2019-06-14 Fracture 4982.10 5042.30 0
2019-06-23 Perforation 3637.10 3637.30 20
2019-06-23 Perforation 3622.10 3622.30 20
2019-06-23 Acid Treatment 3622.10 3682.30 0
2019-06-24 Fracture 3622.10 3682.30 0
2019-06-24 Perforation 3597.10 3597.20 20
2019-06-24 Perforation 3582.10 3582.20 20
2019-06-24 Perforation 3567.10 3567.20 20
2019-06-24 Perforation 3552.10 3552.20 20
2019-06-24 Perforation 3537.10 3537.20 20
2019-06-24 Acid Treatment 3537.10 3597.20 0
2019-06-14 Perforation 4957.10 4957.30 20
2019-06-25 Fracture 3537.10 3597.20 0
2019-06-25 Perforation 3512.10 3512.30 20
2019-06-25 Perforation 3497.10 3497.30 20
2019-06-25 Perforation 3482.10 3482.30 20
2019-06-25 Perforation 3467.10 3467.30 20
2019-06-25 Perforation 3452.10 3452.30 20
2019-06-25 Acid Treatment 3452.10 3512.30 0
2019-06-25 Fracture 3452.10 3512.30 0
2019-06-25 Perforation 3427.10 3427.30 20
2019-06-25 Perforation 3412.10 3412.30 20
2019-06-14 Perforation 4942.10 4942.30 20
2019-06-25 Perforation 3397.10 3397.30 20
2019-06-25 Perforation 3382.10 3382.30 20
2019-06-25 Perforation 3367.10 3367.30 20
2019-06-25 Acid Treatment 3367.10 3427.30 0
2019-06-26 Fracture 3367.10 3427.30 0
2019-06-26 Perforation 3342.10 3342.20 20
2019-06-26 Perforation 3327.10 3327.20 20
2019-06-26 Perforation 3312.10 3312.20 20
2019-06-26 Perforation 3297.10 3297.20 20
2019-06-26 Perforation 3282.10 3282.20 20
2019-06-14 Perforation 4927.10 4927.30 20
2019-06-26 Acid Treatment 3282.10 3342.20 0
2019-06-26 Fracture 3282.10 3342.20 0
2019-06-26 Perforation 3257.10 3257.30 20
2019-06-26 Perforation 3242.10 3242.30 20
2019-06-26 Perforation 3227.10 3227.30 20
2019-06-26 Perforation 3212.10 3212.30 20
2019-06-26 Perforation 3197.10 3197.30 20
2019-06-26 Acid Treatment 3197.10 3257.30 0
2019-06-27 Fracture 3197.10 3257.30 0
2019-06-27 Perforation 3172.10 3172.20 20
2019-06-14 Perforation 4912.10 4912.30 20
2019-06-27 Perforation 3157.10 3157.20 20
2019-06-27 Perforation 3142.10 3142.20 20
2019-06-27 Perforation 3127.10 3127.20 20
2019-06-27 Perforation 3112.10 3112.20 20
2019-06-27 Acid Treatment 3112.10 3172.20 0
2019-06-27 Fracture 3112.10 3172.20 0
2019-06-27 Perforation 3087.10 3087.30 20
2019-06-27 Perforation 3072.10 3072.30 20
2019-06-27 Perforation 3057.10 3057.30 20
2019-06-27 Perforation 3042.10 3042.30 20
2019-06-14 Perforation 4897.10 4897.30 20
2019-06-27 Perforation 3027.10 3027.30 20
2019-06-27 Acid Treatment 3027.10 3087.30 0
2019-06-27 Fracture 3027.10 3087.30 0
2019-06-28 Perforation 3002.10 3002.20 20
2019-06-28 Perforation 2987.10 2987.20 20
2019-06-28 Perforation 2972.10 2972.20 20
2019-06-28 Perforation 2957.10 2957.20 20
2019-06-28 Perforation 2942.10 2942.20 20
2019-06-28 Acid Treatment 2942.10 3002.20 0
2019-06-28 Fracture 2942.10 3002.20 0
2019-06-15 Fracture 4897.10 4957.30 0
2019-06-28 Perforation 2917.10 2917.30 20
2019-06-28 Perforation 2902.10 2902.30 20
2019-06-28 Perforation 2887.10 2887.30 20
2019-06-28 Perforation 2872.10 2872.30 20
2019-06-28 Perforation 2857.10 2857.30 20
2019-06-28 Acid Treatment 2857.10 2917.30 0
2019-06-28 Fracture 2857.10 2917.30 0
2019-06-28 Perforation 2832.10 2832.20 20
2019-06-28 Perforation 2817.10 2817.20 20
2019-06-28 Perforation 2802.10 2802.20 20
2019-06-15 Perforation 4872.10 4872.30 20
2019-06-28 Perforation 2787.10 2787.20 20
2019-06-28 Perforation 2772.10 2772.20 20
2019-06-28 Acid Treatment 2772.10 2832.20 0
2019-06-29 Fracture 2772.10 2832.20 0
2019-06-03 Perforation 5082.00 5082.10 20
2019-06-15 Perforation 4857.10 4857.30 20
2019-06-15 Perforation 4842.10 4842.30 20
2019-06-15 Perforation 4827.10 4827.30 20
2019-06-15 Perforation 4812.10 4812.30 20
2019-06-15 Acid Treatment 4812.10 4872.30 0
2019-06-16 Fracture 4812.10 4872.30 0
2019-06-16 Perforation 4787.10 4787.30 20
2019-06-16 Perforation 4772.10 4772.30 20
2019-06-16 Perforation 4757.10 4757.30 20
2019-06-16 Perforation 4742.10 4742.30 20
2019-06-03 Acid Treatment 5067.10 5082.10 0
2019-06-16 Perforation 4727.10 4727.30 20
2019-06-16 Acid Treatment 4727.10 4787.30 0
2019-06-16 Fracture 4727.10 4787.30 0
2019-06-16 Perforation 4702.10 4702.30 20
2019-06-16 Perforation 4687.10 4687.30 20
2019-06-16 Perforation 4672.10 4672.30 20
2019-06-16 Perforation 4657.10 4657.30 20
2019-06-16 Perforation 4642.10 4642.30 20
2019-06-16 Acid Treatment 4642.10 4702.30 0
2019-06-17 Fracture 4642.10 4702.30 0
2019-06-07 Perforation 5075.00 5076.00 20
2019-06-17 Perforation 4617.10 4617.30 20
2019-06-17 Perforation 4602.10 4602.30 20
2019-06-17 Perforation 4587.10 4587.30 20
2019-06-17 Perforation 4572.10 4572.30 20
2019-06-17 Perforation 4557.10 4557.30 20
2019-06-17 Acid Treatment 4557.10 4617.30 0
2019-06-17 Fracture 4557.10 4617.30 0
2019-06-18 Perforation 4532.10 4532.30 20
2019-06-18 Perforation 4517.10 4517.30 20
2019-06-18 Perforation 4502.10 4502.30 20
2019-06-07 Acid Treatment 5075.00 5076.00 0
2019-06-18 Perforation 4487.10 4487.30 20
2019-06-18 Perforation 4472.10 4472.30 20
2019-06-18 Acid Treatment 4472.10 4532.30 0
2019-06-18 Fracture 4472.10 4532.30 0
2019-06-18 Perforation 4447.10 4447.30 20
2019-06-18 Perforation 4432.10 4432.30 20
2019-06-18 Perforation 4417.10 4417.30 20
2019-06-18 Perforation 4402.10 4402.30 20
2019-06-18 Perforation 4387.10 4387.30 20
2019-06-18 Acid Treatment 4387.10 4447.30 0
2019-06-14 Fracture 5067.10 5082.10 0
2019-06-18 Fracture 4387.10 4447.30 0
2019-06-18 Perforation 4362.10 4362.30 20
2019-06-18 Perforation 4347.10 4347.30 20
2019-06-18 Perforation 4332.10 4332.30 20
2019-06-18 Perforation 4317.10 4317.30 20
2019-06-18 Perforation 4302.10 4302.30 20
2019-06-19 Acid Treatment 4302.10 4362.30 0
2019-06-19 Fracture 4302.10 4362.30 0
2019-06-19 Perforation 4277.10 4277.30 20
2019-06-19 Perforation 4262.10 4262.30 20
2019-06-14 Perforation 5042.10 5042.30 20
2019-06-19 Perforation 4247.10 4247.30 20
2019-06-19 Perforation 4232.10 4232.30 20
2019-06-19 Perforation 4217.10 4217.30 20
2019-06-19 Acid Treatment 4217.10 4277.30 0
2019-06-20 Fracture 4217.10 4277.30 0
2019-06-20 Perforation 4192.10 4192.30 20
2019-06-20 Perforation 4177.10 4177.30 20
2019-06-20 Perforation 4162.10 4162.30 20
2019-06-20 Perforation 4147.10 4147.30 20
2019-06-20 Perforation 4132.10 4132.30 20
2019-06-14 Perforation 5027.10 5027.30 20
2019-06-20 Acid Treatment 4132.10 4192.30 0
2019-06-20 Fracture 4132.10 4192.30 0
2019-06-20 Perforation 4107.10 4107.30 20
2019-06-20 Perforation 4092.10 4092.30 20
2019-06-20 Perforation 4077.10 4077.30 20
2019-06-20 Perforation 4062.10 4062.30 20
2019-06-20 Perforation 4047.10 4047.30 20
2019-06-20 Acid Treatment 4047.10 4107.30 0
2019-06-21 Fracture 4047.10 4107.30 0
2019-06-21 Perforation 4022.10 4022.30 20
2019-06-14 Perforation 5012.10 5012.30 20
2019-06-21 Perforation 4007.10 4007.30 20
2019-06-21 Perforation 3992.10 3992.30 20
2019-06-21 Perforation 3977.10 3977.30 20
2019-06-21 Perforation 3962.10 3962.30 20
2019-06-21 Acid Treatment 3962.10 4022.30 0
2019-06-21 Fracture 3962.10 4022.30 0
2019-06-21 Perforation 3937.10 3937.30 20
2019-06-21 Perforation 3922.10 3922.30 20
2019-06-21 Perforation 3907.10 3907.30 20
2019-06-21 Perforation 3892.10 3892.30 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-06-14 2019-06-29 2,513 32,219 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 82.8101 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 16.1625 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.6442 N/A
Water 7732-18-5 100 0.6442 N/A
ResCare CS BJ Services Clay Control Choline chloride 67-48-1 100 0.0877 N/A
Non-hazardous Not Available 100 0.0877 N/A
Water 7732-18-5 100 0.0877 N/A
MatrixCare CI-01 BJ Services Corrosion Inhibitor 1.2-ethanediol 107-21-1 100 0.0006 N/A
1-decanol 112-30-1 100 0.0006 N/A
1-octanol 111-87-5 100 0.0006 N/A
2-butoxy ethanol 111-76-2 100 0.0006 N/A
2-propanol 67-63-0 100 0.0006 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.0006 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.0006 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.0006 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.0006 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.0006 N/A
Water 7732-18-5 100 0.0006 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
ThinFrac PW FRP-02 BJ Services Friction Reducer Alcohols. C10-16. ethoxylated 68002-97-1 100 0.0632 N/A
Petroleum Distillates. Hydrotreated light naphthenic 64742-53-6 100 0.0632 N/A
Polyacrylamide 5/8/9003 100 0.0632 N/A
Ferrotrol 300 BJ Services Iron Control Citric acid 77-92-9 100 0.006 N/A
FraCare SI-02W BJ Services Scale Inhibitor Methanol 67-56-1 100 0.0428 N/A
non-hazardous ingredients Not Available 100 0.0428 N/A
Organo Phosphorus Salt Trade Secret 100 0.0428 N/A
Sodium Bisulfite 7631-90-5 100 0.0428 N/A
PAO23 BJ Services Solvent 1.2.3-Trimethylbenzene 526-73-8 100 0.0392 N/A
1.2.4-Trimethylbenzene 95-63-6 100 0.0392 N/A
1.3.5-Trimethylbenzene 108-67-8 100 0.0392 N/A
Cumene 98-82-8 100 0.0392 N/A
Light aromatic naphtha 64742-95-6 100 0.0392 N/A
Xylene 1330-20-7 100 0.0392 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-06-13 2019-06-29 Surface Water - Runoff 32576

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 825 0.0 0.0 0.0
2020 1529 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-11 No Incident Encountered 0.00 0.00
2019-08-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References