X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726111907000

Well Details

Well ID: 0726111907000
Loading map...
Location: 00/07-19-072-11W6/0
Location Alias: 00/07-19-72-11 W6M
Location Alias 2: 00/07-19-072-11 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 11
Section: 19
County/Municipality: County of Grande Prairie No. 1
Well Name: CVE SINCLAIR 7-19-72-11
Operator Name: Cenovus Energy Inc.
License Number: 0066497
License Date: 1977-11-03
License Status: Suspension
Spud Date: 1977-11-09
Final Drill Date: 1977-12-19
Well Total Depth: 2639.00 m
Surface Hole Latitude: 55.247806
Surface Hole Longitude: -119.674518

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-03 Obtained License
1977-12-11 Kick Occurred
1977-12-16 Kick Occurred
1977-12-19 Finished Drilling
1977-12-21 Kick Occurred
1977-12-23 Kick Occurred
1978-01-01 Kick Occurred
1978-01-03 Production Casing Operation Performed
1978-01-18 Perforation Treatment Performed - Jet Perforation
1978-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-11 Perforation Treatment Performed - Jet Perforation
1978-03-14 Perforation Treatment Performed - Jet Perforation
1978-03-17 Perforation Treatment Performed - Cement Squeeze
1978-03-19 Perforation Treatment Performed - Cement Squeeze
1978-04-04 Well Mode changed to Drilled and Cased
1979-11-01 Well Mode changed to Drilled and Cased
1997-02-14 Perforation Treatment Performed - Cement Squeeze
1997-02-14 Well Log Performed
1997-02-17 Perforation Treatment Performed - Jet Perforation
1997-02-17 Well Log Performed
2002-01-29 Well Log Performed
2002-03-25 Perforation Treatment Performed - Cement Squeeze
2002-04-12 Well Log Performed
2002-04-13 Perforation Treatment Performed - Fractured
2004-07-16 Well Began Production
2004-07-16 Well Fluid changed to Gas
2004-07-16 Well Mode changed to Flowing
2005-10-01 Well Fluid changed to Gas
2005-10-01 Well Mode changed to Suspended
2006-12-01 Well Fluid changed to Gas
2006-12-01 Well Mode changed to Flowing
2020-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-12 Plug Back Performed
2020-03-12 Well Fluid changed to Gas
2020-03-12 Well Mode changed to Abandoned Zone
2020-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-13 Perforation Treatment Performed - Cement Plug
2020-03-13 Plug Back Performed
2020-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-15 Perforation Treatment Performed - Jet Perforation
2020-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-16 Perforation Treatment Performed - Jet Perforation
2020-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-17 Perforation Treatment Performed - Cement Plug
2020-03-17 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-18 Perforation 2507.60 2510.00 10
2002-03-25 Cement Squeeze 2252.50 2268.50 0
2002-03-25 Cement Squeeze 2237.80 2245.80 0
2002-04-13 Fracture 2507.60 2510.00 0
2020-03-12 Packing Device Capped w/Cement 2479.80 2487.80 0
2020-03-13 Cement Plug 1600.00 1768.00 0
2020-03-13 Packing Device Capped w/Cement 2221.80 2229.80 0
2020-03-15 Packing Device Capped w/Cement 541.80 549.80 0
2020-03-15 Perforation 559.50 560.00 14
2020-03-15 Perforation 460.50 461.50 14
2020-03-15 Packing Device Capped w/Cement 448.80 456.80 0
1978-01-21 Acid Treatment 2507.60 2510.00 0
2020-03-16 Perforation 277.00 278.00 18
2020-03-16 Perforation 386.50 387.50 14
2020-03-16 Perforation 418.00 419.00 14
2020-03-16 Packing Device Capped w/Cement 397.80 405.80 0
2020-03-16 Packing Device Capped w/Cement 367.80 375.80 0
2020-03-17 Cement Plug 266.30 278.00 0
2020-03-17 Cement Squeeze 277.00 278.00 0
2020-03-17 Packing Device Capped w/Cement 241.00 265.80 0
1978-03-11 Perforation 1742.20 1750.20 3
1978-03-14 Perforation 1700.20 1705.10 3
1978-03-17 Cement Squeeze 1700.20 1705.10 0
1978-03-19 Cement Squeeze 1700.20 1705.10 0
1997-02-14 Cement Squeeze 1742.20 1750.20 0
1997-02-17 Perforation 2252.50 2268.50 13
1997-02-17 Perforation 2237.80 2245.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 2164 0.0 0.0 0.0
2005 1358 0.0 0.0 0.0
2006 166 0.0 0.0 0.0
2007 558 0.0 0.0 0.0
2008 3919 0.0 0.0 0.0
2009 5943 0.0 0.0 0.0
2010 2583 0.0 0.0 0.0
2011 5776 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8663 0.0 0.0 0.0
2014 6576 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 2088 0.0 0.0 0.0
2017 27 0.0 0.0 0.0
2018 720 0.0 0.0 0.0
2020 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-12-11 Kick 2517.00 2517.00
1977-12-16 Kick 2591.10 2591.10
1977-12-21 Kick 2639.00 2639.00
1977-12-23 Kick 2531.10 2531.10
1978-01-01 Kick 2639.00 2639.00
2020-03-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References