If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0736032110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.339021,"lon":-118.39545,"icon":""}]} |
Location: 00/10-21-073-03W6/0 | |
Location Alias: 00/10-21-73-03 W6M | |
Location Alias 2: 00/10-21-073-03 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 6 | |
Range: 03 | |
Section: 21 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CNRL TEEPEE 10-21-73-3 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0041475 | |
License Date: 1971-11-30 | |
License Status: Abandoned | |
Spud Date: 1971-12-04 | |
Final Drill Date: 1972-01-27 | |
Well Total Depth: 3012.60 m | |
Surface Hole Latitude: 55.339021 | |
Surface Hole Longitude: -118.395450 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1971-11-30 | Obtained License |
1971-12-15 | Drill Stem Test Performed |
1971-12-20 | Drill Stem Test Performed |
1972-01-07 | Drill Stem Test Performed |
1972-01-10 | Drill Stem Test Performed |
1972-01-15 | Drill Stem Test Performed |
1972-01-16 | Drill Stem Test Performed |
1972-01-17 | Drill Stem Test Performed |
1972-01-22 | Production Casing Operation Performed |
1972-01-27 | Finished Drilling |
1972-01-28 | Drill Stem Test Performed |
1972-05-28 | Perforation Treatment Performed - Selective Jet Perforations |
1972-05-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-06-09 | Perforation Treatment Performed - Cement Squeeze |
1972-06-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-06-17 | Perforation Treatment Performed - Cement Squeeze |
1972-06-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-06-23 | Well Mode changed to Drilled and Cased |
1977-12-20 | Well Began Production |
1977-12-20 | Well Fluid changed to Gas |
1977-12-20 | Well Mode changed to Flowing |
1988-07-16 | Well Log Performed |
1988-08-01 | Well Log Performed |
1990-09-12 | Well Log Performed |
1999-03-01 | Well Fluid changed to Gas |
1999-03-01 | Well Mode changed to Suspended |
2004-08-22 | Perforation Treatment Performed - Jet Perforation |
2004-08-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-08-25 | Plug Back Performed |
2004-08-25 | Well Fluid changed to Gas |
2004-08-25 | Well Log Performed |
2004-08-25 | Well Mode changed to Abandoned Zone |
2004-08-26 | Well Log Performed |
2004-08-27 | Perforation Treatment Performed - Cement Plug |
2004-08-27 | Plug Back Performed |
2004-08-28 | Well Log Performed |
2004-08-29 | Perforation Treatment Performed - Jet Perforation |
2004-08-29 | Well Log Performed |
2004-08-30 | Perforation Treatment Performed - Cement Plug |
2004-08-30 | Perforation Treatment Performed - Jet Perforation |
2004-08-31 | Perforation Treatment Performed - Jet Perforation |
2004-08-31 | Well Log Performed |
2004-09-01 | Perforation Treatment Performed - Cement Plug |
2004-09-01 | Perforation Treatment Performed - Jet Perforation |
2004-09-01 | Plug Back Performed |
2004-09-02 | Perforation Treatment Performed - Jet Perforation |
2004-09-02 | Well Log Performed |
2004-09-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-09-03 | Perforation Treatment Performed - Jet Perforation |
2004-09-03 | Well Log Performed |
2004-09-04 | Perforation Treatment Performed - Cement Squeeze |
2004-09-04 | Plug Back Performed |
2004-09-07 | Perforation Treatment Performed - Jet Perforation |
2004-09-07 | Perforation Treatment Performed - Remedial Casing |
2004-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-09-10 | Plug Back Performed |
2004-09-30 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-05-28 | Selective Jet Perforations | 2804.80 | 2805.40 | 0 |
1972-05-28 | Selective Jet Perforations | 2718.20 | 2718.80 | 0 |
1972-05-28 | Selective Jet Perforations | 2719.40 | 2720.60 | 0 |
1972-05-28 | Selective Jet Perforations | 2721.60 | 2723.10 | 0 |
1972-05-28 | Selective Jet Perforations | 2725.20 | 2727.40 | 0 |
1972-05-28 | Selective Jet Perforations | 2730.10 | 2732.20 | 0 |
1972-05-28 | Selective Jet Perforations | 2732.80 | 2733.80 | 0 |
1972-05-28 | Selective Jet Perforations | 2734.40 | 2735.60 | 0 |
1972-05-28 | Selective Jet Perforations | 2736.20 | 2737.10 | 0 |
1972-05-28 | Selective Jet Perforations | 2738.30 | 2738.30 | 0 |
1972-05-29 | Acid Treatment | 2804.80 | 2808.40 | 0 |
1972-05-28 | Selective Jet Perforations | 2806.00 | 2806.60 | 0 |
1972-06-09 | Cement Squeeze | 2804.80 | 2808.40 | 0 |
1972-06-11 | Acid Treatment | 2762.40 | 2772.20 | 0 |
1972-06-17 | Cement Squeeze | 2762.40 | 2772.20 | 0 |
1972-06-20 | Acid Treatment | 2715.20 | 2738.30 | 0 |
2004-08-22 | Perforation | 2678.70 | 2679.00 | 4 |
2004-08-25 | Packing Device Capped w/Cement | 2670.80 | 2678.80 | 0 |
2004-08-27 | Cement Plug | 1826.00 | 1866.00 | 0 |
2004-08-29 | Perforation | 775.00 | 776.00 | 13 |
2004-08-30 | Perforation | 775.00 | 776.00 | 13 |
2004-08-30 | Cement Plug | 756.00 | 792.00 | 0 |
1972-05-28 | Selective Jet Perforations | 2807.80 | 2808.40 | 0 |
2004-08-31 | Perforation | 650.00 | 651.00 | 17 |
2004-09-01 | Perforation | 650.00 | 651.00 | 17 |
2004-09-01 | Cement Plug | 631.20 | 667.00 | 0 |
2004-09-02 | Perforation | 395.00 | 396.00 | 17 |
2004-09-03 | Packing Device Capped w/Cement | 383.00 | 390.70 | 0 |
2004-09-03 | Perforation | 349.00 | 350.00 | 17 |
2004-09-03 | Perforation | 325.00 | 326.00 | 17 |
2004-09-04 | Cement Squeeze | 325.00 | 350.00 | 0 |
2004-09-07 | Perforation | 283.00 | 285.20 | 17 |
2004-09-07 | Remedial Casing Cementing | 283.00 | 285.20 | 0 |
1972-05-28 | Selective Jet Perforations | 2762.40 | 2762.70 | 0 |
2004-09-10 | Packing Device Capped w/Cement | 256.70 | 276.70 | 0 |
1972-05-28 | Selective Jet Perforations | 2763.00 | 2763.30 | 0 |
1972-05-28 | Selective Jet Perforations | 2766.10 | 2768.80 | 0 |
1972-05-28 | Selective Jet Perforations | 2769.40 | 2772.20 | 0 |
1972-05-28 | Selective Jet Perforations | 2715.20 | 2716.40 | 0 |
1972-05-28 | Selective Jet Perforations | 2717.00 | 2717.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 17 | 0.0 | 0.0 | 0.0 |
1978 | 3863 | 0.0 | 0.0 | 0.0 |
1979 | 6707 | 0.0 | 0.0 | 0.0 |
1980 | 4748 | 0.0 | 0.0 | 0.0 |
1981 | 6512 | 0.0 | 0.0 | 0.0 |
1982 | 7511 | 0.0 | 0.0 | 0.0 |
1983 | 5499 | 0.0 | 0.0 | 0.0 |
1984 | 5711 | 0.0 | 0.0 | 0.0 |
1985 | 6428 | 0.0 | 0.0 | 0.0 |
1986 | 3964 | 0.0 | 0.0 | 0.0 |
1987 | 3611 | 0.0 | 0.0 | 0.0 |
1988 | 3227 | 0.0 | 0.0 | 0.0 |
1989 | 2336 | 0.0 | 0.0 | 0.0 |
1990 | 6799 | 0.0 | 0.0 | 0.0 |
1991 | 7316 | 0.0 | 0.0 | 0.0 |
1992 | 6734 | 0.0 | 0.0 | 0.0 |
1993 | 7655 | 0.0 | 0.0 | 0.0 |
1994 | 4833 | 0.0 | 0.0 | 0.0 |
1995 | 4373 | 0.0 | 0.0 | 0.0 |
1996 | 7620 | 0.0 | 0.0 | 0.0 |
1997 | 3174 | 0.0 | 0.0 | 0.0 |
For data sources see[5]