If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0736032806002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.34995,"lon":-118.402725,"icon":""}]} |
Location: 00/06-28-073-03W6/2 | |
Location Alias: 00/06-28-73-03 W6M | |
Location Alias 2: 00/06-28-073-03 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 6 | |
Range: 03 | |
Section: 28 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CNRL TEEPEE 6-28-73-3 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0081218 | |
License Date: 1980-02-19 | |
License Status: Abandoned | |
Spud Date: 1980-04-12 | |
Final Drill Date: 1980-06-08 | |
Well Total Depth: 2821.00 m | |
Surface Hole Latitude: 55.349950 | |
Surface Hole Longitude: -118.402725 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-02-19 | Obtained License |
1980-06-08 | Finished Drilling |
1980-06-08 | Well Log Performed |
1980-06-08 | Well Mode changed to Drilled and Cased |
1980-06-09 | Well Log Performed |
1980-06-10 | Drill Stem Test Performed |
1980-06-13 | Production Casing Operation Performed |
1980-09-19 | Perforation Treatment Performed - Jet Perforation |
1980-09-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-11-10 | Perforation Treatment Performed - Jet Perforation |
1982-11-11 | Perforation Treatment Performed - Cement Squeeze |
1982-11-15 | Perforation Treatment Performed - Cement Squeeze |
1982-11-19 | Perforation Treatment Performed - Jet Perforation |
1982-11-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-11-20 | Perforation Treatment Performed - Cement Squeeze |
1982-11-26 | Perforation Treatment Performed - Jet Perforation |
1982-11-27 | Perforation Treatment Performed - Jet Perforation |
1982-12-18 | Perforation Treatment Performed - Fractured |
1984-09-08 | Perforation Treatment Performed - Jet Perforation |
1984-09-08 | Well Log Performed |
1984-09-21 | Well Began Production |
1984-09-21 | Well Fluid changed to Gas |
1984-09-21 | Well Mode changed to Flowing |
1987-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-03-10 | Plug Back Performed |
1987-03-10 | Well Fluid changed to Gas |
1987-03-10 | Well Log Performed |
1987-03-10 | Well Mode changed to Flowing |
1988-10-01 | Well Fluid changed to Gas |
1988-10-01 | Well Mode changed to Suspended |
1990-02-01 | Well Fluid changed to Gas |
1990-02-01 | Well Mode changed to Flowing |
1996-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-10-26 | Plug Back Performed |
1996-10-28 | Well Abandoned |
1996-10-28 | Well Fluid changed to Gas |
1996-10-28 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-09-19 | Perforation | 2772.00 | 2778.00 | 13 |
1982-11-26 | Perforation | 2774.60 | 2779.60 | 13 |
1982-11-27 | Perforation | 2750.30 | 2756.60 | 13 |
1982-11-27 | Perforation | 2752.10 | 2753.30 | 13 |
1982-12-18 | Fracture | 2750.30 | 2756.60 | 0 |
1984-09-08 | Perforation | 1887.00 | 1889.50 | 13 |
1984-09-08 | Perforation | 1890.50 | 1900.00 | 13 |
1987-03-10 | Packing Device Capped w/Cement | 2726.00 | 2737.90 | 0 |
1996-10-26 | Packing Device Capped w/Cement | 1874.00 | 1882.00 | 0 |
1980-09-19 | Perforation | 2779.00 | 2782.00 | 13 |
1980-09-28 | Acid Treatment | 2772.00 | 2782.00 | 0 |
1982-11-10 | Perforation | 2796.90 | 2798.40 | 7 |
1982-11-11 | Cement Squeeze | 2772.00 | 2798.40 | 0 |
1982-11-15 | Cement Squeeze | 2772.00 | 2798.40 | 0 |
1982-11-19 | Perforation | 2781.80 | 2782.80 | 7 |
1982-11-20 | Acid Treatment | 2781.80 | 2782.80 | 0 |
1982-11-20 | Cement Squeeze | 2781.80 | 2782.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 1415 | 0.0 | 0.0 | 0.0 |
1985 | 6418 | 0.0 | 0.0 | 0.0 |
1986 | 5479 | 0.0 | 0.0 | 0.0 |
1987 | 938 | 0.0 | 0.0 | 0.0 |
1988 | 619 | 0.0 | 0.0 | 0.0 |
1990 | 5043 | 0.0 | 0.0 | 0.0 |
1991 | 1251 | 0.0 | 0.0 | 0.0 |
1992 | 23 | 0.0 | 0.0 | 0.0 |
1993 | 518 | 0.0 | 0.0 | 0.0 |
For data sources see[5]