If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0736032910002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.35372,"lon":-118.418466,"icon":""}]} |
Location: 00/10-29-073-03W6/2 | |
Location Alias: 00/10-29-73-03 W6M | |
Location Alias 2: 00/10-29-073-03 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 6 | |
Range: 03 | |
Section: 29 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: ENCOR ET AL TEEPEE 10-29-73-3 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0045477 | |
License Date: 1973-03-23 | |
License Status: RecCertified | |
Spud Date: 1973-03-25 | |
Final Drill Date: 1973-04-28 | |
Well Total Depth: 2883.40 m | |
Surface Hole Latitude: 55.353720 | |
Surface Hole Longitude: -118.418466 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1973-03-23 | Obtained License |
1973-04-28 | Finished Drilling |
1973-04-29 | Drill Stem Test Performed |
1973-05-01 | Production Casing Operation Performed |
1973-06-09 | Perforation Treatment Performed - Jet Perforation |
1973-06-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1976-09-29 | Perforation Treatment Performed - Cement Squeeze |
1976-09-29 | Perforation Treatment Performed - Jet Perforation |
1976-10-01 | Perforation Treatment Performed - Jet Perforation |
1976-10-01 | Well Mode changed to Drilled and Cased |
1978-01-14 | Well Began Injection |
1978-01-14 | Well Fluid changed to Water |
1978-01-14 | Well Type changed to Disposal |
1984-01-10 | Perforation Treatment Performed - Jet Perforation |
1984-01-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-01-11 | Perforation Treatment Performed - Fractured |
1984-01-18 | Well Log Performed |
1988-03-25 | Well Fluid changed to Water |
1988-03-25 | Well Mode changed to Suspended |
1988-03-25 | Well Type changed to Disposal |
1997-01-30 | Well Log Performed |
1997-01-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-01-31 | Plug Back Performed |
1997-01-31 | Well Log Performed |
1997-02-02 | Well Abandoned |
1997-02-02 | Well Fluid changed to Water |
1997-02-02 | Well Mode changed to Abandoned |
1997-02-02 | Well Type changed to Disposal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-06-09 | Perforation | 1561.80 | 1564.80 | 7 |
1984-01-10 | Perforation | 993.00 | 1004.60 | 13 |
1984-01-11 | Fracture | 993.00 | 1004.60 | 0 |
1984-01-11 | Acid Treatment | 993.00 | 1004.60 | 0 |
1997-01-31 | Packing Device Capped w/Cement | 977.00 | 985.00 | 0 |
1997-01-31 | Packing Device Capped w/Cement | 954.50 | 962.60 | 0 |
1973-06-11 | Acid Treatment | 1561.80 | 1564.80 | 0 |
1973-06-17 | Acid Treatment | 1561.80 | 1564.80 | 0 |
1976-09-29 | Packing Device Capped w/Cement | 1548.40 | 1548.40 | 0 |
1976-09-29 | Perforation | 1010.40 | 1011.30 | 7 |
1976-09-29 | Perforation | 966.20 | 967.10 | 7 |
1976-09-29 | Acid Treatment | 966.20 | 1011.30 | 0 |
1976-09-29 | Cement Squeeze | 966.20 | 1011.30 | 0 |
1976-10-01 | Perforation | 993.00 | 1004.60 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]