If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0736091512020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.317165,"lon":-119.278859,"icon":""}]} |
Location: 02/12-15-073-09W6/0 | |
Location Alias: 02/12-15-73-09 W6M | |
Location Alias 2: 02/12-15-073-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 6 | |
Range: 09 | |
Section: 15 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CNRL HZ 102 HYTHE 12-15-73-9 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0444318 | |
License Date: 2012-02-21 | |
License Status: Amended | |
Spud Date: 2012-03-18 | |
Final Drill Date: 2012-04-28 | |
Well Total Depth: 4013.00 m | |
Surface Hole Latitude: 55.317165 | |
Surface Hole Longitude: -119.278859 |
Date | Event |
---|---|
2012-02-21 | Obtained License |
2012-03-19 | Surface Casing Operation Performed |
2012-03-22 | Well Log Performed |
2012-03-24 | Direction Drilling Operation Performed - Deviate |
2012-03-30 | Direction Drilling Operation Performed - Horizontal |
2012-03-30 | Well Log Performed |
2012-03-31 | Well Log Performed |
2012-04-20 | Well Log Performed |
2012-04-28 | Finished Drilling |
2012-04-28 | Well Log Performed |
2012-04-28 | Well Mode changed to Drilled and Cased |
2012-04-30 | Production Casing Operation Performed |
2012-04-30 | Rig Released |
2012-07-29 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-07-29 | Perforation Treatment Performed - Fractured |
2012-07-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-31 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2012-07-31 | Perforation Treatment Performed - Fractured |
2012-07-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-01 | Well Began Production |
2012-09-01 | Well Fluid changed to Crude Oil |
2012-09-01 | Well Mode changed to Flowing |
2019-07-01 | Well Fluid changed to Crude Oil |
2019-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-18 | Precision Drilling Corporation | 153 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-24 | 1975.00 | Deviate (5 - 79 degrees) |
2012-03-30 | 2315.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-29 | Hydra Jet Perforation | 3975.30 | 3975.50 | 0 |
2012-07-31 | Hydra Jet Perforation | 3031.00 | 3031.20 | 0 |
2012-07-31 | Fracture | 3031.00 | 3031.20 | 0 |
2012-07-31 | Multi-Stage Fracture | 2868.80 | 2868.90 | 0 |
2012-07-31 | Multi-Stage Fracture | 2738.60 | 2738.70 | 0 |
2012-07-31 | Multi-Stage Fracture | 2608.80 | 2608.90 | 0 |
2012-07-31 | Multi-Stage Fracture | 2478.90 | 2479.00 | 0 |
2012-07-31 | Multi-Stage Fracture | 2363.90 | 2364.00 | 0 |
2012-07-29 | Fracture | 3975.30 | 3975.50 | 0 |
2012-07-30 | Multi-Stage Fracture | 3882.40 | 3882.50 | 0 |
2012-07-30 | Multi-Stage Fracture | 3752.50 | 3752.60 | 0 |
2012-07-30 | Multi-Stage Fracture | 3623.90 | 3624.00 | 0 |
2012-07-31 | Multi-Stage Fracture | 3495.60 | 3495.70 | 0 |
2012-07-31 | Multi-Stage Fracture | 3381.10 | 3381.20 | 0 |
2012-07-31 | Multi-Stage Fracture | 3266.90 | 3267.00 | 0 |
2012-07-31 | Multi-Stage Fracture | 3152.60 | 3152.70 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2054 | 0.0 | 0.0 | 0.0 |
2013 | 6590 | 0.0 | 0.0 | 0.0 |
2014 | 6845 | 0.0 | 0.0 | 0.0 |
2015 | 7640 | 0.0 | 0.0 | 0.0 |
2016 | 8260 | 0.0 | 0.0 | 0.0 |
2017 | 8155 | 0.0 | 0.0 | 0.0 |
2018 | 7935 | 0.0 | 0.0 | 0.0 |
2019 | 6079 | 0.0 | 0.0 | 0.0 |
2020 | 1906 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-30 | No Incident Encountered | 0.00 | 0.00 |
2012-08-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]