If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0736092108000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.337247,"lon":-119.308847,"icon":""}]} |
Location: 00/08-21-073-09W6/0 | |
Location Alias: 00/08-21-73-09 W6M | |
Location Alias 2: 00/08-21-073-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 6 | |
Range: 09 | |
Section: 21 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: CNRL HYTHE 8-21-73-9 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0111528 | |
License Date: 1984-12-10 | |
License Status: Suspension | |
Spud Date: 1984-12-13 | |
Final Drill Date: 1985-01-03 | |
Well Total Depth: 2325.00 m | |
Surface Hole Latitude: 55.337247 | |
Surface Hole Longitude: -119.308847 |
Date | Event |
---|---|
1984-01-04 | Well Log Performed |
1984-12-10 | Obtained License |
1984-12-14 | Surface Casing Operation Performed |
1985-01-01 | Drill Stem Test Performed |
1985-01-03 | Finished Drilling |
1985-01-03 | Well Mode changed to Drilled and Cased |
1985-01-04 | Well Log Performed |
1985-01-05 | Drill Stem Test Performed |
1985-01-06 | Production Casing Operation Performed |
1985-01-07 | Rig Released |
1985-01-25 | Perforation Treatment Performed - Jet Perforation |
1985-01-25 | Well Log Performed |
1985-01-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-01-29 | Perforation Treatment Performed - Fractured |
1985-02-03 | Well Log Performed |
1985-02-10 | Well Began Production |
1985-02-10 | Well Fluid changed to Crude Oil |
1985-02-10 | Well Mode changed to Flowing |
1985-02-20 | Well Fluid changed to Crude Oil |
1985-02-20 | Well Mode changed to Suspended |
1986-12-16 | Well Fluid changed to Crude Oil |
1986-12-16 | Well Mode changed to Flowing |
1994-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-03-09 | Well Log Performed |
1995-11-30 | Well Fluid changed to Crude Oil |
1995-11-30 | Well Mode changed to Suspended |
1999-08-06 | Perforation Treatment Performed - Cement Squeeze |
1999-08-06 | Perforation Treatment Performed - Jet Perforation |
1999-08-06 | Well Fluid changed to Crude Oil |
1999-08-06 | Well Mode changed to Abandoned Zone |
1999-08-09 | Well Log Performed |
1999-08-10 | Perforation Treatment Performed - Jet Perforation |
1999-08-12 | Perforation Treatment Performed - Fractured |
2015-11-02 | Well Log Performed |
2015-11-03 | Well Log Performed |
2015-11-04 | Well Log Performed |
2015-11-12 | Perforation Treatment Performed - Jet Perforation |
2015-11-12 | Well Log Performed |
2015-11-14 | Perforation Treatment Performed - Remedial Casing |
2019-02-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-02-07 | Plug Back Performed |
2019-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-01-25 | Perforation | 2214.50 | 2219.00 | 10 |
1999-08-12 | Fracture | 2246.00 | 2252.00 | 0 |
2015-11-12 | Perforation | 334.00 | 335.00 | 13 |
2015-11-14 | Remedial Casing Cementing | 334.00 | 335.00 | 0 |
2019-02-07 | Packing Device Capped w/Cement | 2224.00 | 2236.00 | 0 |
2019-02-08 | Packing Device Capped w/Cement | 2200.00 | 2208.00 | 0 |
2019-02-09 | Packing Device Capped w/Cement | 313.00 | 321.00 | 0 |
1985-01-25 | Perforation | 2220.00 | 2225.50 | 10 |
1985-01-25 | Perforation | 2228.00 | 2230.00 | 10 |
1985-01-27 | Acid Treatment | 2214.50 | 2230.00 | 0 |
1985-01-29 | Fracture | 2214.50 | 2230.00 | 0 |
1994-03-09 | Packing Device Capped w/Cement | 2202.00 | 2210.00 | 0 |
1999-08-06 | Perforation | 2214.50 | 2230.00 | 14 |
1999-08-06 | Cement Squeeze | 2214.50 | 2230.00 | 0 |
1999-08-10 | Perforation | 2246.00 | 2252.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 240 | 0.0 | 0.0 | 0.0 |
1986 | 379 | 0.0 | 0.0 | 0.0 |
1987 | 7112 | 0.0 | 0.0 | 0.0 |
1988 | 7286 | 0.0 | 0.0 | 0.0 |
1989 | 8358 | 0.0 | 0.0 | 0.0 |
1990 | 6429 | 0.0 | 0.0 | 0.0 |
1991 | 7895 | 0.0 | 0.0 | 0.0 |
1992 | 8242 | 0.0 | 0.0 | 0.0 |
1993 | 7646 | 0.0 | 0.0 | 0.0 |
1994 | 1580 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-11-30 | No Incident Encountered | 0.00 | 0.00 |
2019-02-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]