X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0736092308000

Well Details

Well ID: 0736092308000
Loading map...
Location: 00/08-23-073-09W6/0
Location Alias: 00/08-23-73-09 W6M
Location Alias 2: 00/08-23-073-09 W6/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 6
Range: 09
Section: 23
County/Municipality: County of Grande Prairie No. 1
Well Name: CNRL HYTHE 8-23-73-9
Operator Name: Canadian Natural Resources Limited
License Number: 0116013
License Date: 1985-07-11
License Status: Suspension
Spud Date: 1985-07-26
Final Drill Date: 1985-08-20
Well Total Depth: 2248.00 m
Surface Hole Latitude: 55.337239
Surface Hole Longitude: -119.262191

For data sources see[1][2]

Well History

Date Event
1985-07-11 Obtained License
1985-07-28 Surface Casing Operation Performed
1985-07-31 Drill Stem Test Performed
1985-08-02 Drill Stem Test Performed
1985-08-08 Drill Stem Test Performed
1985-08-09 Drill Stem Test Performed
1985-08-20 Finished Drilling
1985-08-21 Well Log Performed
1985-08-22 Drill Stem Test Performed
1985-08-22 Well Log Performed
1985-08-24 Production Casing Operation Performed
1985-08-24 Rig Released
1985-08-24 Well Mode changed to Drilled and Cased
1985-09-26 Perforation Treatment Performed - Jet Perforation
1985-09-26 Well Log Performed
1985-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-29 Perforation Treatment Performed - Fractured
1988-03-05 Well Began Production
1988-03-05 Well Fluid changed to Gas
1988-03-05 Well Mode changed to Flowing
2001-06-14 Well Log Performed
2001-06-15 Perforation Treatment Performed - Jet Perforation
2001-06-15 Well Log Performed
2001-06-17 Perforation Treatment Performed - Fractured
2001-06-22 Well Fluid changed to Gas
2001-06-22 Well Mode changed to Flowing
2011-03-31 Well Fluid changed to Gas
2011-03-31 Well Mode changed to Suspended
2012-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-04 Well Log Performed
2012-03-05 Perforation Treatment Performed - Cement Squeeze
2012-03-05 Plug Back Performed
2012-03-10 Perforation Treatment Performed - Jet Perforation
2012-03-10 Well Log Performed
2012-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-06-30 Well Log Performed
2016-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-07-02 Perforation Treatment Performed - Jet Perforation
2016-07-02 Perforation Treatment Performed - Remedial Casing
2016-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-07-07 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-26 Perforation 2143.00 2153.00 13
2016-07-02 Perforation 1294.00 1298.00 17
2016-07-02 Acid Treatment 1294.00 1298.00 0
2016-07-02 Remedial Casing Cementing 1294.00 1298.00 0
2016-07-05 Acid Treatment 2071.00 2074.00 0
2016-07-07 Fracture 2071.00 2074.00 0
1985-09-28 Acid Treatment 2143.00 2153.00 0
1985-09-29 Fracture 2143.00 2153.00 0
2001-06-15 Perforation 1294.00 1298.00 17
2001-06-17 Fracture 1294.00 1298.00 0
2012-03-04 Packing Device Capped w/Cement 2130.00 2138.00 0
2012-03-05 Cement Squeeze 1294.00 1298.00 0
2012-03-10 Perforation 2071.00 2074.00 13
2012-03-11 Acid Treatment 2071.00 2074.00 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-07-07 2016-07-07 0 52 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.7315 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 11.0494 N/A
SB EXCEL 20/40 Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 5.4382 N/A
High Perm KP-SLR Baker Hughes Breaker Crystalline silica quartz 14808-60-7 100 0.6664 N/A
Non-hazardous Not Available 100 0.6664 N/A
Potassium Persulfate 7727-21-1 100 0.6664 N/A
Water 7732-18-5 100 0.6664 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.1123 N/A
CXB-2 Baker Hughes Crosslinker Methanol 67-56-1 100 0.3237 N/A
Non-hazardous Not Available 100 0.3237 N/A
Sodium borate 7775-19-1 100 0.3237 N/A
Sodium hydroxide 1310-73-2 100 0.3237 N/A
GW-4 Baker Hughes Gelling Agent Guar gum 9000-30-0 100 0.2153 N/A
ScaleTrol 14 Baker Hughes Scale Inhibitor Non-hazardous Not Available 100 0.0148 N/A
Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0148 N/A
Flo-Back 30 Baker Hughes Surfactant Cocamido propyl betaine 61789-40-0 100 0.4479 N/A
Glycerine 56-81-5 100 0.448 N/A
Non-hazardous Not Available 100 0.4479 N/A

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-07-05 2016-07-05 Municipal Water 87

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 2629 0.0 0.0 0.0
1989 6003 0.0 0.0 0.0
1990 7048 0.0 0.0 0.0
1991 3912 0.0 0.0 0.0
1992 963 0.0 0.0 0.0
1994 2467 0.0 0.0 0.0
1995 4988 0.0 0.0 0.0
1996 7291 0.0 0.0 0.0
1997 7298 0.0 0.0 0.0
1998 8307 0.0 0.0 0.0
1999 8358 0.0 0.0 0.0
2000 8397 0.0 0.0 0.0
2001 3848 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-26 No Incident Encountered 0.00 0.00
2016-07-11 No Incident Encountered 0.00 0.00

For data sources see[8]

References