X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0736132510000

Well Details

Well ID: 0736132510000
Loading map...
Location: 00/10-25-073-13W6/0
Location Alias: 00/10-25-73-13 W6M
Location Alias 2: 00/10-25-073-13 W6/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 6
Range: 13
Section: 25
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER SINCLAIR 10-25-73-13
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0194347
License Date: 1996-11-29
License Status: Suspension
Spud Date: 1996-12-01
Final Drill Date: 1996-12-18
Well Total Depth: 2300.00 m
Surface Hole Latitude: 55.353944
Surface Hole Longitude: -119.853354

For data sources see[1][2]

Well History

Date Event
1996-11-29 Obtained License
1996-12-03 Surface Casing Operation Performed
1996-12-12 Direction Drilling Operation Performed - Deviate
1996-12-18 Finished Drilling
1996-12-18 Well Log Performed
1996-12-18 Well Mode changed to Drilled and Cased
1996-12-19 Well Log Performed
1996-12-21 Production Casing Operation Performed
1996-12-22 Rig Released
1997-02-08 Well Log Performed
1997-02-11 Well Log Performed
1997-02-12 Perforation Treatment Performed - Jet Perforation
1997-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-13 Plug Back Performed
1997-02-13 Well Log Performed
1997-02-15 Perforation Treatment Performed - Jet Perforation
1997-02-15 Well Log Performed
1997-02-18 Perforation Treatment Performed - Fractured
1997-03-30 Well Log Performed
1997-07-01 Well Began Production
1997-07-01 Well Fluid changed to Gas
1997-07-01 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping
2019-10-01 Well Fluid changed to Gas
2019-10-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-12-12 1712.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-02-12 Perforation 2209.00 2216.00 17
1997-02-13 Packing Device Capped w/Cement 2193.00 2201.00 0
1997-02-15 Perforation 2060.00 2064.00 17
1997-02-15 Perforation 2065.50 2066.50 17
1997-02-18 Fracture 2060.00 2066.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2985 0.0 0.0 0.0
1998 4083 0.0 0.0 0.0
1999 3191 0.0 0.0 0.0
2000 5093 0.0 0.0 0.0
2001 3970 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 7295 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8589 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8616 0.0 0.0 0.0
2014 7856 0.0 0.0 0.0
2015 7908 0.0 0.0 0.0
2016 5136 0.0 0.0 0.0
2017 10 0.0 0.0 0.0
2018 168 0.0 0.0 0.0

For data sources see[6]

References