X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746082607000

Well Details

Well ID: 0746082607000
Loading map...
Location: 00/07-26-074-08W6/0
Location Alias: 00/07-26-74-08 W6M
Location Alias 2: 00/07-26-074-08 W6/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 08
Section: 26
County/Municipality: County of Grande Prairie No. 1
Well Name: ARCO LA GLACE 7-26-74-8
Operator Name: Suncor Energy Inc.
License Number: 0007897
License Date: 1954-04-01
License Status: RecCertified
Spud Date: 1954-05-24
Final Drill Date: 1954-10-28
Well Total Depth: 2746.20 m
Surface Hole Latitude: 55.437523
Surface Hole Longitude: -119.111782

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-04-01 Obtained License
1954-05-31 Drill Stem Test Performed
1954-06-03 Drill Stem Test Performed
1954-06-03 Lost Circulation Occurred
1954-06-04 Drill Stem Test Performed
1954-06-06 Drill Stem Test Performed
1954-06-11 Drill Stem Test Performed
1954-06-12 Drill Stem Test Performed
1954-06-13 Drill Stem Test Performed
1954-06-16 Drill Stem Test Performed
1954-06-29 Drill Stem Test Performed
1954-07-03 Drill Stem Test Performed
1954-07-04 Drill Stem Test Performed
1954-07-09 Drill Stem Test Performed
1954-08-16 Drill Stem Test Performed
1954-08-17 Drill Stem Test Performed
1954-08-28 Drill Stem Test Performed
1954-09-02 Drill Stem Test Performed
1954-09-20 Production Casing Operation Performed
1954-10-28 Finished Drilling
1954-10-28 Well Mode changed to Drilled and Cased
1954-11-01 Drill Stem Test Performed
1954-11-01 Perforation Treatment Performed - Jet Perforation
1954-11-03 Perforation Treatment Performed - Cement Squeeze
1954-11-06 Drill Stem Test Performed
1954-11-06 Perforation Treatment Performed - Jet Perforation
1954-11-09 Perforation Treatment Performed - Cement Squeeze
1954-11-10 Drill Stem Test Performed
1954-11-11 Perforation Treatment Performed - Cement Squeeze
1954-11-13 Perforation Treatment Performed - Jet Perforation
1954-11-14 Drill Stem Test Performed
1954-11-14 Perforation Treatment Performed - Cement Squeeze
1954-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-11-16 Perforation Treatment Performed - Cement Squeeze
1954-12-04 Drill Stem Test Performed
1954-12-04 Perforation Treatment Performed - Jet Perforation
1954-12-05 Drill Stem Test Performed
1954-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-12-06 Perforation Treatment Performed - Jet Perforation
1954-12-07 Drill Stem Test Performed
1954-12-09 Drill Stem Test Performed
1954-12-09 Perforation Treatment Performed - Jet Perforation
1954-12-10 Perforation Treatment Performed - Cement Squeeze
1954-12-13 Drill Stem Test Performed
1954-12-13 Perforation Treatment Performed - Jet Perforation
1954-12-14 Perforation Treatment Performed - Cement Squeeze
1954-12-16 Drill Stem Test Performed
1954-12-16 Perforation Treatment Performed - Jet Perforation
1954-12-17 Drill Stem Test Performed
1954-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-12-17 Perforation Treatment Performed - Jet Perforation
1954-12-18 Drill Stem Test Performed
1954-12-18 Perforation Treatment Performed - Jet Perforation
1954-12-19 Drill Stem Test Performed
1954-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-12-21 Drill Stem Test Performed
1954-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-12-21 Perforation Treatment Performed - Jet Perforation
1954-12-23 Perforation Treatment Performed - Cement Squeeze
1954-12-28 Perforation Treatment Performed - Jet Perforation
1954-12-29 Drill Stem Test Performed
1954-12-31 Drill Stem Test Performed
1954-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-01-01 Perforation Treatment Performed - Cement Plug
1955-01-03 Drill Stem Test Performed
1955-01-03 Perforation Treatment Performed - Cement Squeeze
1955-01-03 Perforation Treatment Performed - Selective Jet Perforations
1955-01-06 Drill Stem Test Performed
1955-01-06 Perforation Treatment Performed - Jet Perforation
1955-01-07 Perforation Treatment Performed - Fractured
1955-01-09 Drill Stem Test Performed
1955-01-10 Drill Stem Test Performed
1955-01-18 Perforation Treatment Performed - Cement Squeeze
1955-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-01-24 Perforation Treatment Performed - Jet Perforation
1955-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-05-26 Well Began Production
1955-05-26 Well Fluid changed to Crude Oil
1955-05-26 Well Mode changed to Flowing
1957-04-07 Well Fluid changed to Crude Oil
1957-04-07 Well Mode changed to Pumping
1957-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-06-28 Perforation Treatment Performed - Jet Perforation
1957-07-02 Perforation Treatment Performed - Selective Jet Perforations
1957-07-04 Perforation Treatment Performed - Fractured
1958-12-16 Well Fluid changed to Crude Oil
1958-12-16 Well Mode changed to Suspended
1963-11-29 Perforation Treatment Performed - Cement Plug
1963-12-01 Well Abandoned
1963-12-01 Well Fluid changed to Crude Oil
1963-12-01 Well Mode changed to Abandoned
1964-06-05 Drill Stem Test Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-11-01 Perforation 2421.90 2426.20 13
1954-12-04 Perforation 2344.80 2345.70 0
1954-12-06 Perforation 2343.30 2344.50 13
1954-12-06 Acid Treatment 2343.30 2345.70 0
1954-12-09 Perforation 2311.60 2315.30 13
1954-12-10 Cement Squeeze 2311.60 2345.70 0
1954-12-13 Perforation 2304.90 2307.90 13
1954-12-14 Cement Squeeze 2304.90 2307.90 0
1954-12-16 Perforation 2300.90 2304.60 13
1954-12-17 Packing Device Capped w/Cement 1898.90 1898.90 0
1954-12-17 Perforation 1887.90 1888.20 13
1954-11-03 Cement Squeeze 2421.90 2426.20 0
1954-12-18 Perforation 1883.70 1887.90 13
1954-12-19 Acid Treatment 1883.70 1888.20 0
1954-12-21 Packing Device Capped w/Cement 1868.40 1868.40 0
1954-12-21 Perforation 1861.10 1861.40 13
1954-12-23 Cement Squeeze 1861.10 1861.40 0
1954-12-28 Perforation 1856.80 1858.10 13
1954-12-28 Perforation 1859.30 1861.40 13
1954-12-31 Acid Treatment 1856.80 1861.40 0
1955-01-01 Cement Plug 1773.60 1781.60 0
1955-01-03 Selective Jet Perforations 1766.30 1766.60 0
1954-11-06 Perforation 2351.20 2353.70 13
1955-01-03 Cement Squeeze 1766.30 1766.60 0
1955-01-06 Perforation 1755.00 1756.30 13
1955-01-06 Perforation 1756.90 1757.50 13
1955-01-06 Perforation 1758.10 1766.60 13
1955-01-07 Fracture 1755.00 1766.60 0
1955-01-18 Cement Squeeze 1755.00 1766.60 0
1955-01-24 Perforation 1856.80 1861.40 13
1955-01-24 Acid Treatment 1856.80 1861.40 0
1955-01-30 Acid Treatment 1856.80 1861.40 0
1957-05-28 Acid Treatment 1856.80 1861.40 0
1954-11-09 Cement Squeeze 2351.20 2353.70 0
1957-06-28 Perforation 1855.00 1860.20 13
1957-07-02 Selective Jet Perforations 1860.20 1862.30 13
1957-07-04 Fracture 1855.00 1862.30 0
1963-11-29 Cement Plug 775.10 811.10 0
1954-11-11 Cement Squeeze 2351.20 2353.70 0
1954-11-13 Perforation 2339.00 2339.30 13
1954-11-14 Cement Squeeze 2339.00 2339.30 0
1954-11-15 Acid Treatment 2339.00 2339.30 0
1954-11-16 Cement Squeeze 2339.00 2339.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1954-06-03 Lost Circulation 725.10 725.10

For data sources see[6]

References