X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746083315000

Well Details

Well ID: 0746083315000
Loading map...
Location: 00/15-33-074-08W6/0
Location Alias: 00/15-33-74-08 W6M
Location Alias 2: 00/15-33-074-08 W6/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 08
Section: 33
County/Municipality: County of Grande Prairie No. 1
Well Name: KELT EXP HZ LA GLACE 15-33-74-8
Operator Name: Kelt Exploration Ltd.
License Number: 0469604
License Date: 2014-09-08
License Status: Amended
Spud Date: 2014-09-13
Final Drill Date: 2014-10-01
Well Total Depth: 3721.00 m
Surface Hole Latitude: 55.445957
Surface Hole Longitude: -119.169938

For data sources see[1][2]

Well History

Date Event
2014-09-08 Obtained License
2014-09-15 Surface Casing Operation Performed
2014-09-20 Direction Drilling Operation Performed - Deviate
2014-09-23 Direction Drilling Operation Performed - Horizontal
2014-10-01 Finished Drilling
2014-10-01 Well Log Performed
2014-10-01 Well Mode changed to Drilled and Cased
2014-10-05 Perforation Treatment Performed - Open-Hole Completion
2014-10-05 Production Casing Operation Performed
2014-10-05 Rig Released
2014-10-22 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-23 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-14 Well Began Production
2014-11-14 Well Fluid changed to Crude Oil
2014-11-14 Well Mode changed to Flowing
2015-10-01 Well Fluid changed to Crude Oil
2015-10-01 Well Mode changed to Gas Lift
2016-08-18 Well Fluid changed to Crude Oil
2016-08-18 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-09-13 Precision Drilling Corporation 322 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-09-20 1741.90 Deviate (5 - 79 degrees)
2014-09-23 2148.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-05 Open Hole/Barefoot Completion 3710.20 3721.00 0
2014-10-22 Multi-Stage Fracture 3275.90 3276.70 0
2014-10-22 Multi-Stage Fracture 3217.90 3218.70 0
2014-10-22 Multi-Stage Fracture 3158.70 3159.60 0
2014-10-23 Multi-Stage Fracture 3101.00 3101.80 0
2014-10-23 Multi-Stage Fracture 3042.60 3043.40 0
2014-10-23 Multi-Stage Fracture 2997.80 2998.60 0
2014-10-23 Multi-Stage Fracture 2940.20 2941.10 0
2014-10-23 Multi-Stage Fracture 2881.90 2882.80 0
2014-10-23 Multi-Stage Fracture 2824.00 2824.90 0
2014-10-23 Multi-Stage Fracture 2764.50 2765.30 0
2014-10-22 Multi-Stage Fracture 3698.90 3700.20 0
2014-10-23 Multi-Stage Fracture 2719.00 2719.80 0
2014-10-23 Multi-Stage Fracture 2660.70 2661.50 0
2014-10-23 Multi-Stage Fracture 2601.40 2602.20 0
2014-10-23 Multi-Stage Fracture 2544.50 2545.30 0
2014-10-23 Multi-Stage Fracture 2485.90 2486.70 0
2014-10-24 Multi-Stage Fracture 2429.10 2429.90 0
2014-10-24 Multi-Stage Fracture 2383.50 2384.40 0
2014-10-24 Multi-Stage Fracture 2325.50 2326.30 0
2014-10-24 Multi-Stage Fracture 2281.50 2282.40 0
2014-10-24 Multi-Stage Fracture 2236.00 2236.80 0
2014-10-22 Multi-Stage Fracture 3664.50 3665.40 0
2014-10-22 Multi-Stage Fracture 3607.60 3608.40 0
2014-10-22 Multi-Stage Fracture 3551.30 3552.20 0
2014-10-22 Multi-Stage Fracture 3493.20 3494.10 0
2014-10-22 Multi-Stage Fracture 3435.90 3436.80 0
2014-10-22 Multi-Stage Fracture 3391.60 3392.40 0
2014-10-22 Multi-Stage Fracture 3334.10 3334.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-22 2014-10-24 2,018 7,090 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 86.0792 N/A
Prime Plus (30/50) Canyon No specific ingredients Not Available 100 1.7198 N/A
Sand (30/50) Ottawa Canyon Aluminum Oxide 1344-28-1 100 8.599 N/A
Crystalline silica. quartz 14808-60-7 100 8.599 N/A
Iron Oxide 1309-37-1 100 8.599 N/A
Titanium Oxide 13463-67-7 100 8.5991 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 3.4396 N/A
Crystalline silica. quartz 14808-60-7 100 3.4396 N/A
Iron Oxide 1309-37-1 100 3.4396 N/A
Titanium Oxide 13463-67-7 100 3.4396 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.013 N/A
Water 7732-18-5 100 0.013 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.058 N/A
CAN-2411 Non-emulsifier Canyon Demulsifier Ethylene glycol 107-21-1 100 0.0434 N/A
Isopropanol 67-63-0 100 0.0434 N/A
Water 7732-18-5 100 0.0434 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.0477 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-10-13 2014-10-15 Recycled Fracturing Water (treated at well site) 1558
2014-10-15 2014-10-19 Surface Water - Runoff 5882

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 120 0.0 0.0 0.0
2015 7542 0.0 0.0 0.0
2016 8139 0.0 0.0 0.0
2017 8380 0.0 0.0 0.0
2018 7007 0.0 0.0 0.0
2019 5729 0.0 0.0 0.0
2020 340 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References