X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746093413000

Well Details

Well ID: 0746093413000
Loading map...
Location: 00/13-34-074-09W6/0
Location Alias: 00/13-34-74-09 W6M
Location Alias 2: 00/13-34-074-09 W6/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 09
Section: 34
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER VALHALLA 13-34-74-9
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0131128
License Date: 1988-01-08
License Status: Suspension
Spud Date: 1988-01-15
Final Drill Date: 1988-01-18
Well Total Depth: 939.00 m
Surface Hole Latitude: 55.460370
Surface Hole Longitude: -119.296047

For data sources see[1][2]

Well History

Date Event
1988-01-08 Obtained License
1988-01-15 Direction Drilling Operation Performed - Deviate
1988-01-15 Lost Circulation Occurred
1988-01-16 Surface Casing Operation Performed
1988-01-18 Finished Drilling
1988-01-19 Production Casing Operation Performed
1988-01-19 Rig Released
1988-01-19 Well Log Performed
1988-01-19 Well Mode changed to Drilled and Cased
1988-02-05 Well Log Performed
1988-02-19 Perforation Treatment Performed - Jet Perforation
1988-02-19 Well Log Performed
1988-03-01 Perforation Treatment Performed - Fractured
1988-03-09 Perforation Treatment Performed - Fractured
1988-04-01 Well Began Production
1988-04-01 Well Fluid changed to Crude Oil
1988-04-01 Well Mode changed to Pumping
1993-08-30 Perforation Treatment Performed - Fractured
2014-08-30 Well Fluid changed to Crude Oil
2014-08-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-01-15 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-19 Perforation 905.30 913.50 13
1988-03-01 Fracture 905.30 913.50 0
1988-03-09 Fracture 905.30 913.50 0
1993-08-30 Fracture 905.30 913.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 6019 0.0 0.0 0.0
1989 8552 0.0 0.0 0.0
1990 8457 0.0 0.0 0.0
1991 8647 0.0 0.0 0.0
1992 8535 0.0 0.0 0.0
1993 5020 0.0 0.0 0.0
1994 8686 0.0 0.0 0.0
1995 8753 0.0 0.0 0.0
1996 8761 0.0 0.0 0.0
1997 8546 0.0 0.0 0.0
1998 8682 0.0 0.0 0.0
1999 8726 0.0 0.0 0.0
2000 8759 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8712 0.0 0.0 0.0
2003 8726 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8755 0.0 0.0 0.0
2006 8754 0.0 0.0 0.0
2007 8159 0.0 0.0 0.0
2008 8287 0.0 0.0 0.0
2009 5938 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8753 0.0 0.0 0.0
2012 1440 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-01-15 Lost Circulation 22.90 22.90

For data sources see[7]

References