X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746103114000

Well Details

Well ID: 0746103114000
Loading map...
Location: 00/14-31-074-10W6/0
Location Alias: 00/14-31-74-10 W6M
Location Alias 2: 00/14-31-074-10 W6/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 10
Section: 31
County/Municipality: County of Grande Prairie No. 1
Well Name: ESSO ET AL KNOPCIK 14-31-74-10
Operator Name: Imperial Oil Resources Limited
License Number: 0132797
License Date: 1988-03-03
License Status: RecCertified
Spud Date: 1988-03-09
Final Drill Date: 1988-03-16
Well Total Depth: 775.00 m
Surface Hole Latitude: 55.457898
Surface Hole Longitude: -119.526332

For data sources see[1][2]

Well History

Date Event
1988-03-03 Obtained License
1988-03-10 Surface Casing Operation Performed
1988-03-13 Well Log Performed
1988-03-14 Drill Stem Test Performed
1988-03-15 Production Casing Operation Performed
1988-03-16 Finished Drilling
1988-03-16 Perforation Treatment Performed - Open-Hole Completion
1988-03-16 Well Mode changed to Drilled and Cased
1988-03-17 Rig Released
1988-03-17 Well Log Performed
1988-04-01 Liner Casing Operation Performed
1988-04-01 Perforation Treatment Performed - Cement Squeeze
1988-04-21 Perforation Treatment Performed - Jet Perforation
1988-04-21 Well Log Performed
1988-05-16 Perforation Treatment Performed - Fractured
1988-06-15 Well Began Production
1988-06-15 Well Fluid changed to Crude Oil
1988-06-15 Well Mode changed to Pumping
1988-07-12 Well Fluid changed to Crude Oil
1988-07-12 Well Mode changed to Suspended
1988-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-09-03 Plug Back Performed
1988-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-04 Perforation Treatment Performed - Jet Perforation
1989-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-29 Plug Back Performed
1989-03-29 Well Fluid changed to Crude Oil
1989-03-29 Well Log Performed
1989-03-29 Well Mode changed to Abandoned
1989-03-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-16 Open Hole/Barefoot Completion 745.00 775.00 0
1988-04-01 Cement Squeeze 745.00 775.00 0
1988-04-21 Perforation 750.00 755.00 13
1988-05-16 Fracture 750.00 755.00 0
1988-09-03 Packing Device Capped w/Cement 708.00 718.00 0
1988-09-04 Perforation 337.00 340.00 13
1988-09-04 Acid Treatment 337.00 340.00 0
1989-03-29 Packing Device Capped w/Cement 317.00 325.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 900 0.0 0.0 0.0

For data sources see[5]

References