X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746110207022

Well Details

Well ID: 0746110207022
Loading map...
Location: 02/07-02-074-11W6/2
Location Alias: 02/07-02-74-11 W6M
Location Alias 2: 02/07-02-074-11 W6/02
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 11
Section: 02
County/Municipality: County of Grande Prairie No. 1
Well Name: TURBO ET AL KNOPCIK 7-2-74-11
Operator Name: Canadian Natural Resources Limited
License Number: 0050804
License Date: 1974-08-12
License Status: RecCertified
Spud Date: 1974-08-15
Final Drill Date: 1974-08-25
Well Total Depth: 1410.60 m
Surface Hole Latitude: 55.379685
Surface Hole Longitude: -119.573540

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-08-12 Obtained License
1974-08-25 Finished Drilling
1974-08-25 Liner Casing Operation Performed
1974-09-13 Perforation Treatment Performed - Open-Hole Completion
1980-05-30 Perforation Treatment Performed - Cement Squeeze
1980-06-03 Perforation Treatment Performed - Jet Perforation
1980-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-07 Perforation Treatment Performed - Jet Perforation
1981-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-05 Well Mode changed to Drilled and Cased
1988-01-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-03 Perforation Treatment Performed - Cement Plug
1988-01-13 Plug Back Performed
1988-03-01 Well Log Performed
1988-03-02 Well Log Performed
1988-03-16 Perforation Treatment Performed - Jet Perforation
1988-03-16 Perforation Treatment Performed - Remedial Casing
1988-03-18 Well Abandoned
1988-03-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-09-13 Open Hole/Barefoot Completion 1389.90 1410.60 0
1988-01-03 Cement Plug 980.00 1010.00 0
1988-01-03 Packing Device Capped w/Cement 857.00 865.00 0
1988-03-16 Perforation 444.00 445.00 13
1988-03-16 Remedial Casing Cementing 444.00 445.00 0
1980-05-30 Cement Squeeze 1389.90 1410.60 0
1980-06-03 Perforation 1401.20 1402.40 7
1980-06-03 Perforation 1391.70 1395.00 7
1980-06-04 Acid Treatment 1391.70 1402.40 0
1981-08-07 Perforation 896.10 899.20 13
1981-08-07 Perforation 887.00 889.40 13
1981-08-07 Perforation 891.20 893.10 13
1981-08-09 Acid Treatment 887.00 899.20 0

For data sources see[4]



References