X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746111506002

Well Details

Well ID: 0746111506002
Loading map...
Location: 00/06-15-074-11W6/2
Location Alias: 00/06-15-74-11 W6M
Location Alias 2: 00/06-15-074-11 W6/02
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 11
Section: 15
County/Municipality: County of Grande Prairie No. 1
Well Name: BANKENO ET AL KNOPCIK 6-15-74-11
Operator Name: Canadian Natural Resources Limited
License Number: 0141062
License Date: 1989-09-26
License Status: Suspension
Spud Date: 1989-09-27
Final Drill Date: 1989-10-13
Well Total Depth: 2100.00 m
Surface Hole Latitude: 55.410096
Surface Hole Longitude: -119.603415

For data sources see[1][2]

Well History

Date Event
1989-09-26 Obtained License
1989-09-28 Lost Circulation Occurred
1989-09-29 Surface Casing Operation Performed
1989-10-13 Finished Drilling
1989-10-13 Well Log Performed
1989-10-13 Well Mode changed to Drilled and Cased
1989-10-15 Drill Stem Test Performed
1989-10-16 Production Casing Operation Performed
1989-10-16 Rig Released
1989-10-17 Well Log Performed
1989-10-23 Perforation Treatment Performed - Jet Perforation
1989-10-24 Perforation Treatment Performed - Remedial Casing
1989-10-27 Perforation Treatment Performed - Jet Perforation
1989-10-27 Well Log Performed
1989-10-28 Perforation Treatment Performed - Remedial Casing
1989-10-31 Perforation Treatment Performed - Jet Perforation
1989-10-31 Well Log Performed
1989-11-02 Perforation Treatment Performed - Fractured
1989-11-04 Well Log Performed
1990-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-07-30 Perforation Treatment Performed - Jet Perforation
1990-07-30 Plug Back Performed
1990-07-30 Well Log Performed
1991-01-01 Well Began Production
1991-01-01 Well Fluid changed to Gas
1991-01-01 Well Mode changed to Flowing
2002-02-01 Well Fluid changed to Gas
2002-02-01 Well Mode changed to Pumping
2008-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-02 Perforation Treatment Performed - Jet Perforation
2008-02-02 Well Log Performed
2009-06-10 Well Log Performed
2009-07-01 Well Fluid changed to Gas
2009-07-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-23 Perforation 1070.00 1071.00 13
2008-02-02 Perforation 866.80 868.80 17
1989-10-24 Remedial Casing Cementing 1070.00 1071.00 0
1989-10-27 Perforation 1071.00 1072.00 13
1989-10-28 Remedial Casing Cementing 1071.00 1072.00 0
1989-10-31 Perforation 1987.50 1992.50 13
1989-11-02 Fracture 1987.50 1992.50 0
1990-07-30 Packing Device Capped w/Cement 1901.00 1909.00 0
1990-07-30 Perforation 866.80 868.80 13
2008-02-02 Packing Device Capped w/Cement 997.00 1005.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 7198 0.0 0.0 0.0
1992 8230 0.0 0.0 0.0
1993 8587 0.0 0.0 0.0
1994 8453 0.0 0.0 0.0
1995 8118 0.0 0.0 0.0
1996 8364 0.0 0.0 0.0
1997 8699 0.0 0.0 0.0
1998 8727 0.0 0.0 0.0
1999 8729 0.0 0.0 0.0
2000 8605 0.0 0.0 0.0
2001 8474 0.0 0.0 0.0
2002 8720 0.0 0.0 0.0
2003 8690 0.0 0.0 0.0
2004 8704 0.0 0.0 0.0
2005 8758 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 168 0.0 0.0 0.0
2008 5748 0.0 0.0 0.0
2009 1479 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-09-28 Lost Circulation 113.00 309.00
2009-06-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References