X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746111812000

Well Details

Well ID: 0746111812000
Loading map...
Location: 00/12-18-074-11W6/0
Location Alias: 00/12-18-74-11 W6M
Location Alias 2: 00/12-18-074-11 W6/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 11
Section: 18
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER WEMBLEY 12-18-74-11
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0195074
License Date: 1996-12-12
License Status: Suspension
Spud Date: 1996-12-31
Final Drill Date: 1997-01-16
Well Total Depth: 2730.00 m
Surface Hole Latitude: 55.413293
Surface Hole Longitude: -119.686663

For data sources see[1][2]

Well History

Date Event
1996-12-12 Obtained License
1997-01-01 Surface Casing Operation Performed
1997-01-04 Lost Circulation Occurred
1997-01-08 Lost Circulation Occurred
1997-01-16 Finished Drilling
1997-01-16 Well Log Performed
1997-01-16 Well Mode changed to Drilled and Cased
1997-01-17 Well Log Performed
1997-01-18 Drill Stem Test Performed
1997-01-20 Production Casing Operation Performed
1997-01-20 Rig Released
1997-01-29 Perforation Treatment Performed - Jet Perforation
1997-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-04 Perforation Treatment Performed - Jet Perforation
1997-02-07 Perforation Treatment Performed - Fractured
1997-04-09 Well Began Production
1997-04-09 Well Fluid changed to Gas
1997-04-09 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping
2018-01-31 Well Fluid changed to Gas
2018-01-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-29 Perforation 2698.00 2703.50 20
1997-01-30 Acid Treatment 2698.00 2703.50 0
1997-02-03 Packing Device Capped w/Cement 2680.00 2688.00 0
1997-02-04 Perforation 2632.50 2639.50 18
1997-02-07 Fracture 2632.50 2639.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 5725 0.0 0.0 0.0
1998 8265 0.0 0.0 0.0
1999 8642 0.0 0.0 0.0
2000 8157 0.0 0.0 0.0
2001 8289 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8755 0.0 0.0 0.0
2008 8036 0.0 0.0 0.0
2009 8631 0.0 0.0 0.0
2010 8491 0.0 0.0 0.0
2011 7407 0.0 0.0 0.0
2016 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-01-04 Lost Circulation 1451.00 1851.00
1997-01-08 Lost Circulation 2093.00 2151.00

For data sources see[6]

References