X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756091209000

Well Details

Well ID: 0756091209000
Loading map...
Location: 00/09-12-075-09W6/0
Location Alias: 00/09-12-75-09 W6M
Location Alias 2: 00/09-12-075-09 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 09
Section: 12
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER VALHALLA 9-12-75-9
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0130150
License Date: 1987-11-17
License Status: Suspension
Spud Date: 1987-12-08
Final Drill Date: 1987-12-11
Well Total Depth: 752.00 m
Surface Hole Latitude: 55.482938
Surface Hole Longitude: -119.242294

For data sources see[1][2]

Well History

Date Event
1987-11-17 Obtained License
1987-12-08 Direction Drilling Operation Performed - Deviate
1987-12-09 Surface Casing Operation Performed
1987-12-11 Finished Drilling
1987-12-11 Production Casing Operation Performed
1987-12-11 Rig Released
1987-12-11 Well Mode changed to Drilled and Cased
1987-12-15 Well Log Performed
1988-01-14 Well Log Performed
1988-01-19 Perforation Treatment Performed - Jet Perforation
1988-01-19 Well Log Performed
1988-01-24 Perforation Treatment Performed - Fractured
1988-04-01 Well Began Production
1988-04-01 Well Fluid changed to Crude Oil
1988-04-01 Well Mode changed to Pumping
1998-02-15 Perforation Treatment Performed - Chemical Squeeze
1998-02-23 Well Log Performed
1998-02-24 Well Log Performed
1998-06-17 Well Began Injection
1998-06-17 Well Fluid changed to Water
1998-06-17 Well Type changed to Injection
2008-06-01 Well Fluid changed to Water
2008-06-01 Well Mode changed to Suspended
2008-06-01 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1987-12-08 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-01-19 Perforation 727.00 731.00 13
1988-01-24 Fracture 727.00 731.00 0
1998-02-15 Chemical Squeeze 727.00 731.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 6262 0.0 0.0 0.0
1989 8497 0.0 0.0 0.0
1990 8496 0.0 0.0 0.0
1991 8559 0.0 0.0 0.0
1992 8547 0.0 0.0 0.0
1993 8475 0.0 0.0 0.0
1994 8604 0.0 0.0 0.0
1995 8751 0.0 0.0 0.0
1996 8755 0.0 0.0 0.0
1997 8552 0.0 0.0 0.0
1998 1056 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0

For data sources see[6]

References