X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756092005000

Well Details

Well ID: 0756092005000
Loading map...
Location: 00/05-20-075-09W6/0
Location Alias: 00/05-20-75-09 W6M
Location Alias 2: 00/05-20-075-09 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 09
Section: 20
County/Municipality: County of Grande Prairie No. 1
Well Name: TYRANNEX ENERGY VALHALLA 5-20-75-9
Operator Name: Tyrannex Energy Ltd.
License Number: 0446454
License Date: 2012-06-12
License Status: Issued
Spud Date: 2012-07-05
Final Drill Date: 2012-07-13
Well Total Depth: 2366.40 m
Surface Hole Latitude: 55.510128
Surface Hole Longitude: -119.341947

For data sources see[1][2]

Well History

Date Event
2012-06-12 Obtained License
2012-06-29 Well Log Performed
2012-07-06 Surface Casing Operation Performed
2012-07-07 Direction Drilling Operation Performed - Deviate
2012-07-07 Well Log Performed
2012-07-08 Intermediate Casing Operation Performed
2012-07-09 Direction Drilling Operation Performed - Horizontal
2012-07-09 Well Log Performed
2012-07-13 Finished Drilling
2012-07-13 Well Log Performed
2012-07-13 Well Mode changed to Drilled and Cased
2012-07-14 Liner Casing Operation Performed
2012-07-14 Rig Released
2012-07-29 Perforation Treatment Performed - Open-Hole Completion
2012-07-29 Perforation Treatment Performed - Slotted Liner or Casing
2012-08-01 Well Began Production
2012-08-01 Well Fluid changed to Crude Oil
2012-08-01 Well Mode changed to Pumping
2016-02-01 Well Began Injection
2016-02-01 Well Fluid changed to Water
2016-02-01 Well Type changed to Injection

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-05 Precision Drilling Corporation 150 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-07 475.00 Deviate (5 - 79 degrees)
2012-07-09 974.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-29 Open Hole/Barefoot Completion 2366.00 2366.40 0
2012-07-29 Slotted Liner 939.60 2236.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2952 0.0 0.0 0.0
2013 8283 0.0 0.0 0.0
2014 7671 0.0 0.0 0.0
2015 5880 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-14 No Incident Encountered 0.00 0.00
2015-11-15 No Incident Encountered 0.00 0.00

For data sources see[8]

References