X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756092815030

Well Details

Well ID: 0756092815030
Loading map...
Location: 03/15-28-075-09W6/0
Location Alias: 03/15-28-75-09 W6M
Location Alias 2: 03/15-28-075-09 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 09
Section: 28
County/Municipality: County of Grande Prairie No. 1
Well Name: WHITECAP VALHALLA 15-28-75-9
Operator Name: Whitecap Resources Inc.
License Number: 0443902
License Date: 2012-02-07
License Status: Issued
Spud Date: 2012-02-23
Final Drill Date: 2012-03-16
Well Total Depth: 3504.00 m
Surface Hole Latitude: 55.540593
Surface Hole Longitude: -119.340602

For data sources see[1][2]

Well History

Date Event
2012-02-07 Obtained License
2012-02-25 Surface Casing Operation Performed
2012-02-29 Direction Drilling Operation Performed - Deviate
2012-02-29 Well Log Performed
2012-03-09 Direction Drilling Operation Performed - Horizontal
2012-03-09 Intermediate Casing Operation Performed
2012-03-10 Well Log Performed
2012-03-16 Finished Drilling
2012-03-16 Well Mode changed to Drilled and Cased
2012-03-20 Liner Casing Operation Performed
2012-03-21 Rig Released
2012-03-26 Well Log Performed
2012-04-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-02 Perforation Treatment Performed - Open-Hole Completion
2012-06-19 Well Began Production
2012-06-19 Well Fluid changed to Crude Oil
2012-06-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-23 Precision Drilling Corporation 628 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-29 1947.00 Deviate (5 - 79 degrees)
2012-03-09 2406.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-02 Open Hole/Barefoot Completion 3499.00 3504.00 0
2012-04-02 Multi-Stage Fracture 2839.00 2839.10 0
2012-04-02 Multi-Stage Fracture 2750.00 2750.10 0
2012-04-02 Multi-Stage Fracture 2661.00 2661.10 0
2012-04-02 Multi-Stage Fracture 2572.00 2572.10 0
2012-04-02 Multi-Stage Fracture 2496.00 2496.10 0
2012-04-02 Multi-Stage Fracture 2420.00 2420.10 0
2012-04-02 Multi-Stage Fracture 3477.00 3477.10 0
2012-04-02 Multi-Stage Fracture 3396.00 3396.10 0
2012-04-02 Multi-Stage Fracture 3321.00 3321.10 0
2012-04-02 Multi-Stage Fracture 3218.00 3218.10 0
2012-04-02 Multi-Stage Fracture 3156.00 3156.10 0
2012-04-02 Multi-Stage Fracture 3067.00 3067.10 0
2012-04-02 Multi-Stage Fracture 2991.00 2991.10 0
2012-04-02 Multi-Stage Fracture 2915.00 2915.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4539 0.0 0.0 0.0
2013 8487 0.0 0.0 0.0
2014 8275 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8178 0.0 0.0 0.0
2017 8727 0.0 0.0 0.0
2018 8129 0.0 0.0 0.0
2019 8727 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-21 No Incident Encountered 0.00 0.00
2012-04-02 No Incident Encountered 0.00 0.00

For data sources see[8]

References