X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756092908020

Well Details

Well ID: 0756092908020
Loading map...
Location: 02/08-29-075-09W6/0
Location Alias: 02/08-29-75-09 W6M
Location Alias 2: 02/08-29-075-09 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 09
Section: 29
County/Municipality: County of Grande Prairie No. 1
Well Name: WHITECAP VALHALLA 8-29-75-9
Operator Name: Whitecap Resources Inc.
License Number: 0422670
License Date: 2010-08-16
License Status: Issued
Spud Date: 2010-09-30
Final Drill Date: 2010-11-02
Well Total Depth: 3600.00 m
Surface Hole Latitude: 55.535952
Surface Hole Longitude: -119.366511

For data sources see[1][2]

Well History

Date Event
2010-08-16 Obtained License
2010-10-02 Surface Casing Operation Performed
2010-10-05 Direction Drilling Operation Performed - Deviate
2010-10-23 Well Log Performed
2010-10-25 Direction Drilling Operation Performed - Horizontal
2010-10-25 Intermediate Casing Operation Performed
2010-11-02 Finished Drilling
2010-11-02 Well Mode changed to Drilled and Cased
2010-11-04 Liner Casing Operation Performed
2010-11-06 Rig Released
2010-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-17 Perforation Treatment Performed - Open-Hole Completion
2010-12-01 Well Began Production
2010-12-01 Well Fluid changed to Crude Oil
2010-12-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-05 1199.00 Deviate (5 - 79 degrees)
2010-10-25 2448.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-13 Multi-Stage Fracture 3586.70 3588.00 0
2010-11-17 Multi-Stage Fracture 2536.10 2536.90 0
2010-11-17 Multi-Stage Fracture 2463.30 2464.10 0
2010-11-17 Open Hole/Barefoot Completion 3596.00 3600.00 0
2010-11-13 Multi-Stage Fracture 3507.20 3508.00 0
2010-11-13 Multi-Stage Fracture 3395.00 3395.80 0
2010-11-13 Multi-Stage Fracture 3281.90 3282.70 0
2010-11-13 Multi-Stage Fracture 3155.30 3156.10 0
2010-11-13 Multi-Stage Fracture 3044.10 3044.90 0
2010-11-13 Multi-Stage Fracture 2917.50 2918.30 0
2010-11-14 Multi-Stage Fracture 2776.90 2777.70 0
2010-11-15 Multi-Stage Fracture 2663.40 2664.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 470 0.0 0.0 0.0
2011 7878 0.0 0.0 0.0
2012 8482 0.0 0.0 0.0
2013 8588 0.0 0.0 0.0
2014 8263 0.0 0.0 0.0
2015 8694 0.0 0.0 0.0
2016 8717 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8415 0.0 0.0 0.0
2019 7744 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[6]

References