X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0775250909000

Well Details

Well ID: 0775250909000
Loading map...
Location: 00/09-09-077-25W5/0
Location Alias: 00/09-09-77-25 W5M
Location Alias 2: 00/09-09-077-25 W5/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 25
Section: 09
County/Municipality: Birch Hills County
Well Name: CNRL ET AL EAGLE 9-9-77-25
Operator Name: Canadian Natural Resources Limited
License Number: 0079714
License Date: 1979-12-05
License Status: Abandoned
Spud Date: 1979-12-31
Final Drill Date: 1980-02-01
Well Total Depth: 2693.50 m
Surface Hole Latitude: 55.659972
Surface Hole Longitude: -117.805688

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-12-05 Obtained License
1980-01-18 Blow Occurred
1980-02-01 Finished Drilling
1980-02-01 Well Mode changed to Drilled and Cased
1980-02-04 Drill Stem Test Performed
1980-02-06 Well Log Performed
1980-02-07 Production Casing Operation Performed
1980-02-17 Perforation Treatment Performed - Jet Perforation
1980-02-21 Perforation Treatment Performed - Jet Perforation
1980-03-02 Perforation Treatment Performed - Cement Squeeze
1980-03-04 Perforation Treatment Performed - Jet Perforation
1980-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-10 Perforation Treatment Performed - Cement Squeeze
1980-03-11 Perforation Treatment Performed - Jet Perforation
1980-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-14 Perforation Treatment Performed - Jet Perforation
1980-03-17 Perforation Treatment Performed - Cement Squeeze
1980-03-18 Perforation Treatment Performed - Jet Perforation
1980-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-21 Perforation Treatment Performed - Cement Squeeze
1980-03-21 Perforation Treatment Performed - Jet Perforation
1980-03-26 Perforation Treatment Performed - Cement Squeeze
1980-03-26 Perforation Treatment Performed - Jet Perforation
1980-03-28 Perforation Treatment Performed - Cement Squeeze
1980-03-28 Perforation Treatment Performed - Jet Perforation
1980-03-29 Perforation Treatment Performed - Cement Squeeze
1980-03-30 Perforation Treatment Performed - Jet Perforation
1980-03-31 Perforation Treatment Performed - Cement Squeeze
1980-08-20 Perforation Treatment Performed - Jet Perforation
1980-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-08 Perforation Treatment Performed - Jet Perforation
1980-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-03 Well Began Production
1980-11-03 Well Fluid changed to Crude Oil
1980-11-03 Well Mode changed to Flowing
1992-05-09 Well Fluid changed to Crude Oil
1992-05-09 Well Log Performed
1992-05-09 Well Mode changed to Pumping
2007-02-25 Well Log Performed
2007-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-27 Plug Back Performed
2007-02-27 Well Fluid changed to Crude Oil
2007-02-27 Well Log Performed
2007-02-27 Well Mode changed to Abandoned Zone
2007-02-28 Well Log Performed
2007-03-01 Perforation Treatment Performed - Jet Perforation
2007-03-01 Well Log Performed
2007-03-02 Perforation Treatment Performed - Remedial Casing
2007-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-03 Perforation Treatment Performed - Jet Perforation
2007-03-03 Perforation Treatment Performed - Remedial Casing
2007-03-03 Well Log Performed
2008-09-07 Well Log Performed
2008-09-14 Well Abandoned
2008-09-14 Well Fluid changed to Crude Oil
2008-09-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-17 Perforation 2033.00 2039.00 7
1980-03-14 Acid Treatment 1481.50 1484.00 0
1980-03-17 Cement Squeeze 1481.50 1484.00 0
1980-03-17 Cement Squeeze 1403.00 1407.00 0
1980-03-18 Perforation 1314.00 1318.00 7
1980-03-20 Acid Treatment 1314.00 1318.00 0
1980-03-21 Cement Squeeze 1314.00 1318.00 0
1980-03-21 Perforation 1197.00 1198.50 7
1980-03-26 Cement Squeeze 1197.00 1198.50 0
1980-03-26 Perforation 919.00 921.00 7
1980-03-28 Cement Squeeze 919.00 921.00 0
1980-02-21 Perforation 2089.00 2097.00 7
1980-03-28 Perforation 588.00 592.00 7
1980-03-29 Cement Squeeze 588.00 592.00 0
1980-03-30 Perforation 543.00 548.00 7
1980-03-31 Cement Squeeze 543.00 548.00 0
1980-08-20 Perforation 2430.00 2434.00 13
1980-08-22 Acid Treatment 2430.00 2434.00 0
1980-09-07 Packing Device Capped w/Cement 2417.00 2425.00 0
1980-09-08 Perforation 2138.00 2143.00 13
1980-09-09 Packing Device Capped w/Cement 2073.00 2081.00 0
2007-02-27 Packing Device Capped w/Cement 2006.00 2014.00 0
1980-03-02 Cement Squeeze 2089.00 2097.00 0
2007-02-27 Packing Device Capped w/Cement 1466.00 1474.00 0
2007-03-01 Perforation 393.00 394.00 20
2007-03-01 Perforation 393.00 393.30 36
2007-03-02 Remedial Casing Cementing 393.00 394.00 0
2007-03-03 Perforation 340.00 340.30 36
2007-03-03 Perforation 340.00 341.00 20
2007-03-03 Remedial Casing Cementing 340.00 341.00 0
2007-03-03 Packing Device Capped w/Cement 328.80 336.80 0
1980-03-04 Perforation 1525.00 1528.50 7
1980-03-07 Acid Treatment 1525.00 1528.50 0
1980-03-10 Cement Squeeze 1525.00 1528.50 0
1980-03-11 Perforation 1403.00 1407.00 7
1980-03-13 Acid Treatment 1403.00 1407.00 0
1980-03-14 Perforation 1481.50 1484.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 435 0.0 0.0 0.0
1981 972 0.0 0.0 0.0
1982 1682 0.0 0.0 0.0
1983 2473 0.0 0.0 0.0
1984 6052 0.0 0.0 0.0
1985 2630 0.0 0.0 0.0
1986 6421 0.0 0.0 0.0
1987 6326 0.0 0.0 0.0
1988 8218 0.0 0.0 0.0
1989 8479 0.0 0.0 0.0
1990 8278 0.0 0.0 0.0
1991 8151 0.0 0.0 0.0
1992 8064 0.0 0.0 0.0
1993 8477 0.0 0.0 0.0
1994 8629 0.0 0.0 0.0
1995 8745 0.0 0.0 0.0
1996 8653 0.0 0.0 0.0
1997 8710 0.0 0.0 0.0
1998 3623 0.0 0.0 0.0
1999 3975 0.0 0.0 0.0
2000 7705 0.0 0.0 0.0
2001 4265 0.0 0.0 0.0
2002 319 0.0 0.0 0.0
2006 103 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-01-18 Blow 1805.00 1805.00

For data sources see[6]

References