If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776122704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.709987,"lon":-119.80848,"icon":""}]} |
Location: 00/04-27-077-12W6/0 | |
Location Alias: 00/04-27-77-12 W6M | |
Location Alias 2: 00/04-27-077-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 12 | |
Section: 27 | |
County/Municipality: Saddle Hills County | |
Well Name: BIRCHCLIFF HZ PCOUPES 4-27-77-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0440328 | |
License Date: 2011-12-05 | |
License Status: Issued | |
Spud Date: 2011-12-14 | |
Final Drill Date: 2012-01-28 | |
Well Total Depth: 4776.00 m | |
Surface Hole Latitude: 55.709987 | |
Surface Hole Longitude: -119.808480 |
Date | Event |
---|---|
2011-12-05 | Obtained License |
2011-12-16 | Surface Casing Operation Performed |
2012-01-12 | Direction Drilling Operation Performed - Horizontal |
2012-01-12 | Well Log Performed |
2012-01-28 | Finished Drilling |
2012-01-28 | Well Log Performed |
2012-01-28 | Well Mode changed to Drilled and Cased |
2012-01-30 | Well Log Performed |
2012-02-02 | Liner Casing Operation Performed |
2012-02-02 | Production Casing Operation Performed |
2012-02-03 | Rig Released |
2012-02-27 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-13 | Well Fluid changed to Gas |
2012-03-13 | Well Mode changed to Testing |
2012-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-06-15 | Well Began Production |
2012-06-15 | Well Fluid changed to Gas |
2012-06-15 | Well Mode changed to Flowing |
2019-11-01 | Well Fluid changed to Gas |
2019-11-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-12 | 2022.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-27 | Open Hole/Barefoot Completion | 4771.00 | 4776.00 | 0 |
2012-03-12 | Multi-Stage Fracture | 3671.90 | 3672.70 | 0 |
2012-03-12 | Multi-Stage Fracture | 3546.60 | 3547.40 | 0 |
2012-03-12 | Multi-Stage Fracture | 3407.70 | 3408.50 | 0 |
2012-03-13 | Multi-Stage Fracture | 3268.60 | 3269.40 | 0 |
2012-03-13 | Multi-Stage Fracture | 3129.20 | 3130.00 | 0 |
2012-03-14 | Multi-Stage Fracture | 3003.60 | 3004.40 | 0 |
2012-03-14 | Multi-Stage Fracture | 2863.90 | 2864.70 | 0 |
2012-03-14 | Multi-Stage Fracture | 2724.80 | 2725.60 | 0 |
2012-03-14 | Multi-Stage Fracture | 2595.70 | 2596.50 | 0 |
2012-03-10 | Multi-Stage Fracture | 4761.70 | 4762.50 | 0 |
2012-03-10 | Multi-Stage Fracture | 4617.10 | 4617.90 | 0 |
2012-03-11 | Multi-Stage Fracture | 4491.30 | 4492.10 | 0 |
2012-03-11 | Multi-Stage Fracture | 4352.60 | 4353.40 | 0 |
2012-03-11 | Multi-Stage Fracture | 4213.30 | 4214.10 | 0 |
2012-03-11 | Multi-Stage Fracture | 4074.80 | 4075.60 | 0 |
2012-03-11 | Multi-Stage Fracture | 3949.60 | 3950.40 | 0 |
2012-03-12 | Multi-Stage Fracture | 3810.90 | 3811.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4766 | 0.0 | 0.0 | 0.0 |
2013 | 8664 | 0.0 | 0.0 | 0.0 |
2014 | 8626 | 0.0 | 0.0 | 0.0 |
2015 | 7501 | 0.0 | 0.0 | 0.0 |
2016 | 8384 | 0.0 | 0.0 | 0.0 |
2017 | 7958 | 0.0 | 0.0 | 0.0 |
2018 | 8312 | 0.0 | 0.0 | 0.0 |
2019 | 7229 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]