X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776122704000

Well Details

Well ID: 0776122704000
Loading map...
Location: 00/04-27-077-12W6/0
Location Alias: 00/04-27-77-12 W6M
Location Alias 2: 00/04-27-077-12 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 12
Section: 27
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ PCOUPES 4-27-77-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0440328
License Date: 2011-12-05
License Status: Issued
Spud Date: 2011-12-14
Final Drill Date: 2012-01-28
Well Total Depth: 4776.00 m
Surface Hole Latitude: 55.709987
Surface Hole Longitude: -119.808480

For data sources see[1][2]

Well History

Date Event
2011-12-05 Obtained License
2011-12-16 Surface Casing Operation Performed
2012-01-12 Direction Drilling Operation Performed - Horizontal
2012-01-12 Well Log Performed
2012-01-28 Finished Drilling
2012-01-28 Well Log Performed
2012-01-28 Well Mode changed to Drilled and Cased
2012-01-30 Well Log Performed
2012-02-02 Liner Casing Operation Performed
2012-02-02 Production Casing Operation Performed
2012-02-03 Rig Released
2012-02-27 Perforation Treatment Performed - Open-Hole Completion
2012-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-13 Well Fluid changed to Gas
2012-03-13 Well Mode changed to Testing
2012-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-15 Well Began Production
2012-06-15 Well Fluid changed to Gas
2012-06-15 Well Mode changed to Flowing
2019-11-01 Well Fluid changed to Gas
2019-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-12 2022.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-27 Open Hole/Barefoot Completion 4771.00 4776.00 0
2012-03-12 Multi-Stage Fracture 3671.90 3672.70 0
2012-03-12 Multi-Stage Fracture 3546.60 3547.40 0
2012-03-12 Multi-Stage Fracture 3407.70 3408.50 0
2012-03-13 Multi-Stage Fracture 3268.60 3269.40 0
2012-03-13 Multi-Stage Fracture 3129.20 3130.00 0
2012-03-14 Multi-Stage Fracture 3003.60 3004.40 0
2012-03-14 Multi-Stage Fracture 2863.90 2864.70 0
2012-03-14 Multi-Stage Fracture 2724.80 2725.60 0
2012-03-14 Multi-Stage Fracture 2595.70 2596.50 0
2012-03-10 Multi-Stage Fracture 4761.70 4762.50 0
2012-03-10 Multi-Stage Fracture 4617.10 4617.90 0
2012-03-11 Multi-Stage Fracture 4491.30 4492.10 0
2012-03-11 Multi-Stage Fracture 4352.60 4353.40 0
2012-03-11 Multi-Stage Fracture 4213.30 4214.10 0
2012-03-11 Multi-Stage Fracture 4074.80 4075.60 0
2012-03-11 Multi-Stage Fracture 3949.60 3950.40 0
2012-03-12 Multi-Stage Fracture 3810.90 3811.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4766 0.0 0.0 0.0
2013 8664 0.0 0.0 0.0
2014 8626 0.0 0.0 0.0
2015 7501 0.0 0.0 0.0
2016 8384 0.0 0.0 0.0
2017 7958 0.0 0.0 0.0
2018 8312 0.0 0.0 0.0
2019 7229 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References