X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0794100401AA0

Well Details

Well ID: 0794100401AA0
Loading map...
Location: AA/01-04-079-10W4/0
Location Alias: AA/01-04-79-10 W4M
Location Alias 2: AA/01-04-079-10 W4/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 4
Range: 10
Section: 04
County/Municipality: Lac La Biche County
Well Name: ATH LEISMER 1-4-79-10
Operator Name: Athabasca Oil Corporation
License Number: 0416152
License Date: 2009-12-22
License Status: RecCertified
Spud Date: 2010-02-02
Final Drill Date: 2010-02-05
Well Total Depth: 480.00 m
Surface Hole Latitude: 55.811869
Surface Hole Longitude: -111.496472

For data sources see[1][2]

Well History

Date Event
2009-12-22 Obtained License
2010-02-02 Surface Casing Operation Performed
2010-02-05 Finished Drilling
2010-02-05 Well Log Performed
2010-02-05 Well Mode changed to Drilled and Cased
2010-02-06 Production Casing Operation Performed
2010-02-06 Rig Released
2010-03-11 Perforation Treatment Performed - Jet Perforation
2010-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-12 Perforation Treatment Performed - Jet Perforation
2010-03-12 Plug Back Performed
2010-03-12 Well Mode changed to Abandoned Zone
2010-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-13 Perforation Treatment Performed - Jet Perforation
2010-03-13 Plug Back Performed
2010-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-14 Perforation Treatment Performed - Jet Perforation
2010-03-14 Plug Back Performed
2011-03-16 Well Abandoned
2011-03-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-11 Perforation 436.00 436.50 20
2010-03-14 Packing Device Capped w/Cement 250.00 258.00 0
2010-03-14 Perforation 240.00 240.50 20
2010-03-14 Packing Device Capped w/Cement 227.00 235.00 0
2010-03-12 Packing Device Capped w/Cement 425.00 433.00 0
2010-03-12 Perforation 400.00 400.50 20
2010-03-12 Packing Device Capped w/Cement 387.00 395.00 0
2010-03-12 Perforation 362.50 363.00 20
2010-03-13 Packing Device Capped w/Cement 353.00 361.00 0
2010-03-13 Perforation 342.00 342.50 20
2010-03-13 Packing Device Capped w/Cement 332.00 340.00 0
2010-03-13 Perforation 260.00 260.50 20

For data sources see[4]



References