X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0804083313AA0

Well Details

Well ID: 0804083313AA0
Loading map...
Location: AA/13-33-080-08W4/0
Location Alias: AA/13-33-80-08 W4M
Location Alias 2: AA/13-33-080-08 W4/00
Country: Canada
Province: Alberta
Township: 080
Meridian: 4
Range: 08
Section: 33
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: ATH LEISMER 13-33-80-8
Operator Name: Athabasca Oil Corporation
License Number: 0417087
License Date: 2010-01-11
License Status: RecCertified
Spud Date: 2010-02-18
Final Drill Date: 2010-02-23
Well Total Depth: 500.00 m
Surface Hole Latitude: 55.982530
Surface Hole Longitude: -111.203041

For data sources see[1][2]

Well History

Date Event
2010-01-11 Obtained License
2010-02-19 Surface Casing Operation Performed
2010-02-23 Finished Drilling
2010-02-23 Well Log Performed
2010-02-23 Well Mode changed to Drilled and Cased
2010-02-24 Production Casing Operation Performed
2010-02-24 Rig Released
2010-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-15 Perforation Treatment Performed - Jet Perforation
2010-03-15 Plug Back Performed
2010-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-16 Perforation Treatment Performed - Jet Perforation
2010-03-16 Plug Back Performed
2010-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-17 Perforation Treatment Performed - Jet Perforation
2010-03-17 Plug Back Performed
2010-03-17 Well Mode changed to Abandoned Zone
2011-03-17 Well Abandoned
2011-03-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-15 Perforation 476.50 477.00 20
2010-03-17 Packing Device Capped w/Cement 315.00 323.00 0
2010-03-17 Perforation 275.00 275.50 20
2010-03-17 Packing Device Capped w/Cement 265.00 273.00 0
2010-03-15 Packing Device Capped w/Cement 467.50 475.50 0
2010-03-15 Perforation 463.50 464.00 20
2010-03-16 Packing Device Capped w/Cement 454.00 462.00 0
2010-03-16 Perforation 440.00 440.50 20
2010-03-16 Packing Device Capped w/Cement 429.00 437.00 0
2010-03-16 Perforation 403.00 403.50 20
2010-03-16 Packing Device Capped w/Cement 392.00 400.00 0
2010-03-16 Perforation 325.00 325.50 20

For data sources see[4]



References