X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0805242406002

Well Details

Well ID: 0805242406002
Loading map...
Location: 00/06-24-080-24W5/2
Location Alias: 00/06-24-80-24 W5M
Location Alias 2: 00/06-24-080-24 W5/02
Country: Canada
Province: Alberta
Township: 080
Meridian: 5
Range: 24
Section: 24
County/Municipality: Birch Hills County
Well Name: UPRI TANGENT 6-24-80-24
Operator Name: Obsidian Energy Ltd.
License Number: 0162346
License Date: 1993-11-17
License Status: RecCertified
Spud Date: 1993-11-29
Final Drill Date: 1994-07-30
Well Total Depth: 2800.00 m
Surface Hole Latitude: 55.946938
Surface Hole Longitude: -117.604407

For data sources see[1][2]

Well History

Date Event
1993-11-17 Obtained License
1993-12-01 Surface Casing Operation Performed
1993-12-11 Direction Drilling Operation Performed - Horizontal
1993-12-15 Production Casing Operation Performed
1994-07-21 Direction Drilling Operation Performed - Horizontal
1994-07-30 Finished Drilling
1994-07-30 Perforation Treatment Performed - Open-Hole Completion
1994-07-31 Well Log Performed
1994-08-02 Rig Released
1994-08-02 Well Structure changed to Drain
1994-08-04 Well Log Performed
2009-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-13 Perforation Treatment Performed - Cement Plug
2009-03-13 Plug Back Performed
2009-03-13 Well Mode changed to Abandoned Zone
2009-03-13 Well Structure changed to Drain
2009-03-14 Perforation Treatment Performed - Jet Perforation
2009-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-15 Perforation Treatment Performed - Remedial Casing
2009-03-16 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-12-11 1620.00 Horizontal
1994-07-21 1852.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-30 Open Hole/Barefoot Completion 1821.00 2800.00 0
2009-03-13 Packing Device Capped w/Cement 1789.00 1815.00 0
2009-03-13 Cement Plug 721.70 850.00 0
2009-03-14 Perforation 420.00 421.00 17
2009-03-15 Remedial Casing Cementing 420.00 421.00 0
2009-03-15 Packing Device Capped w/Cement 402.30 414.60 0

For data sources see[5]



References