If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0814191913AA0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.042128,"lon":-112.976233,"icon":""}]} |
Location: AA/13-19-081-19W4/0 | |
Location Alias: AA/13-19-81-19 W4M | |
Location Alias 2: AA/13-19-081-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 4 | |
Range: 19 | |
Section: 19 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: GAO JOLI FOU 1-80 P-3 | |
Operator Name: Phillips Petroleum Resources, Ltd. | |
License Number: 0080175A | |
License Date: 1980-01-03 | |
License Status: RecCertified | |
Spud Date: 1980-03-09 | |
Final Drill Date: 1980-03-11 | |
Well Total Depth: 373.00 m | |
Surface Hole Latitude: 56.042128 | |
Surface Hole Longitude: -112.976233 |
Date | Event |
---|---|
1980-01-03 | Obtained License |
1980-03-11 | Finished Drilling |
1980-03-11 | Well Log Performed |
1980-03-11 | Well Mode changed to Drilled and Cased |
1980-03-12 | Perforation Treatment Performed - Slotted Liner or Casing |
1980-03-12 | Production Casing Operation Performed |
1981-03-30 | Well Began Production |
1981-03-30 | Well Fluid changed to Crude Bitumen |
1981-03-30 | Well Type changed to Cyclical |
1983-02-21 | Perforation Treatment Performed - Cement Plug |
1983-02-21 | Plug Back Performed |
1983-02-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-02-22 | Plug Back Performed |
1983-02-22 | Well Abandoned |
1983-02-22 | Well Fluid changed to Crude Bitumen |
1983-02-22 | Well Mode changed to Abandoned |
1983-02-22 | Well Type changed to Cyclical |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-03-12 | Slotted Liner | 352.20 | 368.30 | 0 |
1983-02-21 | Cement Plug | 348.00 | 368.30 | 0 |
1983-02-22 | Packing Device Capped w/Cement | 156.80 | 345.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 1584 | 0.0 | 0.0 | 0.0 |
1982 | 4544 | 0.0 | 0.0 | 0.0 |
1983 | 1113 | 0.0 | 0.0 | 0.0 |
For data sources see[5]