If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0814193004AB0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.04371,"lon":-112.976039,"icon":""}]} |
Location: AB/04-30-081-19W4/0 | |
Location Alias: AB/04-30-81-19 W4M | |
Location Alias 2: AB/04-30-081-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 081 | |
Meridian: 4 | |
Range: 19 | |
Section: 30 | |
County/Municipality: Municipal District of Opportunity No. 17 | |
Well Name: GAO JOLI FOU PW2 | |
Operator Name: Phillips Petroleum Resources, Ltd. | |
License Number: 0080175D | |
License Date: 1980-01-03 | |
License Status: RecCertified | |
Spud Date: 1980-03-30 | |
Final Drill Date: 1980-04-01 | |
Well Total Depth: 371.00 m | |
Surface Hole Latitude: 56.043710 | |
Surface Hole Longitude: -112.976039 |
Date | Event |
---|---|
1980-01-03 | Obtained License |
1980-04-01 | Finished Drilling |
1980-04-01 | Well Mode changed to Drilled and Cased |
1980-04-03 | Liner Casing Operation Performed |
1980-04-03 | Perforation Treatment Performed - Slotted Liner or Casing |
1980-04-03 | Production Casing Operation Performed |
1981-04-26 | Well Began Production |
1981-04-26 | Well Fluid changed to Crude Bitumen |
1981-04-26 | Well Type changed to Cyclical |
1983-02-17 | Perforation Treatment Performed - Cement Plug |
1983-02-17 | Plug Back Performed |
1983-02-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-02-18 | Plug Back Performed |
1983-02-18 | Well Abandoned |
1983-02-18 | Well Fluid changed to Crude Bitumen |
1983-02-18 | Well Mode changed to Abandoned |
1983-02-18 | Well Type changed to Cyclical |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-04-03 | Slotted Liner | 352.60 | 369.70 | 0 |
1983-02-17 | Cement Plug | 350.00 | 369.70 | 0 |
1983-02-18 | Packing Device Capped w/Cement | 179.20 | 345.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 3984 | 0.0 | 0.0 | 0.0 |
1982 | 5350 | 0.0 | 0.0 | 0.0 |
1983 | 667 | 0.0 | 0.0 | 0.0 |
For data sources see[5]