X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875090606000

Well Details

Well ID: 0875090606000
Loading map...
Location: 00/06-06-087-09W5/0
Location Alias: 00/06-06-87-09 W5M
Location Alias 2: 00/06-06-087-09 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 09
Section: 06
County/Municipality: Loon Lake 235
Well Name: HARVEST LOON 6-6-87-9
Operator Name: Harvest Operations Corp.
License Number: 0340123
License Date: 2005-10-15
License Status: Issued
Spud Date: 2005-12-07
Final Drill Date: 2005-12-27
Well Total Depth: 1780.00 m
Surface Hole Latitude: 56.511826
Surface Hole Longitude: -115.412909

For data sources see[1][2]

Well History

Date Event
2005-10-15 Obtained License
2005-12-08 Surface Casing Operation Performed
2005-12-09 Direction Drilling Operation Performed - Deviate
2005-12-22 Intermediate Casing Operation Performed
2005-12-27 Finished Drilling
2005-12-27 Well Log Performed
2005-12-27 Well Mode changed to Drilled and Cased
2005-12-29 Production Casing Operation Performed
2005-12-29 Rig Released
2006-01-09 Perforation Treatment Performed - Jet Perforation
2006-01-10 Perforation Treatment Performed - Fractured
2006-01-15 Well Began Production
2006-01-15 Well Fluid changed to Crude Oil
2006-01-15 Well Mode changed to Pumping
2009-06-27 Well Log Performed
2009-06-28 Well Log Performed
2009-07-22 Perforation Treatment Performed - Jet Perforation
2009-07-23 Perforation Treatment Performed - Remedial Casing
2013-08-24 Well Log Performed
2013-08-25 Well Log Performed
2013-08-26 Perforation Treatment Performed - Jet Perforation
2013-08-26 Perforation Treatment Performed - Remedial Casing
2013-08-26 Well Log Performed
2013-09-07 Perforation Treatment Performed - Remedial Casing
2013-09-07 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-12-09 311.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-01-09 Perforation 1727.00 1729.00 17
2013-08-26 Perforation 294.00 295.00 17
2013-09-07 Remedial Casing Cementing 294.00 295.00 0
2006-01-09 Perforation 1733.00 1736.00 17
2006-01-09 Perforation 1737.00 1740.00 17
2006-01-09 Perforation 1746.00 1750.00 17
2006-01-10 Fracture 1727.00 1750.00 0
2009-07-22 Perforation 798.00 799.00 20
2009-07-23 Remedial Casing Cementing 798.00 799.00 0
2013-08-26 Perforation 355.00 356.00 17
2013-08-26 Remedial Casing Cementing 355.00 356.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 7991 0.0 0.0 0.0
2007 7791 0.0 0.0 0.0
2008 8542 0.0 0.0 0.0
2009 7819 0.0 0.0 0.0
2010 7506 0.0 0.0 0.0
2011 4949 0.0 0.0 0.0
2012 8315 0.0 0.0 0.0
2013 7967 0.0 0.0 0.0
2014 6797 0.0 0.0 0.0
2015 8609 0.0 0.0 0.0
2016 7995 0.0 0.0 0.0
2017 6789 0.0 0.0 0.0
2018 8595 0.0 0.0 0.0
2019 7556 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References