X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875090711000

Well Details

Well ID: 0875090711000
Loading map...
Location: 00/11-07-087-09W5/0
Location Alias: 00/11-07-87-09 W5M
Location Alias 2: 00/11-07-087-09 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 09
Section: 07
County/Municipality: Northern Sunrise County
Well Name: HARVEST HZ LOON 11-7-87-9
Operator Name: Harvest Operations Corp.
License Number: 0438763
License Date: 2011-11-14
License Status: Amended
Spud Date: 2012-02-03
Final Drill Date: 2012-02-16
Well Total Depth: 2881.00 m
Surface Hole Latitude: 56.533210
Surface Hole Longitude: -115.455373

For data sources see[1][2]

Well History

Date Event
2011-11-14 Obtained License
2012-02-04 Surface Casing Operation Performed
2012-02-04 Well Log Performed
2012-02-06 Direction Drilling Operation Performed - Deviate
2012-02-09 Intermediate Casing Operation Performed
2012-02-10 Direction Drilling Operation Performed - Horizontal
2012-02-16 Finished Drilling
2012-02-16 Well Log Performed
2012-02-16 Well Mode changed to Drilled and Cased
2012-02-17 Liner Casing Operation Performed
2012-02-18 Rig Released
2012-02-29 Well Log Performed
2012-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-11 Well Began Production
2012-05-11 Well Fluid changed to Crude Oil
2012-05-11 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-03 Trinidad Drilling Ltd. 91 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-06 1088.00 Deviate (5 - 79 degrees)
2012-02-10 1449.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-08 Multi-Stage Fracture 2800.00 2803.90 0
2012-03-08 Multi-Stage Fracture 2157.80 2161.70 0
2012-03-09 Multi-Stage Fracture 2086.40 2090.30 0
2012-03-09 Multi-Stage Fracture 2015.00 2019.00 0
2012-03-09 Multi-Stage Fracture 1943.70 1947.60 0
2012-03-09 Multi-Stage Fracture 1872.30 1876.30 0
2012-03-09 Multi-Stage Fracture 1801.00 1804.90 0
2012-03-09 Multi-Stage Fracture 1729.60 1733.50 0
2012-03-09 Multi-Stage Fracture 1658.20 1662.20 0
2012-03-09 Multi-Stage Fracture 1586.90 1590.80 0
2012-03-09 Multi-Stage Fracture 1515.50 1519.50 0
2012-03-08 Multi-Stage Fracture 2728.60 2732.60 0
2012-03-08 Multi-Stage Fracture 2657.30 2661.20 0
2012-03-08 Multi-Stage Fracture 2585.90 2589.90 0
2012-03-08 Multi-Stage Fracture 2514.60 2518.50 0
2012-03-08 Multi-Stage Fracture 2443.20 2447.10 0
2012-03-08 Multi-Stage Fracture 2371.80 2375.80 0
2012-03-08 Multi-Stage Fracture 2300.50 2304.40 0
2012-03-08 Multi-Stage Fracture 2229.10 2233.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4517 0.0 0.0 0.0
2013 7659 0.0 0.0 0.0
2014 8475 0.0 0.0 0.0
2015 7635 0.0 0.0 0.0
2016 8337 0.0 0.0 0.0
2017 8154 0.0 0.0 0.0
2018 8373 0.0 0.0 0.0
2019 8366 0.0 0.0 0.0
2020 1994 0.0 0.0 0.0

For data sources see[7]

References