X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875123613002

Well Details

Well ID: 0875123613002
Loading map...
Location: 00/13-36-087-12W5/2
Location Alias: 00/13-36-87-12 W5M
Location Alias 2: 00/13-36-087-12 W5/02
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 12
Section: 36
County/Municipality: Northern Sunrise County
Well Name: MBOG EVI 16-36-87-12
Operator Name: Surge Energy Inc.
License Number: 0422125
License Date: 2010-07-23
License Status: Amended
Spud Date: 2010-11-01
Final Drill Date: 2010-11-27
Well Total Depth: 3187.00 m
Surface Hole Latitude: 56.594149
Surface Hole Longitude: -115.751563

For data sources see[1][2]

Well History

Date Event
2010-07-23 Obtained License
2010-11-03 Surface Casing Operation Performed
2010-11-06 Direction Drilling Operation Performed - Horizontal
2010-11-15 Direction Drilling Operation Performed - Horizontal
2010-11-18 Intermediate Casing Operation Performed
2010-11-27 Finished Drilling
2010-11-27 Well Log Performed
2010-11-27 Well Mode changed to Drilled and Cased
2010-11-30 Liner Casing Operation Performed
2010-12-02 Rig Released
2010-12-05 Well Log Performed
2010-12-12 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-12 Perforation Treatment Performed - Open-Hole Completion
2010-12-29 Well Began Production
2010-12-29 Well Fluid changed to Crude Oil
2010-12-29 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-06 1059.00 Horizontal
2010-11-15 1576.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-12 Open Hole/Barefoot Completion 3182.00 3187.00 0
2010-12-12 Multi-Stage Fracture 2574.30 2574.40 0
2010-12-12 Multi-Stage Fracture 2515.00 2515.10 0
2010-12-12 Multi-Stage Fracture 2442.20 2442.30 0
2010-12-12 Multi-Stage Fracture 2369.40 2369.50 0
2010-12-12 Multi-Stage Fracture 2297.90 2298.00 0
2010-12-12 Multi-Stage Fracture 2226.80 2226.90 0
2010-12-12 Multi-Stage Fracture 2155.30 2155.40 0
2010-12-12 Multi-Stage Fracture 2084.40 2084.50 0
2010-12-12 Multi-Stage Fracture 2025.50 2025.60 0
2010-12-12 Multi-Stage Fracture 1953.40 1953.50 0
2010-12-12 Multi-Stage Fracture 3159.30 3159.40 0
2010-12-12 Multi-Stage Fracture 1880.90 1881.00 0
2010-12-12 Multi-Stage Fracture 1821.80 1821.90 0
2010-12-12 Multi-Stage Fracture 3106.90 3107.00 0
2010-12-12 Multi-Stage Fracture 3047.90 3048.00 0
2010-12-12 Multi-Stage Fracture 2949.30 2949.40 0
2010-12-12 Multi-Stage Fracture 2864.60 2864.70 0
2010-12-12 Multi-Stage Fracture 2792.20 2792.30 0
2010-12-12 Multi-Stage Fracture 2719.20 2719.30 0
2010-12-12 Multi-Stage Fracture 2660.60 2660.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 24 0.0 0.0 0.0
2011 7081 0.0 0.0 0.0
2012 8083 0.0 0.0 0.0
2013 8615 0.0 0.0 0.0
2014 8663 0.0 0.0 0.0
2015 8359 0.0 0.0 0.0
2016 8740 0.0 0.0 0.0
2017 8654 0.0 0.0 0.0
2018 5954 0.0 0.0 0.0
2019 5795 0.0 0.0 0.0
2020 1834 0.0 0.0 0.0

For data sources see[6]

References