If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0885121304033 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.631691,"lon":-115.7531,"icon":""}]} |
Location: 03/04-13-088-12W5/3 | |
Location Alias: 03/04-13-88-12 W5M | |
Location Alias 2: 03/04-13-088-12 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 088 | |
Meridian: 5 | |
Range: 12 | |
Section: 13 | |
County/Municipality: Northern Sunrise County | |
Well Name: MBOG EVI 4-13-88-12 | |
Operator Name: Surge Energy Inc. | |
License Number: 0439463 | |
License Date: 2011-11-23 | |
License Status: Amended | |
Spud Date: 2012-02-24 | |
Final Drill Date: 2012-03-24 | |
Well Total Depth: 3410.00 m | |
Surface Hole Latitude: 56.631691 | |
Surface Hole Longitude: -115.753100 |
Date | Event |
---|---|
2011-11-23 | Obtained License |
2012-02-26 | Surface Casing Operation Performed |
2012-02-29 | Direction Drilling Operation Performed - Deviate |
2012-03-01 | Direction Drilling Operation Performed - Horizontal |
2012-03-03 | Intermediate Casing Operation Performed |
2012-03-13 | Direction Drilling Operation Performed - Horizontal |
2012-03-18 | Direction Drilling Operation Performed - Horizontal |
2012-03-19 | Well Log Performed |
2012-03-24 | Finished Drilling |
2012-03-24 | Well Log Performed |
2012-03-24 | Well Mode changed to Drilled and Cased |
2012-03-26 | Liner Casing Operation Performed |
2012-03-27 | Rig Released |
2012-05-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-29 | Perforation Treatment Performed - Open-Hole Completion |
2012-05-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-05-30 | Perforation Treatment Performed - Open-Hole Completion |
2012-06-08 | Well Began Production |
2012-06-08 | Well Fluid changed to Crude Oil |
2012-06-08 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-29 | 1253.00 | Deviate (5 - 79 degrees) |
2012-03-01 | 1621.00 | Horizontal |
2012-03-13 | 1646.50 | Horizontal |
2012-03-18 | 2025.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-05-29 | Open Hole/Barefoot Completion | 3399.00 | 3410.00 | 0 |
2012-05-29 | Multi-Stage Fracture | 2776.60 | 2776.70 | 0 |
2012-05-29 | Multi-Stage Fracture | 2702.10 | 2702.20 | 0 |
2012-05-29 | Multi-Stage Fracture | 2627.70 | 2627.80 | 0 |
2012-05-29 | Multi-Stage Fracture | 2553.30 | 2553.40 | 0 |
2012-05-29 | Multi-Stage Fracture | 2492.90 | 2493.00 | 0 |
2012-05-29 | Multi-Stage Fracture | 2417.90 | 2418.00 | 0 |
2012-05-29 | Multi-Stage Fracture | 2343.40 | 2343.50 | 0 |
2012-05-30 | Multi-Stage Fracture | 2268.90 | 2269.00 | 0 |
2012-05-30 | Multi-Stage Fracture | 2194.50 | 2194.60 | 0 |
2012-05-30 | Multi-Stage Fracture | 2120.00 | 2120.10 | 0 |
2012-05-29 | Multi-Stage Fracture | 3362.80 | 3362.90 | 0 |
2012-05-30 | Multi-Stage Fracture | 2045.50 | 2045.60 | 0 |
2012-05-30 | Multi-Stage Fracture | 1971.10 | 1971.20 | 0 |
2012-05-30 | Open Hole/Barefoot Completion | 1646.50 | 1674.90 | 0 |
2012-05-29 | Multi-Stage Fracture | 3296.80 | 3296.90 | 0 |
2012-05-29 | Multi-Stage Fracture | 3222.40 | 3222.50 | 0 |
2012-05-29 | Multi-Stage Fracture | 3148.10 | 3148.20 | 0 |
2012-05-29 | Multi-Stage Fracture | 3073.70 | 3073.80 | 0 |
2012-05-29 | Multi-Stage Fracture | 2999.30 | 2999.40 | 0 |
2012-05-29 | Multi-Stage Fracture | 2925.30 | 2925.40 | 0 |
2012-05-29 | Multi-Stage Fracture | 2851.00 | 2851.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3142 | 0.0 | 0.0 | 0.0 |
2013 | 8486 | 0.0 | 0.0 | 0.0 |
2014 | 8137 | 0.0 | 0.0 | 0.0 |
2015 | 8458 | 0.0 | 0.0 | 0.0 |
2016 | 8637 | 0.0 | 0.0 | 0.0 |
2017 | 8426 | 0.0 | 0.0 | 0.0 |
2018 | 7739 | 0.0 | 0.0 | 0.0 |
2019 | 7921 | 0.0 | 0.0 | 0.0 |
2020 | 1676 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-27 | No Incident Encountered | 0.00 | 0.00 |
2012-06-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]