X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0915120601000

Well Details

Well ID: 0915120601000
Loading map...
Location: 00/01-06-091-12W5/0
Location Alias: 00/01-06-91-12 W5M
Location Alias 2: 00/01-06-091-12 W5/00
Country: Canada
Province: Alberta
Township: 091
Meridian: 5
Range: 12
Section: 06
County/Municipality: Northern Sunrise County
Well Name: MBOG HZ SAWN LK 1-6-91-12
Operator Name: Surge Energy Inc.
License Number: 0487629
License Date: 2018-01-12
License Status: Issued
Spud Date: 2018-02-27
Final Drill Date: 2018-03-10
Well Total Depth: 3449.00 m
Surface Hole Latitude: 56.862906
Surface Hole Longitude: -115.937718

For data sources see[1][2]

Well History

Date Event
2018-01-12 Obtained License
2018-03-02 Surface Casing Operation Performed
2018-03-04 Direction Drilling Operation Performed - Deviate
2018-03-04 Intermediate Casing Operation Performed
2018-03-06 Direction Drilling Operation Performed - Horizontal
2018-03-10 Finished Drilling
2018-03-10 Well Log Performed
2018-03-10 Well Mode changed to Drilled and Cased
2018-03-11 Production Casing Operation Performed
2018-03-12 Rig Released
2018-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-09 Well Began Production
2018-04-09 Well Fluid changed to Crude Oil
2018-04-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-27 Precision Drilling Corporation 186 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-03-04 1398.90 Deviate (5 - 79 degrees)
2018-03-06 1754.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-23 Multi-Stage Fracture 3416.40 3416.50 0
2018-03-24 Multi-Stage Fracture 2869.40 2869.50 0
2018-03-24 Multi-Stage Fracture 2808.00 2808.10 0
2018-03-24 Multi-Stage Fracture 2747.20 2747.30 0
2018-03-24 Multi-Stage Fracture 2687.40 2687.50 0
2018-03-24 Multi-Stage Fracture 2627.00 2627.10 0
2018-03-24 Multi-Stage Fracture 2564.50 2564.60 0
2018-03-24 Multi-Stage Fracture 2502.20 2502.30 0
2018-03-24 Multi-Stage Fracture 2442.10 2442.20 0
2018-03-24 Multi-Stage Fracture 2379.60 2379.70 0
2018-03-24 Multi-Stage Fracture 2318.10 2318.20 0
2018-03-23 Multi-Stage Fracture 3355.40 3355.50 0
2018-03-24 Multi-Stage Fracture 2257.20 2257.30 0
2018-03-24 Multi-Stage Fracture 2194.40 2194.50 0
2018-03-24 Multi-Stage Fracture 2135.30 2135.40 0
2018-03-24 Multi-Stage Fracture 2073.90 2074.00 0
2018-03-23 Multi-Stage Fracture 3295.20 3295.30 0
2018-03-23 Multi-Stage Fracture 3234.40 3234.50 0
2018-03-23 Multi-Stage Fracture 3172.70 3172.80 0
2018-03-24 Multi-Stage Fracture 3111.90 3112.00 0
2018-03-24 Multi-Stage Fracture 3051.00 3051.10 0
2018-03-24 Multi-Stage Fracture 2989.70 2989.80 0
2018-03-24 Multi-Stage Fracture 2930.00 2930.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-23 2018-03-24 1,656 2,129 N/A
2 2018-03-23 2018-03-23 1,656 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 81.4469 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 17.4103 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.5238 N/A
Water 7732-18-5 100 0.5238 N/A
SAB-1 Acid Blend Step Energy Services Acid Acetic Acid 64-19-7 100 0.0057 N/A
Ethylene Glycol 107-21-1 100 0.0057 N/A
Methyl Alcohol 67-56-1 100 0.0057 N/A
Non Hazardous Ingredients Not Available 100 0.0057 N/A
Propan-2-ol 67-63-0 100 0.0057 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.009 N/A
Methyl Alcohol 67-56-1 100 0.009 N/A
Non-Hazardous Ingredients Not Available 100 0.009 N/A
SCBO-1 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0134 N/A
Cured Acrylic Resin Not Available 100 0.0134 N/A
Talc 14807-96-6 100 0.0133 N/A
SBX-2 (Crosslinker) Step Energy Services Crosslinker Proprietary Trade Secret 100 0.1218 N/A
Water 7732-18-5 100 0.1218 N/A
SWG-101 (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.1945 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0068 N/A
Non-Hazardous Ingredients Not Available 100 0.0068 N/A
SAS-4 (Anti-Sludge) Step Energy Services Surfactant 1.1' - Oxybisbenzene. tetrapropylene dervis. sulfonated 119345-03-8 100 0.0026 N/A
Alkylbenzene sulfonic acid 27176-87-0 100 0.0026 N/A
Methanol 67-56-1 100 0.0026 N/A
Xylene 1330-20-7 100 0.0026 N/A
SNE-8 (Non-Emulsifier) Step Energy Services Surfactant Alkyl Aryl Sulfonic Acid Not Available 100 0.0704 N/A
Alkyl Sulfate Not Available 100 0.0704 N/A
Methanol 67-56-1 100 0.0704 N/A
Polyalkylhydroxyl Alcohol Not Available 100 0.0704 N/A
2 20/40 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 14.1221 N/A
SML-LDP1 Step Energy Services Friction Reducer Non-Hazardous Ingredients Not Available 100 0.07 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-22 2018-03-24 Surface Water - Runoff 1925

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6075 0.0 0.0 0.0
2019 8553 0.0 0.0 0.0
2020 2150 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-12 No Incident Encountered 0.00 0.00
2018-04-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References