X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1126043004002

Well Details

Well ID: 1126043004002
Loading map...
Location: 00/04-30-112-04W6/2
Location Alias: 00/04-30-12-04 W6M
Location Alias 2: 00/04-30-112-04 W6/02
Country: Canada
Province: Alberta
Township: 112
Meridian: 6
Range: 04
Section: 30
County/Municipality: Hay Lake 209
Well Name: NUVISTA SOUSA 11-30-112-4
Operator Name: NuVista Energy Ltd.
License Number: 0192654
License Date: 1996-10-25
License Status: RecExempt
Spud Date: 1996-11-11
Final Drill Date: 1996-12-04
Well Total Depth: 2142.00 m
Surface Hole Latitude: 58.755869
Surface Hole Longitude: -118.665761

For data sources see[1][2]

Well History

Date Event
1996-10-25 Obtained License
1996-11-13 Surface Casing Operation Performed
1996-11-21 Well Log Performed
1996-11-23 Direction Drilling Operation Performed - Horizontal
1996-11-28 Production Casing Operation Performed
1996-12-02 Lost Circulation Occurred
1996-12-04 Finished Drilling
1996-12-04 Perforation Treatment Performed - Open-Hole Completion
1996-12-04 Well Log Performed
1996-12-04 Well Mode changed to Drilled and Cased
1996-12-05 Well Log Performed
1996-12-06 Rig Released
1996-12-09 Well Log Performed
1996-12-16 Well Began Production
1996-12-16 Well Fluid changed to Crude Oil
1996-12-16 Well Mode changed to Pumping
2010-11-01 Well Fluid changed to Crude Oil
2010-11-01 Well Mode changed to Suspended
2012-03-02 Well Abandoned
2020-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-12 Plug Back Performed
2020-01-12 Well Fluid changed to Crude Oil
2020-01-12 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-11-23 1279.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-04 Open Hole/Barefoot Completion 1526.00 2142.00 0
2012-02-16 Perforation 425 427 17
2012-02-17 Remedial Casing Cementing 425 427 0
2012-02-18 Perforation 220 222 17
2012-02-20 Remedial Casing Cementing 220 222 0
2012-02-21 Perforation 150 152 17
2012-02-23 Remedial Casing Cementing 150 152 0
2020-01-12 Packing Device Capped w/Cement 1511.00 1519.00 0
2012-02-08 Remedial Casing Cementing 1342.5 1344.5 0
2012-02-10 Perforation 1001 1003 17
2012-02-10 Packing Device Capped w/Cement 987 995 0
2012-02-11 Perforation 627.5 629.5 17
2012-02-13 Remedial Casing Cementing 627.5 629.5 0
2012-02-13 Perforation 498 500 17
2012-02-15 Remedial Casing Cementing 498 500 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 380 0.0 0.0 0.0
1997 6304 0.0 0.0 0.0
1998 817 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-12-02 Lost Circulation 1786.00 1836.00
1996-12-10 No Incident Encountered 0.00 0.00
2020-01-13 No Incident Encountered 0.00 0.00

For data sources see[7]

References