If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20914 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.03,"lon":-80.84,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Richland Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-001193 | |
Farm/Lease Name: KURTH UNIT A | |
License Status: Producing | |
License Date: 2015-10-22 | |
Spud Date: 2015-07-07 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-11-10 | |
Well Total Depth: 19051.00 ft | |
Configuration: Horizontal | |
Latitude: 40.030000 | |
Longitude: -80.840000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-01-16 | Proposed Formations:POINT PLESANT, Issued Date:1/16/2015, Expired Date:1/15/2017 12:00:00 PM, Drilling unit acres:420.9715, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2015-07-17 | CORRECTION TO CASING PROGRAM. |
APP | 2015-10-22 | Proposed Formations:POINT PLEASANT, Issued Date:10/22/2015, Expired Date:10/21/2017 12:00:00 PM, Drilling unit acres:193.974, Proposed Well Type:OG, Proposed Well Class:NWC |
Reached Total Depth | 2015-11-10 | |
Correction to Well | 2016-01-08 | ASDRILLED PLAT. CORRECTIONS FOR TAKE POINT. |
Completion Report Received | 2016-07-05 | |
Construction Permit Expires | 2016-10-21 | |
Record Last Modified | 2018-07-24 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/28/2016 | 04/10/2016 | 9734 | 16,926,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP Breaker | Universal | Gel Breaker | |||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.0128 | 141,249,000.0 | |
AP Breaker | Clearwater International | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00537233 | 8525 | |
Ammonium Persulfate | 7727-54-0 | 100 | 0.00006743 | 107 | ||||
KCl, Muirate of Potash | IMC | Salt | Calcium and Magnesium Chlorides and Sulfates | NA | 0.2 | 0.00000013 | 0.214 | |
Potassium Chloride | 7447-40-7 | 99.5 | 0.00006709 | 106.465 | ||||
Sodium Chloride | 7647-14-5 | 0.3 | 0.00000020 | 0.321 | ||||
Unigel 5F | Universal | Viscosifier | Guar Gum | NA | 95 | 0.00510372 | 8098.75 | |
Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0251571 | 39920.1 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0606057 | 96171.1 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0285876 | 45363.7 | ||||
Other - (non-hazardous) | NA | 85 | 0.647985 | 1,028,240.0 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Other - (non-hazardous) | NA | 70 | 0.0111464 | 17687.5 | |
Ethylene Glycol | 107-21-1 | 30 | 0.00477704 | 7580.37 | ||||
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Short chained glycol ether | 112-34-5 | 60 | 0.000395088 | 626.939 | |
Formaldehyde | 50-00-0 | 1 | 0.00000658 | 10.449 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00217193 | 3446.49 | ||||
Methanol | 67-56-1 | 5 | 0.00003292 | 52.245 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000230468 | 365.714 | ||||
Thiourea | 62-56-6 | 1 | 0.00000658 | 10.449 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000658 | 10.449 | ||||
Other - (non-hazardous) | NA | 30 | 0.00325789 | 5169.73 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.00542981 | 8616.21 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0204913 | 32516.2 | |
Other - (non-hazardous) | NA | 70 | 0.0478129 | 75871.2 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 10.1118 | 16,045,800.0 | |
Clay Stabilizer, Cla-Chek G | Shrieve | Clay Stabilizer | Water | 7732-18-5 | 15 | 0.001778 | 2821.39 | |
Other - (non-hazardous) | NA | 85 | 0.0100753 | 15987.9 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 11747 Bbl | 486500 | Universal Well Services Inc. | STAGE 33/33
60 SHOTS | |
H2O | 15 | 12136 Bbl | 486500 | Universal Well Services Inc. | STAGE 1/32
60 SHOTS STAGES 2/31 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | 2005720 | 0 | 165 |
2017 | XTO ENERGY INC. | 2989191 | 0 | 256 |
2018 | XTO ENERGY INC. | 3036915 | 0 | 365 |
2019 | XTO ENERGY INC. | 313024 | 0 | 78 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | Brine | 14138 | 165 |
2017 | XTO ENERGY INC. | Brine | 11049 | 256 |
2018 | XTO ENERGY INC. | Brine | 13280 | 365 |
2019 | XTO ENERGY INC. | Brine | 1577 | 78 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1278571459 | 2020-3-4 0:00:0 | PW | No Violations | 0.20 |
-212982557 | 2018-4-23 0:00: | PW | No Violations | 0.50 |
-2137523713 | 2018-4-24 0:00: | PW | No Violations | 0.50 |
0212982557 | 2018-04-23 | Production Wells | No Violations | The well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit. From there, it is routed to a production area that contains six 400-barrel production fluid holding tanks. Annular pressures readings supplied by the company were 914 pounds in between the outside of the 9.625-inch diameter casing and the inside of the 13.375-inch diameter casing and 456 pounds between the outside of the 5.5-inch diameter casing and the inside of the 9.625-inch diameter casing. The production records within RBDMS are currently updated to 2017. |
0535702597 | 2018-08-23 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was currently using flow back equipment including a sand trap and choke manifold system, the sand trap was connected to 3 500-barrel mobile fluid storage tanks. The well head was equipped with 5.5-inch diameter production casing and was open flowing through a manual master valve. Annular pressure monitoring was in place but had no digital readouts available for reference, there were annular pressure bleed down lines on both the 9.625-inch diameter casing, and 13.375-inch diameter casing, at the time of my inspection the 9.625-inch diameter casing valve was closed, and the 13.375-inch diameter casing valve was open. Production equipment included a gas processing unit and 6 400-barrel production fluid tanks that were shared with the other wells on the pad. There was secondary containment around the production fluid tanks and gas processing units. Identification tags were present, and production reports were current. |
1076998798 | 2019-9-9 0:00:0 | PW | No Violations | 0.20 |
1328181631 | 2019-03-25 | UrbanProduction Wells | No Violations | Status check inspection found a 3rd party contractor identified as Shale Pro on location and currently on site installing the production tree assembly on the well head B section. The company man on site identified as Tracy Vanscoy indicated the company recently had 2.875 production tubing installed on all 4 wells on the pad. The wells were previously produced through the 5.5 production casing. Production equipment on site includes a production facility consisting of (6) 500 barrel steel tanks situated inside a polymer lined steel containment dike area. Also present is (4) gas processing units. Proper well identification is posted at the well pad entry point and tank battery, once the well heads are assembled the identification will be put back up on the wells. The lease road and well pad surface is stone construction and in good repair, no earthen berm is present. Also noted on 11/03/2016 the said Company XTO Energy submitted a waiver to the Division asking for a variance pertaining to fencing, screening and landscaping, the language pertaining to the waiver is found in OAC 1501:9-9-05. |
2137523713 | 2018-04-24 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5 inch diameter production casing and was open flowing with valves in the open position. Annular pressure monitoring was in place but had no digital readouts available for reference. Production equipment included a sand trap, a Gas Processing unit, line heater, and 6- 400 barrel purge tanks shared with 3401320915, 3401321141, 3401321147. Roustabout crew was currently on location and installing lines for annular pressure release. Identification tags were present, and production was up to date. |
535702597 | 2018-8-23 0:00: | PW | No Violations | 0.80 |
For data sources see[9]