If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20964 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.01,"lon":-80.79,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Pultney Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-001298 | |
Farm/Lease Name: VIOLET UNIT | |
License Status: Producing | |
License Date: 2015-09-15 | |
Spud Date: 2015-08-19 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-10-15 | |
Well Total Depth: 17145.00 ft | |
Configuration: Horizontal | |
Latitude: 40.010000 | |
Longitude: -80.790000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-08-04 | Proposed Formations:POINT PLEASANT, Issued Date:8/4/2015, Expired Date:8/3/2017 12:00:00 PM, Drilling unit acres:638.2901, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2015-09-15 | Proposed Formations:POINT PLEASANT, Issued Date:9/15/2015, Expired Date:9/14/2017 12:00:00 PM, Drilling unit acres:224.024, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2015-10-15 | ASDRILLED PLAT RECEIVED 1/4 MS |
Correction to Well | 2016-01-08 | ASDRILLED PLAT. CORRECTIONS FOR TARGET AND TAKE POINT |
Completion Report Received | 2016-04-26 | ASDRILLED PLAT RECEIVED 1/4 MS |
Construction Permit Expires | 2017-09-14 | ASDRILLED PLAT RECEIVED 1/4 MS |
Record Last Modified | 2017-10-23 | ASDRILLED PLAT RECEIVED 1/4 MS |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-04-26 | 11446 | 17380 | 0 |
11446 | 17380 | 0 | |
11446 | 17380 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/05/2016 | 01/19/2016 | 10278 | 14,080,000.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Clay Stabilizer, Cla-Chek G | Shrieve | Clay Stabilizer | Water | 7732-18-5 | 15 | 0.00276679 | 3696.47 |
Other - (non-hazardous) | NA | 85 | 0.0156785 | 20946.7 | ||||
KCl, Muirate of Potash | IMC | Salt | Potassium Chloride | 7447-40-7 | 99.5 | 0.00003147 | 42.039 | |
Sodium Chloride | 7647-14-5 | 0.3 | 0.00000009 | 0.127 | ||||
Calcium and Magnesium Chlorides and Sulfates | NA | 0.2 | 0.00000006 | 0.085 | ||||
AP Breaker | Clearwater International | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00003162 | 42.25 | |
Ammonium Persulfate | 7727-54-0 | 100 | 0.00237872 | 3178 | ||||
Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0341547 | 45631.2 | |
Other - (non-hazardous) | NA | 85 | 0.774174 | 1,034,310.0 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.072408 | 96738.1 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0300562 | 40155.4 | ||||
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00212995 | 2845.65 | |
Other - (non-hazardous) | NA | 30 | 0.00319493 | 4268.47 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000274547 | 366.798 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000784 | 10.48 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000784 | 10.48 | ||||
Thiourea | 62-56-6 | 1 | 0.00000784 | 10.48 | ||||
Methanol | 67-56-1 | 5 | 0.00003922 | 52.4 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.00532488 | 7114.11 | ||||
Short chained glycol ether | 112-34-5 | 60 | 0.000470652 | 628.797 | ||||
AP Breaker | Universal | Gel Breaker | ||||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 11.0239 | 14,728,000.0 | |
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.9464 | 117,498,000.0 | |
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00581782 | 7772.69 | |
Other - (non-hazardous) | NA | 70 | 0.0135749 | 18136.3 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0201663 | 26942.5 | |
Other - (non-hazardous) | NA | 70 | 0.0470548 | 62865.8 | ||||
Unigel 5F | Universal | Viscosifier | Guar Gum | NA | 95 | 0.00225978 | 3019.1 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-01-05 | H2O | 15 | 13952 Bbl | 491300 | Universal Well Services Inc. | STAGE 1/27
60 SHOTS STAGES 2-26 SEE IMAGES |
2016-01-19 | H2O | 15 | 12187 Bbl | 499700 | Universal Well Services Inc. | STAGE 27/27
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | 3033454 | 0 | 307 |
2017 | XTO ENERGY INC. | 2845388 | 0 | 361 |
2018 | XTO ENERGY INC. | 1067011 | 0 | 363 |
2019 | XTO ENERGY INC. | 204532 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | Brine | 36219 | 307 |
2017 | XTO ENERGY INC. | Brine | 26480 | 361 |
2018 | XTO ENERGY INC. | Brine | 11245 | 363 |
2019 | XTO ENERGY INC. | Brine | 2061 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1185378846 | 2016-1-27 0:00: | CT | No Violations | 0.50 |
-1787621600 | 2015-9-19 0:00: | CS | No Violations | 8.00 |
-1934086787 | 2020-4-16 0:00: | PW | No Violations | 0.40 |
-373432480 | 2018-9-11 0:00: | PW | No Violations | 1.00 |
-530997815 | 2017-8-28 0:00: | PW | No Violations | 1.00 |
0373432480 | 2018-09-11 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was currently in normal production operations. The well was equipped with 5.5-inch diameter production casing, and 2.375-inch diameter tubing that appeared to be open flowing. Annular pressure monitoring was in place but had no digital readouts available for reference, there were annular pressure bleed down lines on both the 9.625-inch diameter casing, and 13.375-inch diameter casing, at the time of my inspection the 9.625-inch diameter casing valve was closed, and the 13.375-inch diameter casing valve was open and flowing through a choke manifold. Production equipment included a gas processing unit and 2 400-barrel production fluid tanks that were shared with the other wells on the pad. There was secondary containment around the production fluid tanks and gas processing units. Identification tags were present, and production reports were current. |
0530997815 | 2017-08-28 | Production Wells | No Violations | This well is equipped with 5.5-inch production casing and appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area. The production area contains two 400-barrel production fluid holding tanks. The production is then routed to sale from there. Production records within the RBDMS system are updated to 2017 |
1185378846 | 2016-01-27 | Completion Testing | No Violations | I received a call from Stan Lower of XTO. He informed me that XTO plans to begin flow-back operations on this pad. |
1551201021 | 2019-02-26 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with erosion control and vegetation established. The well pad and lease road surface are stone construction and in good repair. No permiter berm is present around the well pad. One single well is present on the pad equipped with annular pressure monitoring transducers on the well head A&B Sections. The production facility consists of (2) steel 400 barrel production tanks situated inside a polymer lined steel containment dike area. A single gas processing unit is present. |
1787621600 | 2015-09-19 | Casing String Witnessed | No Violations | On this day First Class Energy Rig # 1 had reached the total depth of this section @ 430. The 18.625 casing was ran and cemented into a 26 open hole to a depth of 425. C&J Energy Services cemented the casing with 1200 sacks of Class A cement. A top out job was completed by running a 1 grout string to the top of cement found @ 185. Cement to surface was established. See cement ticket for details. |
For data sources see[10]