34-013-20964

Well Details

Well ID: 34-013-20964
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Pultney Township
Operator Name: XTO ENERGY INC.
Well Pad ID: US-OH-001298
Farm/Lease Name: VIOLET UNIT
License Status: Producing
License Date: 2015-09-15
Spud Date: 2015-08-19
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2015-10-15
Well Total Depth: 17145.00 ft
Configuration: Horizontal
Latitude: 40.010000
Longitude: -80.790000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-08-04 Proposed Formations:POINT PLEASANT, Issued Date:8/4/2015, Expired Date:8/3/2017 12:00:00 PM, Drilling unit acres:638.2901, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2015-09-15 Proposed Formations:POINT PLEASANT, Issued Date:9/15/2015, Expired Date:9/14/2017 12:00:00 PM, Drilling unit acres:224.024, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2015-10-15 ASDRILLED PLAT RECEIVED 1/4 MS
Correction to Well 2016-01-08 ASDRILLED PLAT. CORRECTIONS FOR TARGET AND TAKE POINT
Completion Report Received 2016-04-26 ASDRILLED PLAT RECEIVED 1/4 MS
Construction Permit Expires 2017-09-14 ASDRILLED PLAT RECEIVED 1/4 MS
Record Last Modified 2017-10-23 ASDRILLED PLAT RECEIVED 1/4 MS

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-04-26 11446 17380 0
11446 17380 0
11446 17380 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/05/2016 01/19/2016 10278 14,080,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Clay Stabilizer, Cla-Chek G Shrieve Clay Stabilizer Water 7732-18-5 15 0.00276679 3696.47
Other - (non-hazardous) NA 85 0.0156785 20946.7
KCl, Muirate of Potash IMC Salt Potassium Chloride 7447-40-7 99.5 0.00003147 42.039
Sodium Chloride 7647-14-5 0.3 0.00000009 0.127
Calcium and Magnesium Chlorides and Sulfates NA 0.2 0.00000006 0.085
AP Breaker Clearwater International Gel Breaker Ammonium Persulfate 7727-54-0 100 0.00003162 42.25
Ammonium Persulfate 7727-54-0 100 0.00237872 3178
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.0341547 45631.2
Other - (non-hazardous) NA 85 0.774174 1,034,310.0
Hydrochloric Acid 7647-01-0 15 0.072408 96738.1
Hydrochloric Acid 7647-01-0 15 0.0300562 40155.4
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20 0.00212995 2845.65
Other - (non-hazardous) NA 30 0.00319493 4268.47
Ethoxylated alcohol 68002-97-1 35 0.000274547 366.798
Acetophenone 98-86-2 1 0.00000784 10.48
Formaldehyde 50-00-0 1 0.00000784 10.48
Thiourea 62-56-6 1 0.00000784 10.48
Methanol 67-56-1 5 0.00003922 52.4
Polyethylene Glycol 25322-68-3 50 0.00532488 7114.11
Short chained glycol ether 112-34-5 60 0.000470652 628.797
AP Breaker Universal Gel Breaker
Sand (Proppant) Universal Proppant Silica Substrate NA 100 11.0239 14,728,000.0
Water XTO Carrier/Base Fluid Water 7732-18-5 100 87.9464 117,498,000.0
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00581782 7772.69
Other - (non-hazardous) NA 70 0.0135749 18136.3
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0201663 26942.5
Other - (non-hazardous) NA 70 0.0470548 62865.8
Unigel 5F Universal Viscosifier Guar Gum NA 95 0.00225978 3019.1

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-01-05 H2O 15 13952 Bbl 491300 Universal Well Services Inc. STAGE 1/27

60 SHOTS STAGES 2-26 SEE IMAGES

2016-01-19 H2O 15 12187 Bbl 499700 Universal Well Services Inc. STAGE 27/27

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 XTO ENERGY INC. 3033454 0 307
2017 XTO ENERGY INC. 2845388 0 361
2018 XTO ENERGY INC. 1067011 0 363
2019 XTO ENERGY INC. 204532 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 XTO ENERGY INC. Brine 36219 307
2017 XTO ENERGY INC. Brine 26480 361
2018 XTO ENERGY INC. Brine 11245 363
2019 XTO ENERGY INC. Brine 2061 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1185378846 2016-1-27 0:00: CT No Violations 0.50
-1787621600 2015-9-19 0:00: CS No Violations 8.00
-1934086787 2020-4-16 0:00: PW No Violations 0.40
-373432480 2018-9-11 0:00: PW No Violations 1.00
-530997815 2017-8-28 0:00: PW No Violations 1.00
0373432480 2018-09-11 Production Wells No Violations On the day of my inspection I witnessed that the well was currently in normal production operations. The well was equipped with 5.5-inch diameter production casing, and 2.375-inch diameter tubing that appeared to be open flowing. Annular pressure monitoring was in place but had no digital readouts available for reference, there were annular pressure bleed down lines on both the 9.625-inch diameter casing, and 13.375-inch diameter casing, at the time of my inspection the 9.625-inch diameter casing valve was closed, and the 13.375-inch diameter casing valve was open and flowing through a choke manifold. Production equipment included a gas processing unit and 2 400-barrel production fluid tanks that were shared with the other wells on the pad. There was secondary containment around the production fluid tanks and gas processing units. Identification tags were present, and production reports were current.
0530997815 2017-08-28 Production Wells No Violations This well is equipped with 5.5-inch production casing and appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area. The production area contains two 400-barrel production fluid holding tanks. The production is then routed to sale from there. Production records within the RBDMS system are updated to 2017
1185378846 2016-01-27 Completion Testing No Violations I received a call from Stan Lower of XTO. He informed me that XTO plans to begin flow-back operations on this pad.
1551201021 2019-02-26 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with erosion control and vegetation established. The well pad and lease road surface are stone construction and in good repair. No permiter berm is present around the well pad. One single well is present on the pad equipped with annular pressure monitoring transducers on the well head A&B Sections. The production facility consists of (2) steel 400 barrel production tanks situated inside a polymer lined steel containment dike area. A single gas processing unit is present.
1787621600 2015-09-19 Casing String Witnessed No Violations On this day First Class Energy Rig # 1 had reached the total depth of this section @ 430. The 18.625 casing was ran and cemented into a 26 open hole to a depth of 425. C&J Energy Services cemented the casing with 1200 sacks of Class A cement. A top out job was completed by running a 1 grout string to the top of cement found @ 185. Cement to surface was established. See cement ticket for details.

For data sources see[10]