Well ID: 34-013-20965 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40,"lon":-80.84,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Richland Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-001166 | |
Farm/Lease Name: WRIGHT UNIT B | |
License Status: Producing | |
License Date: 2015-12-03 | |
Spud Date: 2015-08-15 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2015-12-22 | |
Well Total Depth: 23250.00 ft | |
Configuration: Horizontal | |
Latitude: 40.000000 | |
Longitude: -80.840000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-08-07 | Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:8/7/2015, Expired Date:8/6/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Correction to Well | 2015-08-28 | CORRECTION TO CASING PROGRAM. |
APP | 2015-12-03 | Proposed Formations:POINT PLEASANT, Issued Date:12/3/2015, Expired Date:12/2/2017 12:00:00 PM, Drilling unit acres:344.9466, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2015-12-22 | |
Correction to Well | 2016-01-29 | change in target/takepoint per as-drilled plat-ALE |
Completion Report Received | 2016-08-30 | |
Construction Permit Expires | 2016-12-02 | |
Record Last Modified | 2018-12-12 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-08-31 | 10575 | 23127 | 0 |
10575 | 23127 | 0 | |
10575 | 23127 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/16/2016 | 05/06/2016 | 10395 | 26,162,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Other - (non-hazardous) | NA | 70 | 0.0132921 | 32518.1 |
Ethylene Glycol | 107-21-1 | 30 | 0.00569662 | 13936.3 | ||||
AP Breaker | Universal | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00423598 | 10363 | |
Ammonium Persulfate | 7727-54-0 | 100 | 0.00005692 | 139.25 | ||||
AP Breaker | Clearwater International | Gel Breaker | ||||||
Clay Stabilizer, Cla-Chek G | Shrieve | Clay Stabilizer | Other - (non-hazardous) | NA | 85 | 0.024857 | 60810.7 | |
Water | 7732-18-5 | 15 | 0.00438653 | 10731.3 | ||||
KCl, Muirate of Potash | IMC | Salt | Sodium Chloride | 7647-14-5 | 0.3 | 0.00000017 | 0.418 | |
Calcium and Magnesium Chlorides and Sulfates | NA | 0.2 | 0.00000011 | 0.279 | ||||
Potassium Chloride | 7447-40-7 | 99.5 | 0.00005664 | 138.554 | ||||
Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0789235 | 193080 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0327607 | 80146.5 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0372281 | 91075.6 | ||||
Other - (non-hazardous) | NA | 85 | 0.843837 | 2,064,380.0 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.2416 | 218,323,000.0 | |
Unigel 5F | Universal | Viscosifier | Guar Gum | NA | 95 | 0.00402418 | 9844.85 | |
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Polyethylene Glycol | 25322-68-3 | 50 | 0.00544924 | 13331.1 | |
Formaldehyde | 50-00-0 | 1 | 0.00000864 | 21.13 | ||||
Thiourea | 62-56-6 | 1 | 0.00000864 | 21.13 | ||||
Other - (non-hazardous) | NA | 30 | 0.00326954 | 7998.68 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000302301 | 739.556 | ||||
Short chained glycol ether | 112-34-5 | 60 | 0.00051823 | 1267.81 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00217969 | 5332.45 | ||||
Methanol | 67-56-1 | 5 | 0.00004319 | 105.651 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000864 | 21.13 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Other - (non-hazardous) | NA | 70 | 0.0480505 | 117552 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0205931 | 50379.3 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 9.63272 | 23,565,700.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | ||||
2016-05-06 | H2O | 15 | 13154 Bbl | 540500 | Universal Well Services Inc. | STAGE 50/50
60 SHOTS |
2016-04-06 | H2O | 15 | 13206 Bbl | 491400 | Universal Well Services Inc. | STAGE 1/50
60 SHOTS STAGES 2-49 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | 1799337 | 0 | 166 |
2017 | XTO ENERGY INC. | 3225296 | 0 | 307 |
2018 | XTO ENERGY INC. | 3634080 | 0 | 361 |
2019 | XTO ENERGY INC. | 456054 | 0 | 57 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | Brine | 19621 | 166 |
2017 | XTO ENERGY INC. | Brine | 34978 | 307 |
2018 | XTO ENERGY INC. | Brine | 44606 | 361 |
2019 | XTO ENERGY INC. | Brine | 5504 | 57 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-109992937 | 2015-9-9 0:00:0 | DD | No Violations | 1.00 |
-1608824594 | 2015-8-17 0:00: | CS | No Violations | 4.00 |
-425112341 | 2018-12-4 0:00: | PW | No Violations | 0.50 |
-91463685 | 2018-8-23 0:00: | PW | No Violations | 0.80 |
0091463685 | 2018-08-23 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was currently using flow back equipment including a sand trap and choke manifold system, the sand trap was connected to 1 500-barrel mobile fluid storage tanks. The well head was equipped with 5.5-inch diameter production casing that appeared to be open flowing. Annular pressure monitoring was in place but had no digital readouts available for reference, there were annular pressure bleed down lines on both the 9.625-inch diameter casing, and 13.375-inch diameter casing, at the time of my inspection the 9.625-inch diameter casing valve was closed, and the 13.375-inch diameter casing valve was open and flowing through a choke manifold. Production equipment included a gas processing unit and 4 400-barrel production fluid tanks that were shared with the other wells on the pad. There was secondary containment around the production fluid tanks and gas processing units. Identification tags were present, and production reports were current. |
0109992937 | 2015-09-09 | Drill / Deepen / Reopen | No Violations | On this day a bond log was ran by the company to ensure a good cement bond from the preceding cement job. Following the bond log evaluation it was confirmed that the casing string appeared to yield a competent cement bond and drilling operations resumed. |
0323496957 | 2016-01-25 | Drill / Deepen / Reopen | No Violations | On this day there was not activity on the site. This well is drilled. There is no production equipment currently on this site. Site appeared to be in satisfactory condition. |
0425112341 | 2018-12-04 | Production Wells | No Violations | On 12/04/2018 I visited the site with Inspector Ryan Armstrong. The inspection purpose was to conduct an Urban Pre Site inspection due to the company proposing (2) additional wells on the pad. Upon inspection (2) producing wells were found. The well pad was constructed as a post construction rule pad and one material modification was found on file addressing an earthen slip on the outward South East facing slope. The well pad is not equipped with a perimeter boundary earthen berm. There is a gate across the lease road access point. The urban waivers pertaining to the (2) additional wells on the pad have been waived. |
1390158835 | 2020-4-16 0:00: | PL | No Violations | 0.20 |
1543960155 | 2018-12-04 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was currently using flow back equipment including a sand trap and choke manifold system, the sand trap was connected to 1 500-barrel mobile fluid storage tanks. The well head was equipped with 5.5-inch diameter production casing, and 2.875-inch diameter tubing that appeared to be open flowing. Annular pressure monitoring was in place but had no digital readouts available for reference, there were annular pressure bleed down lines on both the 9.625-inch diameter casing, and 13.375-inch diameter casing, at the time of my inspection the 9.625-inch diameter casing valve was closed, and the 13.375-inch diameter casing valve was open and flowing through a choke manifold. Production equipment included a gas processing unit and 4 400-barrel production fluid tanks that were shared with the other wells on the pad. There was secondary containment around the production fluid tanks and gas processing units. There was a midstream valve site on the north side of the pad west of the lease road. Identification tags were present, and production reports were current. |
1563876015 | 2017-08-24 | Production Wells | No Violations | This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing without any artificial lift technology present at this time. The well is piped to sand separator and a gas processing unit and then to a production area and to sales. The production area contains four 400-barrel production fluid holding tanks. Production records in RBDMS are current to 2017. |
1608824594 | 2015-08-17 | Casing String Witnessed | No Violations | On this day Lightning Energy had drilled the 36 open hole to a depth of 100. The 30 casing was ran and cemented. Allied Cementing was on site and pumped 275 sacks of Class A cement with cement to surface established. See cement ticket for details. |
323496957 | 2016-1-25 0:00: | DD | No Violations | 1.00 |
For data sources see[10]