34-013-21013

Well Details

Well ID: 34-013-21013
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: York Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001342
Farm/Lease Name: CHARLIE 210472
License Status: Producing
License Date: 2016-03-01
Spud Date: 2016-03-08
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2016-05-19
Well Total Depth: 18715.00 ft
Configuration: Horizontal
Latitude: 39.870000
Longitude: -80.840000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-11-17 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/17/2015, Expired Date:11/16/2017 12:00:00 PM, Drilling unit acres:552.218, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2016-03-01 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:3/1/2016, Expired Date:3/1/2018 12:00:00 PM, Drilling unit acres:555.219, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2016-04-01 CHANGE IN CASING PROGRAM.
Reached Total Depth 2016-05-19
Correction to Well 2017-03-24 UPDATE TARGET/TAEKPOINT/ACREAGE PER AS-DRILLED PLAT-RC
Completion Report Received 2017-03-29
Record Last Modified 2017-10-23
Construction Permit Expires 2018-03-01

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-04-06 18426 18568 0
2017-04-06 10696 10840 0
18426 18568 0
10696 10840 0
10696 10840 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/03/2016 09/14/2016 9903 9,165,790.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FRA-409 Lubrizol Friction Reducer Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.0016088 1670.18
Copolymer of 2-propenamide Proprietary 30 0.024132 25052.7
Alkanolamide 93-83-4 2 0.0016088 1670.18
Other components below reportable levels Not Assigned 60 0.0482641 50105.4
Distillates (Petroleum), Hydrotreated Light 64742-47-8 20 0.016088 16701.8
Ammonium Chloride 12125-02-9 1 0.000804401 835.09
Water Gulfport Energy Corporation Carrier/Base Fluid Water 7732-18-5 100 88.0432 91,402,200.0
B2512 Moon Chemical Biocide Quaternary Ammonium Compounds,

Benzyl-C12-C16-alkyldimethyl, Chlorides

68424-85-1 9 0.00317733 3298.55
Water 7732-18-5 49 0.0172988 17958.8
Ethanol 64-17-5 4 0.00141215 1466.02
Didecyl dimethyl ammonium chloride 68424-85-1 9 0.00317733 3298.55
Glutaraldehyde 111-30-8 29 0.0102381 10628.7
Hydrochloric Acid (28%) Oxy Acidizing Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.0589742 61224.2
Water 7732-18-5 64 0.104843 108843
Sand (40/70 Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 10.7343 11,143,800.0
Sand (100 Mesh Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 0.940441 976320
SI-04 Moon Chemical Scale Inhibitor Phosphinocarboxylic Acid 110224-99-2 9 0.000139202 144.513
Water 7732-18-5 91 0.00140749 1461.19
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Coconut oil acid diethanolamine 68603-42-9 5 0.00004998 51.883
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00004998 51.883
Acetic acid 64-19-7 65 0.000649686 674.473
2-Propyn-1-ol 107-19-7 5 0.00004998 51.883
Fatty acids, tall oil 61790-12-3 5 0.00004998 51.883
Methanol 67-56-1 35 0.000349831 363.178
Olefin Proprietary 5 0.00004998 51.883
2-Ethylhexanol 104-76-7 10 0.00009995 103.765

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-09-14 H2O 15 220710 Gal 274800 STINGRAY PRESSURE PUMPING LLC STAGE 44 OF 44-SEE IMAGES FOR STAGES 2-43
2016-09-03 H2O 15 221046 Gal 275620 STINGRAY PRESSURE PUMPING LLC STAGE 1 OF 44

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION 517411 0 34
2017 GULFPORT ENERGY CORPORATION 4431512 0 364
2018 GULFPORT ENERGY CORPORATION 1376254 1 356
2019 GULFPORT ENERGY CORPORATION 208260 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION Brine 6356 34
2017 GULFPORT ENERGY CORPORATION Brine 21245 364
2018 GULFPORT ENERGY CORPORATION Brine 6222 356
2019 GULFPORT ENERGY CORPORATION Brine 983 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1457897965 2019-12-19 0:00 PW No Violations 0.20
-1610991481 2016-1-21 0:00: SC No Violations 1.00
-510809230 2019-12-23 0:00 PW No Violations 1.00
0778946459 2018-07-31 Preliminary Restoration No Violations Preliminary restoration status check inspection found the area affected by the well pad construction has erosion control in place and vegetation established, the well pad surface and lease road are of stone construction and are in good repair. The entry point of the well pad is gated and locked with proper well site identification posted at the entry point of the lease road. There is an earthen berm established around the well pad and the company is controlling any collected surface water from rain events. There are a total of 6 wells on the pad that are in production at this time. The company has emergency shut down master control buttons and fire extinguishers place at all critical points on the well pad. The well head assembly consists of a lower B section and upper A section along with a production tree assembly. There are riser pipes with valves and manual pressure gauges attached to the A & B section that is allowing the company to monitor annular pressure. The pressure on the A section which monitors the pressure between the 13.375 diameter surface casing and 9.625 diameter intermediate casing string is currently 200 pounds per square inch (psi) and the pressure on the B section which is the pressure between the 5.5 diameter production casing and the 9.625 diameter intermediate casing is zero pressure. The 5.5 diameter production casing internal working pressure is 800 psi and the production flowline pressure is 600 psi. There is an emergency shut down master control device on the production flowline downstream from the production tree manual control valves. There is a total of 6 gas processing units on the well pad one for each well. On the back right hand corner of the well pad is the production fluid storage tank farm consisting of (4) steel construction 400 barrel tanks situated inside a polymer lined steel containment dike area. The company was notified that the permit numbers posted on the # 1 though # 4 well heads were incorrect.
1204046627 2018-03-29 Production Wells No Violations The well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit. From there, it is routed to a production area that contains four 400-barrel production fluid holding tanks. Annular pressures read on the gauges provided appeared to be 200 pounds on between the outside of the 9.625-inch diameter casing and the inside of the 13.375-inch diameter casing and 0 pounds between the outside of the 5.5-inch diameter casing and the inside of the 9.625-inch diameter casing. The production records within RBDMS are currently updated to 2017.
1462290701 2016-05-02 Casing String Witnessed No Violations
1533157476 2016-01-19 Surface Facility Construction No Violations On this day I was accompanied by Inspector Jim Nicholson. Jim and I were reviewing the slip area that is to be remediated. There was a track hoe working large rocks into the slip area for stabilization. Operations on this pad are on hold until the slip area is approved by the engineering section.
1610991481 2016-01-21 Surface Facility Construction No Violations On this day I was accompanied by Emergency Responder Josh S. Josh and I were reviewing the slip area that is to be remediated. There was a track hoe working large rocks into the slip area for stabilization. Operations on this pad are on hold until the slip area is approved by the engineering section.
1633010474 2020-10-27 0:00 PW No Violations 0.20
1840027777 2020-5-28 0:00: PW No Violations 0.10
2033275072 2016-03-01 Casing String Witnessed No Violations On this day Rocky Mountain had reached a total depth of 110 with the 32 auger bit. The 26 casing was ran and cemented by Stingray Cementing using 290 sack of Class A cement. Cement returns to surface were successful.
778946459 2018-7-31 0:00: PL No Violations 0.20

For data sources see[10]