If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21019 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.96,"lon":-80.84,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Mead Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-001341 | |
Farm/Lease Name: KRNYAICH UNIT C | |
License Status: Producing | |
License Date: 2015-12-17 | |
Spud Date: 2015-11-28 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2016-03-05 | |
Well Total Depth: 22775.00 ft | |
Configuration: Horizontal | |
Latitude: 39.960000 | |
Longitude: -80.840000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-11-23 | Proposed Formations:TRENTON, Issued Date:11/23/2015, Expired Date:11/22/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2015-12-17 | Proposed Formations:POINT PLEASANT, Issued Date:12/17/2015, Expired Date:12/16/2017 12:00:00 PM, Drilling unit acres:307.6391, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-03-05 | |
Correction to Well | 2016-05-06 | CHANGE IN TARGET/TAKEPOINT PER AS DRILLED-ALE |
Completion Report Received | 2017-02-22 | |
Record Last Modified | 2017-10-23 | |
Construction Permit Expires | 2017-12-16 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-02-23 | 10810 | 22082 | 0 |
10810 | 22082 | 0 | |
10810 | 22082 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/23/2016 | 10/24/2016 | 10233 | 23,756,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 92.4768 | 197,890,000.0 | |
WG-36 GELLING AGENT | Halliburton | Gelling Agent | Listed Below | Listed Below | 0 | 0 | 0 | |
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002233 | 48 | ||||
Inorganic salt | Proprietary | 30 | 0.0247373 | 52935 | ||||
Neutralized Polyacrylic Emulsion | Proprietary | 10 | 0.00241509 | 5169 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 6.60162 | 14,126,700.0 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.000184589 | 395 | ||||
Ethylene Glycol | 107-21-1 | 60 | 0.0144905 | 31009 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00669897 | 14336 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.0011165 | 2390 | ||||
Guar gum | 9000-30-0 | 100 | 0.0163224 | 34929 | ||||
Acrylamide acrylate copolymer | Proprietary | 30 | 0.0247373 | 52935 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000175564 | 376 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000175564 | 376 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0247373 | 52935 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000175564 | 376 | ||||
Ethanol | 64-17-5 | 1 | 0.000223299 | 478 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00005852 | 126 | ||||
Methanol | 67-56-1 | 60 | 0.00038239 | 819 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000018 | 1 | ||||
Olefins | Proprietary | 5 | 0.00007023 | 152 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.116332 | 248937 | ||||
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.858046 | 1,836,120.0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE-100 MESH, SSA-2, 100 LB SACK (100002158) | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Scalechek LP-70 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-76 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-10-23 | H2O | 15 | 14076 Bbl | 511833 | Halliburton | STAGE 44/44
60 SHOTS |
2016-09-24 | H2O | 15 | 12840 Bbl | 388325 | Halliburton | STAGE 3/44
60 SHOTS STAGES 4-43 SEE IMAGES STAGES 1-2 SKIPPED |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | 28721 | 0 | 12 |
2017 | XTO ENERGY INC. | 3084105 | 0 | 310 |
2018 | XTO ENERGY INC. | 2178401 | 0 | 214 |
2019 | XTO ENERGY INC. | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | Brine | 1835 | 12 |
2017 | XTO ENERGY INC. | Brine | 36431 | 310 |
2018 | XTO ENERGY INC. | Brine | 21910 | 214 |
2019 | XTO ENERGY INC. | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1495332731 | 2017-6-7 0:00:0 | CT | No Violations | 0.50 |
-1522266035 | 2016-1-4 0:00:0 | CS | No Violations | 8.00 |
-1641080202 | 2016-1-26 0:00: | PL | No Violations | 1.00 |
-2054409421 | 2016-2-17 0:00: | CS | No Violations | 8.50 |
-722024686 | 2020-4-16 0:00: | PW | No Violations | 0.20 |
0093208511 | 2015-11-28 | Casing String Witnessed | No Violations | |
1495332731 | 2017-06-07 | Completion Testing | No Violations | On the day of my inspection the well appeared to be in the flow back phase. The well was connected to a sand separator and a 500 barrel fluid holding tank. The tank battery consisted of five 400 barrel production fluid holding tanks and gas processing units. |
1522266035 | 2016-01-04 | Casing String Witnessed | No Violations | On this day Nomac Rig # 79 had reach a total depth of 2375. The 13.375 casing was ran and cemented into a 17.5 open hole. Bow spring centralizers were utilized to ensure proper standoff from the well bore. C&J Cementing Company was on site to cement the casing with 1655 sacks of Class H cement. Cement additives included bentonite gel, 2% CaCl, and .25# flake per sack of Celluseal. Circulation of the well bore was achieved and cement to surface was established. |
1547579744 | 2019-01-15 | Production Wells | No Violations | Status check inspection found the said well currently shut in with a Back Pressure valve in the tubing hanger and VR plugs in both B section 2 outlet ports. The well is equipped with a master valve with no production tree or flow line present or attached. The company man on site Rich Lightner indicated the company had lost 2.375 coil tubing in the well bore and cut the tubing off down hole in the directional curve section. The well was produced this way with the intention of allowing the well to sell down until the casing pressure subsides to a point to retrieve the coil tubing. (4) additional valves have been drilled and are scheduled to have the stimulation process begin in the next 14 days. |
1561881172 | 2018-08-01 | Production Wells | No Violations | On the day of my inspection I witnessed that KLX energy, Starett Energy Services, and Shale Pro were currently on location. After speaking with Matt Thomas, Completions Foreman for XTO Energy he informed me that they had set a retrievable plug at 4997 feet and had left coil tubing in the hole at that depth. Matt informed me that they plan to continue to release pressure on top of the retrievable plug they plan to set a Valve Removal plug on the B Section of the well bore. There will be a 2 way check valve installed at the tubing hanger. Matt informed me that once SIMOPS was completed they will be covering the wellheads with steel cages. XTO Energy plans to move the Auger rig on to set cellars and conductors on 8/2/2018. |
1641080202 | 2016-01-26 | Preliminary Restoration | No Violations | On this day I was on site to witness a casing job. During my visit I reviewed the sites preliminary restoration efforts. The site was appeared to be in satisfactory condition with proper erosion and sediment controls in place. This sites preliminary restoration is passed. |
2054409421 | 2016-02-17 | Casing String Witnessed | No Violations | |
235073975 | 2019-8-27 0:00: | PW | No Violations | 0.20 |
93208511 | 2015-11-28 0:00 | CS | No Violations | 4.00 |
For data sources see[10]