Well Details

Well ID: 34-013-21099
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Richland Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001399
Farm/Lease Name: EARLEY- ROSE CLR BL
License Status: Producing
License Date: 2016-09-19
Spud Date: 2018-02-17
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-03-09
Well Total Depth: 20482.00 ft
Configuration: Horizontal
Latitude: 40.090000
Longitude: -80.840000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-09-19 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/19/2016, Expired Date:9/19/2018 12:00:00 PM, Drilling unit acres:702.438, Proposed Well Type:OG, Proposed Well Class:FWC
Construction Permit Expires 2017-09-19
Reached Total Depth 2018-03-09
Completion Report Received 2018-10-10
Record Last Modified 2018-10-17

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-16 9776 9917 0
2018-10-16 20211 20315 0
9776 9917 0
20211 20315 0
9776 9917 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/27/2018 07/05/2018 9564 19,439,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Ascent Carrier/Base Fluid Water 7732-18-5 100 87.7075 162,224,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Alcohols, ethoxylated 68002-97-1 5 0.00258685 4784.64
DETA phosphonate 15827-60-8 5 0.00215666 3988.97
Hydroxyacetic acid 79-14-1 5 0.000173713 321.299
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00215666 3988.97
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000262247 485.053
Methanol 67-56-1 5 0.00002622 48.505
Water 7732-18-5 44.3 0.00423009 7823.98
Alcohols, ethoxylated 68439-50-9 5 0.00258685 4784.64
Thiourea 62-56-6 1 0.00000524 9.701
Alcohols, ethoxylated 68551-12-2 5 0.00258685 4784.64
Polyethylene glycol 7732-18-5 50 0.00477437 8830.68
Ammonium acetate 631-61-8 13 0.0067258 12440.1
Ethylene glycol 107-21-1 20 0.00069485 1285.2
Formaldehyde 50-00-0 1 0.00000524 9.701
Unislick ST50 UPP Friction reducer Ammonium acetate 631-61-8 13 0.0067258 12440.1
Alcohols, ethoxylated 68551-12-2 5 0.00258685 4784.64
Alcohols, ethoxylated 68439-50-9 5 0.00258685 4784.64
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0155211 28707.8
Alcohols, ethoxylated 68002-97-1 5 0.00258685 4784.64
Unihib G UPP Acid inhibitor Thiourea 62-56-6 1 0.00000524 9.701
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000262247 485.053
Methanol 67-56-1 5 0.00002622 48.505
Formaldehyde 50-00-0 1 0.00000524 9.701
Butyl diglycol 112-34-5 75 0.000393371 727.58
HCL Acid (7.5%) UPP Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0499479 92383.7
Scale Inhibitor E UPP Scale Inhibitor DETA phosphonate 15827-60-8 5 0.00215666 3988.97
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00215666 3988.97
Copolymer of Maleic and Acrylic Acid 52255-49-9 20 0.00862665 15955.9
K-Bac 1005 UPP Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.8 0.000550007 1017.29
Water 7732-18-5 44.3 0.00423009 7823.98
Polyethylene glycol 7732-18-5 50 0.00477437 8830.68
I-7L UPP Iron Control Ethylene glycol 107-21-1 20 0.00069485 1285.2
Hydroxyacetic acid 79-14-1 5 0.000173713 321.299
Ammonium glycolate 35249-89-9 20 0.00069485 1285.2
Sand UPP Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 11.5066 21,282,700.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-05-20 H2O 15 7591 Bbl 349129 Universal Well Services Inc. STAGE 1/61

STAGES 2-60 SEE IMAGES

2018-06-25 H2O 15 7053 Bbl 370448 Universal Well Services Inc. STAGE 61/61

STAGES 2-60 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 3950873 0 149
2019 ASCENT RESOURCES UTICA LLC 1811784 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 28388 149
2019 ASCENT RESOURCES UTICA LLC Brine 10058 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1092211502 2018-9-27 0:00: PW No Violations 0.80
-1297510823 2016-12-4 0:00: CS No Violations 14.00
-1299596840 2018-2-27 0:00: DD No Violations 1.00
-518946368 2020-7-23 0:00: PW No Violations 0.20
0718529714 2018-08-23 UrbanProduction Wells No Violations Status check inspection found the well pad perimeter protected by an 8 chain link fence with signage posted at the lease road and well pad entry points. The lease road and well pad surface are of stone surface construction. There are 5 producing wells on this pad and one well that was spudded and not complete. The said well is equipped with a lower A and upper B section with 2 diameter riser pipes equipped with valves and gauges attached to both sections to monitor annular pressures. The A section gauge which reads between the 9.625 and 13.375 diameter casing strings shows 675 pounds on the gauge. The B section which reads between the 5.5 and 9.625 diameter casing strings reads 804 pounds on the gauge. The 5.5 diameter casing internal pressure is 4,828 pounds pressure. The well is selling off the 5.5 production casing through dual flow lines with 1,884 and 1,476 pounds pressure present on each flow line gauge. The well head completion stack does have multiple surface safety and manual shut down valves in place on the production tree, also (2) manually operated 7.0625 master valves are still present on top of the B section. Addressing the production equipment present- there is 3 line heaters and 5 gas processing units on location. Also present is a production fluid storage area consisting of (2) steel construction 500 barrel fluid volume tanks situated inside a polymer lines steel containment dike area. The well pad is protected by an earthen berm and the drain valves are in the closed position.
1024366398 2018-01-24 Casing String Witnessed No Violations On the day of my inspection I witnessed Precision Rathole had augured a 36 inch diameter hole to 100 feet. 100 feet of 30 inch diameter conductor casing was run. O-tex was onsite with 515 sacks of class H cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 85% percent excess ran. Cement was displaced with 70 barrels of fresh water. 27 barrels of cement returned to surface.
1092211502 2018-09-27 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.875-inch diameter tubing that appeared to be open flowing. The well was still equipped with the completion stack, with 2 manual master valves. Annular pressure monitoring was in place the 9.625-inch diameter intermediate casing gauge read 1015 pounds per square inch, the 13.375-inch diameter surface casing gauge read 5 pounds per square inch. Production equipment included 2 Sand Traps, a line heater, and Gas Processing Unit. There were also 2- 500-barrel steel production fluid tanks inside secondary containment, that were shared with the rest of the producing wells on the pad. There were multiple Emergency Shutoff Devices on location, Identification tags were present, and production was current in RBDMS.
1297510823 2016-12-04 Casing String Witnessed No Violations I am on site today to witness the cementing of the 13.375 inch diameter surface casing. Patterson Rig No 292 drilled a 17.5 inch diameter hole to a depth of 1258 feet then proceeded to run 1248 feet of 13.375 inch diameter, 61 pound per foot casing, placing the cement float at a depth of 1204 feet. O-Tex Cementing is the cement contractor on site. O-tex pumped 35 barrels of gel, 10 barrels of water and then pumped 1220 sacks of Class H 15.6 pound per gallon and 1.2 yield percent. After pumping cement O-Tex then displaced with 183 barrels of fresh water. After displacement the plug was landed and pressure tested to 1100 psi and I witness the casing holding integrity for 5 minutes. Over the duration of my inspection I witnessed 5 barrels of good cement returns to surface. The job was delayed for multiple hours due technical issues with the pump truck.
1299596840 2018-02-27 Drill / Deepen / Reopen No Violations Patterson 284 had reached total depth in the 12.25-inch diameter section of the well bore at 8728 feet. They were currently running their 9.625-inch diameter casing into the well bore. Once the casing run is completed Schlumberger will cement the casing into the well bore.
718529714 2018-8-23 0:00: UP No Violations 0.40
926083326 2020-2-6 0:00:0 PL No Violations 0.30

For data sources see[10]

References