X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21107

Well Details

Well ID: 34-013-21107
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Richland Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001407
Farm/Lease Name: SNODGRASS 210010
License Status: Producing
License Date: 2016-10-25
Spud Date: 2016-11-01
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2017-01-15
Well Total Depth: 19350.00 ft
Configuration: Horizontal
Latitude: 40.040000
Longitude: -80.850000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-10-25 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/25/2016, Expired Date:10/25/2018 12:00:00 PM, Drilling unit acres:458.46, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-01-15
Completion Report Received 2017-09-15
Correction to Well 2017-10-17 UPDATE TARGET/TAKE/ACREAGE PER AS-DRILLED
Record Last Modified 2017-10-23
Construction Permit Expires 2017-10-25

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-09-18 10135 10279 50
2017-09-18 17392 17545 40
17392 17545 40
10135 10279 50
10135 10279 50

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/04/2017 04/05/2017 9823 19,989,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Gulfport Energy Carrier/Base Fluid Water 7732-18-5 100 86.5905 166,812,000.0
Bio B2512 Lubrizol Biocide Water 7732-18-5 90 0.03147 60625.4
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 10 0.00349667 6736.15
Sand (40/70 White Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 11.8466 22,821,800.0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 70 0.0680395 131074
Coconut oil acid diethanolamine 68603-42-9 5 0.00003281 63.201
Fatty acids, tall oil 61790-12-3 5 0.00003281 63.201
Olefin Proprietary 5 0.00003281 63.201
2-Ethylhexanol 104-76-7 10 0.00006561 126.402
Methanol 67-56-1 35 0.000229649 442.406
Water 7732-18-5 55 0.00872922 16816.4
2-Propyn-1-ol 107-19-7 5 0.00003281 63.201
Water 7732-18-5 64 0.0676339 130293
Water 7732-18-5 90 0.03147 60625.4
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00003281 63.201
FRA-409 Lubrizol Friction Reducer Water 7732-18-5 70 0.0680395 131074
Distillates, Petroleum, Hydrotreated Light 64742-47-8 30 0.0291598 56174.8
Sand (100 Mesh Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 1.3085 2,520,760.0
SI-20W Stingray Pressure Pumping, LLC Scale Inhibitor Phosphinocarboxylic Acid 110224-99-2 45 0.00714209 13758.9
Water 7732-18-5 55 0.00872922 16816.4
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Olefin Proprietary 5 0.00003281 63.201
2-Ethylhexanol 104-76-7 10 0.00006561 126.402
Methanol 67-56-1 35 0.000229649 442.406
Coconut oil acid diethanolamine 68603-42-9 5 0.00003281 63.201
Fatty acids, tall oil 61790-12-3 5 0.00003281 63.201
Acetic acid 64-19-7 65 0.00042649 821.611
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00003281 63.201
2-Propyn-1-ol 107-19-7 5 0.00003281 63.201
Hydrochloric Acid (28%) Oxy Acidizing Water 7732-18-5 64 0.0676339 130293
Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.0380441 73290

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-03-04 H2O 15 362586 Gal 500640 Frac Tech Services STAGE 1/51

STAGES 2-50 SEE IMAGES

2017-04-05 H2O 15 373464 Gal 491900 Frac Tech Services STAGE 51/51

STAGES 2-50 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 GULFPORT ENERGY CORPORATION 3103911 0 207
2018 GULFPORT ENERGY CORPORATION 4285727 0 363
2019 GULFPORT ENERGY CORPORATION 526074 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 GULFPORT ENERGY CORPORATION Brine 21798 207
2018 GULFPORT ENERGY CORPORATION Brine 20997 363
2019 GULFPORT ENERGY CORPORATION Brine 2709 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-110418567 2018-2-6 0:00:0 UP No Violations 0.50
-1427519933 2020-1-29 0:00: PW No Violations 0.20
-1615884708 2016-12-26 0:00 CS No Violations 1.00
-463340224 2020-10-22 0:00 PW No Violations 0.20
-755692566 2016-12-29 0:00 CS No Violations 1.00
0110418567 2018-02-06 UrbanProduction Wells No Violations A follow up inspection conducted to check on the status of the fencing that was to be installed. The pad area is now enclosed with chain linked fence that is gated and locked. This well is equipped with 5.5-inch diameter production casing. The well is free flowing as it does not appear to have any artificial lift technology present at this time. The well is piped to a gas processing unit and then to a production area. The production area contains four 400-barrel production fluid holding tanks. The production records within RBDMS are current to 2017.
0706417048 2017-08-22 Production Wells No Violations This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing without any artificial lift technology present at this time. The well is piped to a gas processing unit and then to a production area and to sales. The production area contains four 400-barrel production fluid holding tanks. Production records in RBDMS are not updated yet however the well had the sound of gas flowing and was equipped in a manner to be considered capable of production.
0755692566 2016-12-29 Casing String Witnessed No Violations

-Tex cemented the casing with 1570 sacks of Class H cement with cement returns to surface established.

0853818629 2016-11-03 Drill / Deepen / Reopen No Violations HAD drilling is drilling the conductors on this pad. They are utilizing the casing while drilling method so no cement job will take place on this section.
1483629479 2017-01-05 Casing String Witnessed No Violations

-Tex cementing will complete the cementing of the casing.

1489258474 2017-01-17 Drill / Deepen / Reopen No Violations
1615884708 2016-12-26 Casing String Witnessed No Violations

-Tex cementing secured the shoe in place with 580 sacks of Class H cement. The cement was then topped off on the backside from the packer to surface. Cement returns to surface were established.

706417048 2017-8-22 0:00: PW No Violations 0.50
853818629 2016-11-3 0:00: DD No Violations 1.00

For data sources see[10]

References