X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21420

Well Details

Well ID: 34-013-21420
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Richland Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001575
Farm/Lease Name: BIG TEX
License Status: Producing
License Date: 2019-05-21
Spud Date: 2019-06-03
Spud Drilling Contractor:
Final Drill Date: 2019-11-25
Well Total Depth: 21868.00 ft
Configuration: Horizontal
Latitude: 40.040000
Longitude: -80.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2019-05-21 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:5/21/2019, Expired Date:5/20/2020, Drilling unit acres:512.51, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2019-05-28
Construction Permit Expires 2020-05-20

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
10123 21775 0
10123 21775 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1209517 2019-11-15 0:00 DD No Violations 0.20
-1370030593 2020-6-3 0:00:0 CT No Violations 0.30
-1568767726 2020-6-5 0:00:0 CT No Violations 3.00
-1713696384 2019-7-2 0:00:0 DD No Violations 0.10
-2143367452 2020-6-9 0:00:0 CT No Violations
-397488569 2019-6-3 0:00:0 DD No Violations 1.00
-734778965 2019-11-22 0:00 DD No Violations 0.50
0397488569 2019-06-03 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed the Cellar Tech was currently on location and drilling a 36-inch diameter conductor well bore at 15 feet. After speaking with EQT representative AJ Roner he informed me that they intend to drill to 100 feet and set the 30-inch diameter conductor. AJ believes that they should be cementing on 6/4/2019 sometime in the afternoon. At the time of my inspection the sound wall construction had been completed and there were six 500-barrel horizontal steel production fluid storage tanks on location, and 3 of the 30-inch diameter conductors on the pad have been set and cemented in place.
1035086502 2020-6-2 0:00:0 CT No Violations 1.40
1355858004 2019-8-1 0:00:0 CS No Violations 8.50
1564659839 2019-7-30 0:00: DD No Violations 7.70
1564968577 2019-8-1 0:00:0 CS No Violations 5.00
1565179378 2019-8-7 0:00:0 DD No Violations 0.50
308108656 2019-8-7 0:00:0 CS No Violations 1.70
407563560 2020-6-16 0:00: CT No Violations 1.50
677768407 2020-7-8 0:00:0 PW No Violations 0.40

For data sources see[4]

References