X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22411

Well Details

Well ID: 34-019-22411
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Washington Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-000707
Farm/Lease Name: OCEL
License Status: Producing
License Date: 2013-09-03
Spud Date: 2013-07-18
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2013-09-17
Well Total Depth: 12528.00 ft
Configuration: Horizontal
Latitude: 40.620000
Longitude: -80.980000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-02 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:5/2/2013, Expired Date:5/2/2015 12:00:00 PM, Drilling unit acres:314.03, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-08-09 CHANGE IN WELL NUMBER PER OWNER REQUEST.
APP 2013-09-03 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/3/2013, Expired Date:9/3/2015 12:00:00 PM, Drilling unit acres:314.03, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-09-06 CORRECTION TO TARGET Y COORDINATE.
Reached Total Depth 2013-09-17
Correction to Well 2013-12-06 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2014-06-12
Correction to Well 2014-06-20 CORRECTION TO Y COORDINATE (SURFACE).
Construction Permit Expires 2015-09-03
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Record Last Modified 2018-10-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-02-28 8258 12308 0
8258 12308 0
8258 12308 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/15/2014 02/09/2014 7798 182011

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand Vertex Proppant Silica Sand 14808-60-7 100 10.2765 0
EC6116A Nalco Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00841 0
Dibromoacetonitrile 3252-43-5 5 0.0014 0
Polyethylene Glycol 25322-68-3 60 0.01682 0
Water Rex Base Fluid Water 7732-18-5 100 88.0535 0
WGA-7 SLR Universal Gel Surfactant 154518-36-2 5 0.00116 0
Clay 14808-60-7 5 0.00116 0
Petroleum Distillate 64742-47-8 55 0.01275 0
Guar Gum 9000-30-0 50 0.01159 0
AP Breaker Universal Gell Breaker Ammonium Persulfate 7727-54-0 100 0.02318 0
Unihib G Geosafe Acid Inhibitor Short Chained Glycol Ether 112-34-5 50 0.00024 0
Proprietary Blend Surfactants Proprietary 35 0.00017 0
Ethoxylated Alcohol Proprietary 35 0.00017 0
Hydrochloric Acid (7.5%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 7.5 0.11211 0
ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00673 0
TEA Breaker Activator Universal Gell Breaker Diethanolamine 111-42-2 13 0.00301 0
Triethanolamine 102-71-6 72.5 0.0168 0
Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.02971 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-02-02 H2O 8 0 0 Universal Well Services Inc. STAGE 20

60 SHOTS

2014-01-26 H2O 8 0 0 Universal Well Services Inc. STAGE 13

60 SHOTS

2014-02-01 H2O 8 0 0 Universal Well Services Inc. STAGE 18

60 SHOTS

2014-01-19 H2O 8 0 0 Universal Well Services Inc. STAGE 7

60 SHOTS

2014-01-18 H2O 11 0 0 Universal Well Services Inc. STAGE 6

60 SHOTS

2014-01-21 H2O 8 0 0 Universal Well Services Inc. STAGE 10

60 SHOTS

2020-02-19 H2O 8 0 0 Universal Well Services Inc. STAGE 1

60 SHOTS

2014-01-17 H2O 8 0 0 Universal Well Services Inc. STAGE 5

60 SHOTS

2014-02-03 H2O 8 0 0 Universal Well Services Inc. STAGE 22

60 SHOTS

2014-01-26 H2O 8 0 0 Universal Well Services Inc. STAGE 12

60 SHOTS

2014-02-05 H2O 8 0 0 Universal Well Services Inc. STAGE 23

60 SHOTS

2014-01-16 H2O 8 0 0 Universal Well Services Inc. STAGE 4

60 SHOTS

2014-01-27 H2O 8 0 0 Universal Well Services Inc. STAGE 14

60 SHOTS

2014-01-15 H2O 8 0 0 Universal Well Services Inc. STAGE 2

60 SHOTS

2014-01-30 H2O 8 0 0 Universal Well Services Inc. STAGE 16

60 SHOTS

2014-02-08 H2O 8 0 Bbl 0 Universal Well Services Inc. STAGE 29

60 SHOTS

2014-02-06 H2O 8 0 0 Universal Well Services Inc. STAGE 25

60 SHOTS

2014-02-08 H2O 8 0 0 Universal Well Services Inc. STAGE 28

60 SHOTS

2014-01-25 H2O 8 0 0 Universal Well Services Inc. STAGE 11

60 SHOTS

2014-02-07 H2O 8 0 0 Universal Well Services Inc. STAGE 27

60 SHOTS

2014-01-19 H2O 8 0 0 Universal Well Services Inc. STAGE 8

60 SHOTS

2004-01-31 H2O 8 0 0 Universal Well Services Inc. STAGE 17

60 SHOTS

2014-01-20 H2O 8 0 0 Universal Well Services Inc. STAGE 9

60 SHOTS

2014-01-16 H2O 8 0 0 Universal Well Services Inc. STAGE 3

60 SHOTS

2014-01-29 H2O 8 0 0 Universal Well Services Inc. STAGE 15

60 SHOTS

2014-02-06 H2O 8 0 0 Universal Well Services Inc. STAGE 26

60 SHOTS

2014-02-05 H2O 8 0 0 Universal Well Services Inc. STAGE 24

60 SHOTS

2014-02-01 H2O 8 0 0 Universal Well Services Inc. STAGE 19

60 SHOTS

2014-02-03 H2O 8 0 0 Universal Well Services Inc. STAGE 21

60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 R E GAS DEVELOPMENT LLC 584125 5028 286
2015 R E GAS DEVELOPMENT LLC 371859 1194 301
2016 R E GAS DEVELOPMENT LLC 290556 710 342
2017 R E GAS DEVELOPMENT LLC 203201 319 352
2018 PENNENERGY RESOURCES LLC 140328 1875 308
2019 PENNENERGY RESOURCES LLC 31607 65 86

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 R E GAS DEVELOPMENT LLC Brine 11074 286
2015 R E GAS DEVELOPMENT LLC Brine 5666 301
2016 R E GAS DEVELOPMENT LLC Brine 3649 342
2017 R E GAS DEVELOPMENT LLC Brine 2523 352
2018 PENNENERGY RESOURCES LLC Brine 1954 308
2019 PENNENERGY RESOURCES LLC Brine 293 86

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1300504663 2019-9-3 0:00:0 PW No Violations 1.00
-838018049 2018-6-20 0:00: PW No Violations 1.20
0838018049 2018-06-20 Production Wells No Violations

I conducted a status check of the well and production pad. Three wells are located on the pad (permit numbers 2412, 2411, 2131). This well is equipped with a plunger-lift assemly. Proper identification was posted at the well and lease entrance. The production tanks, gas processing units, and vertical separators were surrounded by a steel dike. The access road was stable and drivable. DOGRM inspector Michael Dinsmore observed slumping east of the well pad during an inspection in 2014. I located the historic slumping referenced in the inspection but found no indication of recent movement at the time of inspection and the area appeared stable. Equipment on the pad consisted of the following: Nine 400 bbl production tanks; six labelled as containing condensate and three as containing produced water One low-pressure vertical separator tower Three gas processing units Three vertical separators One combustor unit.

I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier and an annular gauge will be installed as soon as possible.

1378322484 2013-09-04 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 13 3/8 surface casing. I arrived on site and observed that they had two joints of casing left to run into the well bore. Franks Casing Crew had trouble getting one of the remaining joints of casing screwed together (kept crossthreading). Franks ran 1015.57 feet of casing set at 1012 feet from rig floor; 10 bowspriing centralizers were run on the casing string.. After the casing crew was rigged down and cementers were rigged up, a safety meeting was held prior to starting the cement job. Universal cemented the casing with 816 sacks of Type 1 (3% CaCl; 0.2%foam check; and 1/4 pound per sack flake. The cement had a density of 15.6 pounds per gallon, a yield of 1.2 cubic feet per sack, and they used 5.2 gallons of mix water per sack. Universal pumped 174 barrels of cement slurry, pumped 149 barrels of displacement, and got 38 barrels of cement returns to surface. My inspection revealed no violations at this time.
616740701 2020-4-2 0:00:0 PL No Violations 1.00

For data sources see[10]

References