If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22411 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.62,"lon":-80.98,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Washington Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: US-OH-000707 | |
Farm/Lease Name: OCEL | |
License Status: Producing | |
License Date: 2013-09-03 | |
Spud Date: 2013-07-18 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2013-09-17 | |
Well Total Depth: 12528.00 ft | |
Configuration: Horizontal | |
Latitude: 40.620000 | |
Longitude: -80.980000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-02 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:5/2/2013, Expired Date:5/2/2015 12:00:00 PM, Drilling unit acres:314.03, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2013-08-09 | CHANGE IN WELL NUMBER PER OWNER REQUEST. |
APP | 2013-09-03 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/3/2013, Expired Date:9/3/2015 12:00:00 PM, Drilling unit acres:314.03, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2013-09-06 | CORRECTION TO TARGET Y COORDINATE. |
Reached Total Depth | 2013-09-17 | |
Correction to Well | 2013-12-06 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2014-06-12 | |
Correction to Well | 2014-06-20 | CORRECTION TO Y COORDINATE (SURFACE). |
Construction Permit Expires | 2015-09-03 | |
Change of Owner | 2018-10-03 | Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC |
Record Last Modified | 2018-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-02-28 | 8258 | 12308 | 0 |
8258 | 12308 | 0 | |
8258 | 12308 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/15/2014 | 02/09/2014 | 7798 | 182011 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | Vertex | Proppant | Silica Sand | 14808-60-7 | 100 | 10.2765 | 0 |
EC6116A | Nalco | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00841 | 0 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.0014 | 0 | ||||
Polyethylene Glycol | 25322-68-3 | 60 | 0.01682 | 0 | ||||
Water | Rex | Base Fluid | Water | 7732-18-5 | 100 | 88.0535 | 0 | |
WGA-7 SLR | Universal | Gel | Surfactant | 154518-36-2 | 5 | 0.00116 | 0 | |
Clay | 14808-60-7 | 5 | 0.00116 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.01275 | 0 | ||||
Guar Gum | 9000-30-0 | 50 | 0.01159 | 0 | ||||
AP Breaker | Universal | Gell Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.02318 | 0 | |
Unihib G | Geosafe | Acid Inhibitor | Short Chained Glycol Ether | 112-34-5 | 50 | 0.00024 | 0 | |
Proprietary Blend Surfactants | Proprietary | 35 | 0.00017 | 0 | ||||
Ethoxylated Alcohol | Proprietary | 35 | 0.00017 | 0 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.11211 | 0 | |
ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00673 | 0 | |
TEA Breaker Activator | Universal | Gell Breaker | Diethanolamine | 111-42-2 | 13 | 0.00301 | 0 | |
Triethanolamine | 102-71-6 | 72.5 | 0.0168 | 0 | ||||
Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.02971 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-02-02 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 20
60 SHOTS |
2014-01-26 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 13
60 SHOTS |
2014-02-01 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 18
60 SHOTS |
2014-01-19 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 7
60 SHOTS |
2014-01-18 | H2O | 11 | 0 | 0 | Universal Well Services Inc. | STAGE 6
60 SHOTS |
2014-01-21 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 10
60 SHOTS |
2020-02-19 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 1
60 SHOTS |
2014-01-17 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 5
60 SHOTS |
2014-02-03 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 22
60 SHOTS |
2014-01-26 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 12
60 SHOTS |
2014-02-05 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 23
60 SHOTS |
2014-01-16 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 4
60 SHOTS |
2014-01-27 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 14
60 SHOTS |
2014-01-15 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 2
60 SHOTS |
2014-01-30 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 16
60 SHOTS |
2014-02-08 | H2O | 8 | 0 Bbl | 0 | Universal Well Services Inc. | STAGE 29
60 SHOTS |
2014-02-06 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 25
60 SHOTS |
2014-02-08 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 28
60 SHOTS |
2014-01-25 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 11
60 SHOTS |
2014-02-07 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 27
60 SHOTS |
2014-01-19 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 8
60 SHOTS |
2004-01-31 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 17
60 SHOTS |
2014-01-20 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 9
60 SHOTS |
2014-01-16 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 3
60 SHOTS |
2014-01-29 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 15
60 SHOTS |
2014-02-06 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 26
60 SHOTS |
2014-02-05 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 24
60 SHOTS |
2014-02-01 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 19
60 SHOTS |
2014-02-03 | H2O | 8 | 0 | 0 | Universal Well Services Inc. | STAGE 21
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | 584125 | 5028 | 286 |
2015 | R E GAS DEVELOPMENT LLC | 371859 | 1194 | 301 |
2016 | R E GAS DEVELOPMENT LLC | 290556 | 710 | 342 |
2017 | R E GAS DEVELOPMENT LLC | 203201 | 319 | 352 |
2018 | PENNENERGY RESOURCES LLC | 140328 | 1875 | 308 |
2019 | PENNENERGY RESOURCES LLC | 31607 | 65 | 86 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | Brine | 11074 | 286 |
2015 | R E GAS DEVELOPMENT LLC | Brine | 5666 | 301 |
2016 | R E GAS DEVELOPMENT LLC | Brine | 3649 | 342 |
2017 | R E GAS DEVELOPMENT LLC | Brine | 2523 | 352 |
2018 | PENNENERGY RESOURCES LLC | Brine | 1954 | 308 |
2019 | PENNENERGY RESOURCES LLC | Brine | 293 | 86 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1300504663 | 2019-9-3 0:00:0 | PW | No Violations | 1.00 |
-838018049 | 2018-6-20 0:00: | PW | No Violations | 1.20 |
0838018049 | 2018-06-20 | Production Wells | No Violations |
I conducted a status check of the well and production pad. Three wells are located on the pad (permit numbers 2412, 2411, 2131). This well is equipped with a plunger-lift assemly. Proper identification was posted at the well and lease entrance. The production tanks, gas processing units, and vertical separators were surrounded by a steel dike. The access road was stable and drivable. DOGRM inspector Michael Dinsmore observed slumping east of the well pad during an inspection in 2014. I located the historic slumping referenced in the inspection but found no indication of recent movement at the time of inspection and the area appeared stable. Equipment on the pad consisted of the following: Nine 400 bbl production tanks; six labelled as containing condensate and three as containing produced water One low-pressure vertical separator tower Three gas processing units Three vertical separators One combustor unit. I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier and an annular gauge will be installed as soon as possible. |
1378322484 | 2013-09-04 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 13 3/8 surface casing. I arrived on site and observed that they had two joints of casing left to run into the well bore. Franks Casing Crew had trouble getting one of the remaining joints of casing screwed together (kept crossthreading). Franks ran 1015.57 feet of casing set at 1012 feet from rig floor; 10 bowspriing centralizers were run on the casing string.. After the casing crew was rigged down and cementers were rigged up, a safety meeting was held prior to starting the cement job. Universal cemented the casing with 816 sacks of Type 1 (3% CaCl; 0.2%foam check; and 1/4 pound per sack flake. The cement had a density of 15.6 pounds per gallon, a yield of 1.2 cubic feet per sack, and they used 5.2 gallons of mix water per sack. Universal pumped 174 barrels of cement slurry, pumped 149 barrels of displacement, and got 38 barrels of cement returns to surface. My inspection revealed no violations at this time. |
616740701 | 2020-4-2 0:00:0 | PL | No Violations | 1.00 |
For data sources see[10]