X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22737

Well Details

Well ID: 34-019-22737
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Harrison Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-001487
Farm/Lease Name: GOEBELER UNIT
License Status: Producing
License Date: 2017-07-25
Spud Date: 2017-08-10
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2017-10-24
Well Total Depth: 15763.00 ft
Configuration: Horizontal
Latitude: 40.640000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-07-25 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/25/2017, Expired Date:7/25/2019 12:00:00 PM, Drilling unit acres:179.3, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-10-24 Baker Hughes ran directional survey OP REQUEST 1 YEAR CONFIDENTIALITY ALL LOGS
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Completion Report Received 2019-01-08 Baker Hughes ran directional survey OP REQUEST 1 YEAR CONFIDENTIALITY ALL LOGS
Record Last Modified 2019-01-10 Baker Hughes ran directional survey OP REQUEST 1 YEAR CONFIDENTIALITY ALL LOGS
Construction Permit Expires 2019-07-25 Baker Hughes ran directional survey OP REQUEST 1 YEAR CONFIDENTIALITY ALL LOGS

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-04-25 8138 8295 55
2018-04-25 15508 15692 55
15508 15692 55
8138 8295 55
8138 8295 55

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/26/2018 02/28/2018 7355 15,854,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 4.0 Guar Slurry ProFrac Proppant Transport Guar Gum 9000-30-0 55 0.0499457 75982
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0408646 62167
Other Chemical(s) Listed Above See Trade Name(s) List 4-Methoxyphenol 150-76-5 0 0 0
Citric Acid 77-92-9 40 0.00290608 4421
Ammonium Chloride 12125-02-9 1 0.000218893 333
Ethanol 64-17-5 2 0.000541645 824
Water 7732-18-5 75 0.0164058 24958
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.00131533 2001
Copolymer of 2-Propenamide 69418-26-4 30 0.0148939 22658
Water 7732-18-5 85 0.0171558 26099
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.565133 859732
Alkyl Quaternary Compound 7173-51-5 1.2 0.000324724 494
Glutaraldehyde 111-30-8 12.5 0.00338594 5151
Organophosphonate 129828-36-0 15 0.00328142 4992
Oleic Acid Diethanolamide 93-83-4 3 0.00148952 2266
Ethylenediamineteraacetate, sodium salt 64-02-8 0.1 0 0
Alcohols C10-16 68002-97-1 3.6 0.00131533 2001
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00148952 2266
Quarternary Ammonium Compound 68424-85-1 1.8 0.000487086 741
Ammonium acetate 631-61-8 10 0.00365282 5557
Sodium Chloride 7647-14-5 10 0.00496486 7553
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0124118 18882
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0408646 62167
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.00131533 2001
Sulphamic Acid 5329-14-6 5 0.000363507 553
Ammonium Chloride 12125-02-9 2 0.000993234 1511
Polyoxyethylene Sorbitan Monooleate 9005-65-6 1 0.000496288 755
Alpha 123 Baker Hughes Biocide Water 7732-18-5 82.5 0.0223468 33996
Alkyl Quaternary Compound 7173-51-5 1.2 0.000324724 494
Glutaraldehyde 111-30-8 12.5 0.00338594 5151
Ethanol 64-17-5 2 0.000541645 824
Quarternary Ammonium Compound 68424-85-1 1.8 0.000487086 741
ProFE 105 ProFrac Iron Control Citric Acid 77-92-9 40 0.00290608 4421
Sulphamic Acid 5329-14-6 5 0.000363507 553
Water 7732-18-5 70 0.00508646 7738
Sand ProFrac Proppant Silica Substrate 14808-60-7 100 10.7553 16,362,000.0
Hydrochloric Acid (10%) Cooper Natural Acidizing Water 7732-18-5 72 1.4532 2,210,740.0
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.565133 859732
FR 9400 StimStream Friction Reducer Alcohols C10-16 68002-97-1 3.6 0.00131533 2001
Ammonium acetate 631-61-8 10 0.00365282 5557
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.00131533 2001
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.00131533 2001
Distillates (petroleum), hydrotreated light 64742-47-8 25 0.00913237 13893
Water Rex Energy Carrier/Base Water 7732-18-5 100 86.9668 132,302,000.0
Scaletrol 767W Baker Hughes Biocide Organophosphonate 129828-36-0 15 0.00328142 4992
Methanol 67-56-1 30 0.00656218 9983
Ammonium Chloride 12125-02-9 1 0.000218893 333
Water 7732-18-5 75 0.0164058 24958
ProHib 100 ProFrac Acid Inhibitor 2-Polyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00302769 4606
Water 7732-18-5 85 0.0171558 26099
FR 7005 ECM Friction Reducer Polyoxyethylene Sorbitan Monooleate 9005-65-6 1 0.000496288 755
Ammonium Chloride 12125-02-9 2 0.000993234 1511
Oleic Acid Diethanolamide 93-83-4 3 0.00148952 2266
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0124118 18882
Copolymer of 2-Propenamide 69418-26-4 30 0.0148939 22658
Sodium Chloride 7647-14-5 10 0.00496486 7553
Water 7732-18-5 50 0.024823 37763
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00148952 2266
ProBreak 100 ProFrac Oxidizer Ammonium Persulfate 7727-54-0 100 0.000747391 1137

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-01-25 H2O 10 10886 Bbl 240380 PRO FRAC STAGE 1/45

STAGES 2-44 SEE IMAGES

2018-02-27 H2O 10 6937 Bbl 372780 PRO FRAC STAGE 45/45

STAGES 2-44 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 PENNENERGY RESOURCES LLC 447675 51025 267
2019 PENNENERGY RESOURCES LLC 110128 13106 89

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 PENNENERGY RESOURCES LLC Brine 27988 267
2019 PENNENERGY RESOURCES LLC Brine 3516 89

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1286823114 2017-8-14 0:00: DD No Violations 1.00
-1761763048 2018-1-16 0:00: DD No Violations 1.50
-423494240 2018-6-30 0:00: PW No Violations 2.50
-816947147 2019-8-27 0:00: PL No Violations 1.50
0071174977 2018-01-10 Drill / Deepen / Reopen No Violations I was on site to check the status of the pad. Schlumberger was on site running wireline logs, and a10k frac valve had been installed all seven wells. I spoke to the consultant on site, who anticipates completion activities to commence by the end of January.
0423494240 2018-06-30 Production Wells No Violations

-around inspection of the pad perimeter and erosional controls appeared functioning. Production equipment consisted of the following: - 400 bbl production tanks, nine labeled as containing condensate, and nine as containing produced water

Three vapor recovery units Four oil stabilization units with towers and vertical separators Ten gas processing units with vertical separators Seven combustor units

I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier and an annular gauge will be installed as soon as possible.

0489574728 2017-11-17 Drill / Deepen / Reopen No Violations I was on site during drilling operations. Sidewinder #62 was the drilling operator, and was drilling the 8.75 tangent section at a depth of 5350 and at approximately 200 ft/hr. I spoke to the consultant on site who informed me that no hole issues have been encountered during drilling.
0864289612 2017-09-21 Drill / Deepen / Reopen No Violations I was on site to check the drilling status of the pad. Sidewinder #62 was currently moving equipment on site and was anticipated to resume drilling operations this week. I performed a walk-around inspection of the site and no violations were noted at the time of inspection.
0905999191 2018-04-25 Completion Testing No Violations I was on site during flow back operations of the pad which started on 04/20/2018. Two stacks were actively flaring on the pad. I did not receive notification of flow back and subsequent flaring. I contacted Derek Smith of R.E. Gas Development and discussed notification requirements of flaring and informed the company that failure to do so in the future will result in enforcement action.
122706345 2020-4-2 0:00:0 PW No Violations 0.50
1286823114 2017-08-14 Drill / Deepen / Reopen No Violations I was on site with DOGRM Steve Ochs. The Yost#8 rig was in the process of being moved on site to drill the surface and intermediate sections of the seven permitted wells on the Goebeler B pad. We had a pre-spud meeting with Aaron Wilhite, the Rex consultant on site. Talking points included casing points and notifications. No violations were noted while at the time of inspection.
1502382307 2017-08-09 Drill / Deepen / Reopen No Violations
1503539240 2017-08-23 Drill / Deepen / Reopen No Violations

-around inspection of the rig while on site, and no violations were found at the time of inspection.

1516216022 2018-01-04 Drill / Deepen / Reopen No Violations I conducted a status check of the pad while the operator was in preparations to complete the well. Stacks were being set on the well while I was on site. I spoke to the consultant from Rex, who informed me that pressure testing for the well will take place during the weekend of 01/06/2018. I performed a walk-around inspection of the site and no violations were observed at the time of inspection.
1669051188 2019-8-27 0:00: PW No Violations 1.00
1761763048 2018-01-16 Drill / Deepen / Reopen No Violations I was on site to pick up a copy of the bond logs ran on the seven Goebeler wells drilling during 2017. Rex was in the process of installing isolation valves on the stacks. I spoke to the company man who anticipated completion operations to commence during the week of 1/21/18. I performed a walk-around inspection of the pad and no violations were observed during the time of inspection.
1882003943 2017-09-13 Drill / Deepen / Reopen No Violations
1957025821 2018-02-15 Drill / Deepen / Reopen No Violations I was on site during completion operations. I performed a walk-around inspection of the site and no violations were observed at the time of inspection.
44394034 2019-9-9 0:00:0 PW No Violations 1.00
489574728 2017-11-17 0:00 DD No Violations
71174977 2018-1-10 0:00: DD No Violations 1.00
864289612 2017-9-21 0:00: DD No Violations 1.00
905999191 2018-4-25 0:00: CT No Violations 2.10

For data sources see[10]

References