X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22739

Well Details

Well ID: 34-019-22739
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Harrison Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-001487
Farm/Lease Name: GOEBELER UNIT
License Status: Producing
License Date: 2017-07-25
Spud Date: 2017-08-12
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2017-12-04
Well Total Depth: 15444.00 ft
Configuration: Horizontal
Latitude: 40.640000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-07-25 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/25/2017, Expired Date:7/25/2019 12:00:00 PM, Drilling unit acres:590.06, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-12-04 OP REQUEST I YEAR CONFIDENTIALITY ON ALL LOGS
Conversion to Producer 2018-03-09 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Completion Report Received 2019-01-08 OP REQUEST I YEAR CONFIDENTIALITY ON ALL LOGS
Record Last Modified 2019-01-10 OP REQUEST I YEAR CONFIDENTIALITY ON ALL LOGS
Construction Permit Expires 2019-07-25 OP REQUEST I YEAR CONFIDENTIALITY ON ALL LOGS

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-04-25 8243 8419 55
2018-04-25 15218 15393 55
15218 15393 55
8243 8419 55
8243 8419 55

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/01/2018 03/20/2018 7501 12,306,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Alpha 123 Baker Hughes Biocide Glutaraldehyde 111-30-8 12.5 0.00338745 4054
Alkyl Quaternary Compound 7173-51-5 1.2 0.000325042 389
Water 7732-18-5 82.5 0.0223602 26760
Quarternary Ammonium Compound 68424-85-1 1.8 0.000487981 584
Ethanol 64-17-5 2 0.000542294 649
Hydrochloric Acid (10%) Cooper Natural Acidizing Water 7732-18-5 72 1.47736 1,768,060.0
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.574528 687577
ProFE 105 ProFrac Iron Control Citric Acid 77-92-9 40 0.00295462 3536
Water 7732-18-5 70 0.00517059 6188
Sulphamic Acid 5329-14-6 5 0.000369328 442
ProHib 100 ProFrac Acid Inhibitor 2-Polyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00307745 3683
Water 7732-18-5 85 0.0174411 20873
Sand ProFrac Proppant Silica Substrate 14808-60-7 100 11.9313 14,279,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Alcohols C12-15 ethoxylated 120313-48-6 2 0.00000418 5
Alkyl Quaternary Compound 7173-51-5 1.2 0.000325042 389
Ethanol 64-17-5 2 0.000542294 649
Sodium Chloride 7647-14-5 10 0.00210149 2515
Ethylene Glycol 107-21-1 10 0.00002005 24
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.574528 687577
Quarternary Ammonium Compound 68424-85-1 1.8 0.000487981 584
Hydrotreated Petroleum Distillate 64742-47-8 25 0.00525498 6289
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.000630865 755
Sulphamic Acid 5329-14-6 5 0.000369328 442
Water 7732-18-5 75 0.0164693 19710
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.00903934 10818
Copolymer of 2-Propenamide 69418-26-4 30 0.00630531 7546
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.00255271 3055
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.00255271 3055
Ammonium acetate 631-61-8 10 0.0070916 8487
4-Methoxyphenol 150-76-5 0 0 0
Citric Acid 77-92-9 40 0.00295462 3536
Oleic Acid Diethanolamide 93-83-4 3 0.000630865 755
Water 7732-18-5 85 0.0174411 20873
Alcohols C10-16 68002-97-1 3.6 0.00255271 3055
Ammonium Chloride 12125-02-9 2 0.000420298 503
Organophosphonate 129828-36-0 15 0.00329387 3942
Ethylenediamineteraacetate, sodium salt 64-02-8 0.1 0 0
Ammonium Chloride 12125-02-9 1 0.000219758 263
Glutaraldehyde 111-30-8 12.5 0.00338745 4054
Polyoxyethylene Sorbitan Monooleate 9005-65-6 1 0.000210567 252
ProBreak 100 ProFrac Oxidizer Ammonium Persulfate 7727-54-0 100 0.000144556 173
FR 9400 StimStream Friction Reducer Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.00255271 3055
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.00255271 3055
Alcohols C10-16 68002-97-1 3.6 0.00255271 3055
Ammonium acetate 631-61-8 10 0.0070916 8487
Distillates (petroleum), hydrotreated light 64742-47-8 25 0.0177294 21218
FR 7005 ECM Friction Reducer Sodium Chloride 7647-14-5 10 0.00210149 2515
Polyoxyethylene Sorbitan Monooleate 9005-65-6 1 0.000210567 252
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.000630865 755
Copolymer of 2-Propenamide 69418-26-4 30 0.00630531 7546
Ammonium Chloride 12125-02-9 2 0.000420298 503
Oleic Acid Diethanolamide 93-83-4 3 0.000630865 755
Hydrotreated Petroleum Distillate 64742-47-8 25 0.00525498 6289
Water 7732-18-5 50 0.0105091 12577
Scaletrol 767W Baker Hughes Biocide Organophosphonate 129828-36-0 15 0.00329387 3942
Ammonium Chloride 12125-02-9 1 0.000219758 263
Methanol 67-56-1 30 0.00658774 7884
Water 7732-18-5 75 0.0164693 19710
4.0 Guar Slurry ProFrac Proppant Transport Guar Gum 9000-30-0 55 0.0110481 13222
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.00903934 10818
FR 9200 StimStream Friction Reducer Ethylene Glycol 107-21-1 10 0.00002005 24
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.00008941 107
Alcohols C12-15 ethoxylated 120313-48-6 2 0.00000418 5
Water Rex Energy Carrier/Base Water 7732-18-5 100 85.8143 102,700,000.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-03-20 H2O 10 7102 Bbl 0 PRO FRAC STAGE 38/38

STAGES 2-37 SEE IMAGES

2018-03-01 H2O 10 7795 Bbl 0 PRO FRAC STAGE 1/38

STAGES 2-37 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 PENNENERGY RESOURCES LLC 553005 56174 265
2019 PENNENERGY RESOURCES LLC 122957 12037 88

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 PENNENERGY RESOURCES LLC Brine 16887 265
2019 PENNENERGY RESOURCES LLC Brine 2112 88

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1779510855 2017-12-5 0:00: CS No Violations 5.00
-1882961318 2017-9-21 0:00: PW No Violations 1.00
-234445382 2018-6-28 0:00: PW No Violations 2.50
-262404771 2018-4-25 0:00: CT No Violations 2.10
-3711275 2018-1-16 0:00: DD No Violations 1.20
0003711275 2018-01-16 Drill / Deepen / Reopen No Violations I was on site to pick up a copy of the bond logs ran on the seven Goebeler wells drilling during 2017. Rex was in the process of installing isolation valves on the stacks. I spoke to the company man who anticipated completion operations to commence during the week of 1/21/18. I performed a walk-around inspection of the pad and no violations were observed during the time of inspection.
0018364660 2018-01-04 Drill / Deepen / Reopen No Violations I conducted a status check of the pad while the operator was in preparations to complete the well. Stacks were being set on the seven drilled wells while I was on site. I spoke to the consultant from Rex, who informed me that pressure testing for the well will take place during the weekend of 01/06/2018. I performed a walk-around inspection of the site and no violations were observed at the time of inspection
0234445382 2018-06-28 Production Wells No Violations

-around inspection of the pad perimeter and erosional controls appeared functioning. Production equipment consisted of the following: - 400 bbl production tanks, nine labeled as containing condensate, and nine as containing produced water

Three vapor recovery units Four oil stabilization units with towers and vertical separators Ten gas processing units with vertical separators Seven combustor units

I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier and an annular gauge will be installed as soon as possible.

0262404771 2018-04-25 Completion Testing No Violations I was on site during flow back operations of the pad which started on 04/20/2018. Two stacks were actively flaring on the pad. I did not receive notification of flow back and subsequent flaring. I contacted Derek Smith of R.E. Gas Development and discussed notification requirements of flaring and informed the company that failure to do so in the future will result in enforcement action.
0295790052 2018-04-11 Drill / Deepen / Reopen No Violations I conducted a status check of the pad. Hydraulic fracturing operations on the pad were completed on 03/21/2018, and most equipment had been moved off site. Contractors were on site excavating and levelling the pad. Personnel were in the process of installing production equipment including oil stabilization units, producing tanks, and gas processing units, which are located on the north side of the A producing pad.
0405260119 2018-01-10 Drill / Deepen / Reopen No Violations I was on site to check the status of the pad. Schlumberger was on site running wireline logs, and a10k frac valve had been installed all seven wells. I spoke to the consultant on site, who anticipates completion activities to commence by the end of January.
0535413013 2018-04-11 Drill / Deepen / Reopen No Violations I conducted a status check of the pad. Hydraulic fracturing operations on the pad were completed on 03/21/2018, and most equipment had been moved off site. Contractors were on site excavating and levelling the pad. Personnel were in the process of installing production equipment including oil stabilization units, producing tanks, and gas processing units, which are located on the north side of the A producing pad.
0610758159 2018-01-16 Drill / Deepen / Reopen No Violations I was on site to pick up a copy of the bond logs ran on the seven Goebeler wells drilling during 2017. Rex was in the process of installing isolation valves on the stacks. I spoke to the company man who anticipated completion operations to commence during the week of 1/21/18. I performed a walk-around inspection of the pad and no violations were observed during the time of inspection.
0926045268 2017-08-14 Drill / Deepen / Reopen No Violations I was on site with DOGRM Steve Ochs. The Yost#8 rig was in the process of being moved on site to drill the surface and intermediate sections of the seven permitted wells on the Goebeler B pad. We had a pre-spud meeting with Aaron Wilhite, the Rex consultant on site. Talking points included casing points and notifications. No violations were noted while at the time of inspection.
1114407587 2019-8-27 0:00: PW No Violations 1.00
1143795038 2019-9-9 0:00:0 PW No Violations 1.00
1768342985 2017-08-09 Drill / Deepen / Reopen No Violations
1779510855 2017-12-05 Casing String Witnessed No Violations
18364660 2018-1-4 0:00:0 DD No Violations 2.00
1882961318 2017-09-21 Production Wells No Violations I was on site to check the drilling status of the pad. Sidewinder #62 was currently moving equipment on site and was anticipated to resume drilling operations this week. I performed a walk-around inspection of the site and no violations were noted at the time of inspection.
2091324294 2017-11-21 Casing String Witnessed No Violations
295790052 2018-4-11 0:00: DD No Violations 1.00
405260119 2018-1-10 0:00: DD No Violations 1.00
419610181 2020-4-2 0:00:0 PW No Violations 0.50
535413013 2018-4-11 0:00: DD No Violations 1.00
610758159 2018-1-16 0:00: DD No Violations 1.20
76048495 2019-8-27 0:00: PL No Violations 1.50
926045268 2017-8-14 0:00: DD No Violations 1.00

For data sources see[10]

References