Well Details

Well ID: 34-019-22742
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Harrison Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-001487
Farm/Lease Name: GOEBELER UNIT
License Status: Producing
License Date: 2017-07-25
Spud Date: 2017-08-13
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2017-10-13
Well Total Depth: 16504.00 ft
Configuration: Horizontal
Latitude: 40.640000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-07-25 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/25/2017, Expired Date:7/25/2019 12:00:00 PM, Drilling unit acres:546.89, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2017-08-13 OP REQUEST 1 YEAR CONFIDENTIALITY ALL LOGS
Reached Total Depth 2017-10-13 OP REQUEST 1 YEAR CONFIDENTIALITY ALL LOGS
Conversion to Producer 2018-01-05 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Completion Report Received 2019-01-08 OP REQUEST 1 YEAR CONFIDENTIALITY ALL LOGS
Record Last Modified 2019-01-10 OP REQUEST 1 YEAR CONFIDENTIALITY ALL LOGS
Construction Permit Expires 2019-07-25 OP REQUEST 1 YEAR CONFIDENTIALITY ALL LOGS

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-04-25 8175 8319 55
2018-04-25 16291 16443 55
16291 16443 55
8175 8319 55
8175 8319 55

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/27/2018 02/27/2018 7568 15,664,200.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ProBreak 100 ProFrac Oxidizer Ammonium Persulfate 7727-54-0 100 0.000587397 884
Sand ProFrac Proppant Silica Substrate 14808-60-7 100 10.8958 16,397,500.0
4.0 Guar Slurry ProFrac Proppant Transport Guar Gum 9000-30-0 55 0.0366844 55208
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0300151 45171
Other Chemical(s) Listed Above See Trade Name(s) List Glutaraldehyde 111-30-8 12.5 0.00341076 5133
Water 7732-18-5 85 0.0172425 25949
Sulphamic Acid 5329-14-6 5 0.000364797 549
Alkyl Quaternary Compound 7173-51-5 1.2 0.000327587 493
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.000802023 1207
Polyoxyethylene Sorbitan Monooleate 9005-65-6 1 0.000465134 700
Oleic Acid Diethanolamide 93-83-4 3 0.00139606 2101
Alcohols C10-16 68002-97-1 3.6 0.000802023 1207
Quarternary Ammonium Compound 68424-85-1 1.8 0.000491048 739
Water 7732-18-5 75 0.0165348 24884
Ammonium Chloride 12125-02-9 1 0.000220606 332
Ethylenediamineteraacetate, sodium salt 64-02-8 0.1 0 0
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0116317 17505
Organophosphonate 129828-36-0 15 0.0033071 4977
Sodium Chloride 7647-14-5 10 0.00465266 7002
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00139606 2101
Distillates (petroleum), hydrotreated light 64742-47-8 45 0.0300151 45171
Citric Acid 77-92-9 40 0.00292037 4395
Ammonium acetate 631-61-8 10 0.00222732 3352
4-Methoxyphenol 150-76-5 0 0 0
Ethanol 64-17-5 2 0.000545535 821
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.56796 854748
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.000802023 1207
Ammonium Chloride 12125-02-9 2 0.000930267 1400
Copolymer of 2-Propenamide 69418-26-4 30 0.013958 21006
Alpha 123 Baker Hughes Biocide Water 7732-18-5 82.5 0.0225098 33876
Alkyl Quaternary Compound 7173-51-5 1.2 0.000327587 493
Quarternary Ammonium Compound 68424-85-1 1.8 0.000491048 739
Ethanol 64-17-5 2 0.000545535 821
Glutaraldehyde 111-30-8 12.5 0.00341076 5133
Hydrochloric Acid (10%) Cooper Natural Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.56796 854748
Water 7732-18-5 72 1.46047 2,197,920.0
FR 9400 StimStream Friction Reducer Ammonium acetate 631-61-8 10 0.00222732 3352
Distillates (petroleum), hydrotreated light 64742-47-8 25 0.00556831 8380
Alcohols C10-16 68002-97-1 3.6 0.000802023 1207
Alcohols C12-14 ethoxylated 68439-50-9 3.6 0.000802023 1207
Alcohols C12-16 ethoxylated 68551-12-2 3.6 0.000802023 1207
ProHib 100 ProFrac Acid Inhibitor 2-Polyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00304264 4579
Water 7732-18-5 85 0.0172425 25949
Scaletrol 767W Baker Hughes Biocide Ammonium Chloride 12125-02-9 1 0.000220606 332
Methanol 67-56-1 30 0.0066142 9954
Organophosphonate 129828-36-0 15 0.0033071 4977
Water 7732-18-5 75 0.0165348 24884
Water Rex Energy Carrier/Base Water 7732-18-5 100 86.8586 130,717,000.0
FR 7005 ECM Friction Reducer Water 7732-18-5 50 0.0232633 35010
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00139606 2101
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0116317 17505
Sodium Chloride 7647-14-5 10 0.00465266 7002
Oleic Acid Diethanolamide 93-83-4 3 0.00139606 2101
Polyoxyethylene Sorbitan Monooleate 9005-65-6 1 0.000465134 700
Copolymer of 2-Propenamide 69418-26-4 30 0.013958 21006
Ammonium Chloride 12125-02-9 2 0.000930267 1400
ProFE 105 ProFrac Iron Control Sulphamic Acid 5329-14-6 5 0.000364797 549
Water 7732-18-5 70 0.00511115 7692
Citric Acid 77-92-9 40 0.00292037 4395

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-02-14 H2O 0 7629 Gal 68 PRO FRAC
2018-04-02 H2O 0 7303 Bbl 352607 PRO FRAC
2018-02-26 H2O 10 247007 Gal 355600 PRO FRAC STAGE 48/48

STAGES 2-47 SEE IMAGES

2018-01-25 H2O 10 304006 Gal 215520 PRO FRAC STAGE 1/55

STAGES 2-54 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 PENNENERGY RESOURCES LLC 544793 47245 265
2019 PENNENERGY RESOURCES LLC 151971 15138 89

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 PENNENERGY RESOURCES LLC Brine 19289 265
2019 PENNENERGY RESOURCES LLC Brine 3430 89

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1381462117 2018-1-4 0:00:0 DD No Violations 2.00
-1608114410 2019-8-27 0:00: PW No Violations 1.00
-2115836354 2017-8-28 0:00: DD No Violations 1.00
-623907229 2017-9-14 0:00: DD No Violations 1.00
-738366311 2019-8-27 0:00: PL No Violations 1.50
-824962656 2017-8-14 0:00: PW No Violations
-85420816 2018-1-16 0:00: DD No Violations 1.20
-858284776 2018-4-25 0:00: CT No Violations 2.10
0014946008 2018-02-14 Production Wells No Violations I was on site during completion operations. I performed a walk-around inspection of the site and no violations were observed at the time of inspection.
0085420816 2018-01-16 Drill / Deepen / Reopen No Violations I was on site to pick up a copy of the bond logs ran on the seven Goebeler wells drilling during 2017. Rex was in the process of installing isolation valves on the stacks. I spoke to the company man who anticipated completion operations to commence during the week of 1/21/18. I performed a walk-around inspection of the pad and no violations were observed during the time of inspection.
0319152986 2018-01-10 Drill / Deepen / Reopen No Violations I was on site to check the status of the pad. Schlumberger was on site running wireline logs, and a10k frac valve had been installed all seven wells. I spoke to the consultant on site, who anticipates completion activities to commence by the end of January.
0569857313 2018-06-30 Production Wells No Violations

-around inspection of the pad perimeter and erosional controls appeared functioning. Production equipment consisted of the following: - 400 bbl production tanks, nine labeled as containing condensate, and nine as containing produced water

Three vapor recovery units Four oil stabilization units with towers and vertical separators Ten gas processing units with vertical separators Seven combustor units

I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier and an annular gauge will be installed as soon as possible.

0623907229 2017-09-14 Drill / Deepen / Reopen No Violations
0824962656 2017-08-14 Production Wells No Violations I was on site with DOGRM Steve Ochs. The Yost#8 rig was in the process of being moved on site to drill the surface and intermediate sections of the seven permitted wells on the Goebeler B pad. We had a pre-spud meeting with Aaron Wilhite, the Rex consultant on site. Talking points included casing points and notifications. No violations were noted while at the time of inspection.
0858284776 2018-04-25 Completion Testing No Violations I was on site during flow back operations of the pad which started on 04/20/2018. Two stacks were actively flaring on the pad. I did not receive notification of flow back and subsequent flaring. I contacted Derek Smith of R.E. Gas Development and discussed notification requirements of flaring and informed the company that failure to do so in the future will result in enforcement action.
1093432377 2017-09-21 Drill / Deepen / Reopen No Violations I was on site to check the drilling status of the pad. Sidewinder #62 was currently moving equipment on site and was anticipated to resume drilling operations this week. I performed a walk-around inspection of the site and no violations were noted at the time of inspection.
1381462117 2018-01-04 Drill / Deepen / Reopen No Violations I conducted a status check of the pad while the operator was in preparations to complete the well. Stacks were being set on the seven drilled wells while I was on site. I spoke to the consultant from Rex, who informed me that pressure testing for the well will take place during the weekend of 01/06/2018. I performed a walk-around inspection of the site and no violations were observed at the time of inspection
1458411702 2020-4-2 0:00:0 PW No Violations 0.50
14946008 2018-2-14 0:00: PW No Violations 1.00
1507835429 2017-10-12 Drill / Deepen / Reopen No Violations Sidewinder #62 was drilling the 8.75 lateral section at a depth of 9970. I spoke to the company man on site, who informed me that a mud loss of approximately 50-75 bbls of occurred when the hole was loaded with diesel-based mud. The mud weight was then dropped from 11.5 ppg to 10.7 ppg and no further losses were encountered. I performed a walk-around inspection of the site, and no violations were observed.
1511897523 2017-08-17 Drill / Deepen / Reopen No Violations
1516265588 2017-08-09 Drill / Deepen / Reopen No Violations
1713097661 2017-08-30 Drill / Deepen / Reopen No Violations Yost #8 rig was making up the bottom-hole assembly in preparation for drilling the intermediate section after setting surface casing on 08/29/2017 when I was on site. I reviewed the results of the BOP test conducted on 08/30/2017 with the consultant for Rex Energy on site. The intermediate cement job was anticipated for 08/31/2017. No violations were noted during my inspection.
1850989616 2018-04-11 Drill / Deepen / Reopen No Violations I conducted a status check of the pad. Hydraulic fracturing operations on the pad were completed on 03/21/2018, and most equipment had been moved off site. Contractors were on site excavating and levelling the pad. Personnel were in the process of installing production equipment including oil stabilization units, producing tanks, and gas processing units, which are located on the north side of the A producing pad.
2115836354 2017-08-28 Drill / Deepen / Reopen No Violations I was on site to check the drilling status. Yost #8 was drilling ahead on air at a depth of 108. The rig skidded for the #11H after setting intermediate casing on the #8H on 08/27/2017. I performed a walk-around inspection of the site, and no violations were noted at the time of inspection.
319152986 2018-1-10 0:00: DD No Violations 1.00
569857313 2018-6-30 0:00: PW No Violations 2.50
593748683 2019-9-9 0:00:0 PW No Violations 1.00

For data sources see[10]