If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-27215 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.38,"lon":-82.18,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Newcastle Township | |
Operator Name: KNOX ENERGY INC. | |
Well Pad ID: | |
Farm/Lease Name: MCCOY E | |
License Status: Producing | |
License Date: 2013-04-15 | |
Spud Date: 2013-06-20 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2013-06-24 | |
Well Total Depth: 3241.00 ft | |
Configuration: Vertical | |
Latitude: 40.380000 | |
Longitude: -82.180000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-04-15 | Proposed Formations:BEREA THRU CLINTON, Issued Date:4/15/2013, Expired Date:4/15/2015 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-06-24 | |
Completion Report Received | 2013-09-03 | |
Construction Permit Expires | 2015-04-15 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-09-06 | 3096 | 3136 | 30 |
3096 | 3136 | 30 | |
3096 | 3136 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-08-12 | H2O | 15 | 57745 Gal | 30000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | CGAS EXPLORATION | 621.00 | 207.00 | 365 |
2013 | KNOX ENERGY INC. | 0.00 | 86.00 | 49 |
2014 | KNOX ENERGY INC. | 0.00 | 162.00 | 365 |
2015 | KNOX ENERGY INC. | 0.00 | 80.00 | 365 |
2016 | KNOX ENERGY INC. | 0.00 | 73.00 | 365 |
2017 | KNOX ENERGY INC. | 0.00 | 0.00 | 365 |
2018 | KNOX ENERGY INC. | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | CGAS EXPLORATION | Brine | 76 | 365 |
2013 | KNOX ENERGY INC. | Brine | 577 | 49 |
2014 | KNOX ENERGY INC. | Brine | 670 | 365 |
2015 | KNOX ENERGY INC. | Brine | 370 | 365 |
2016 | KNOX ENERGY INC. | Brine | 0 | 365 |
2017 | KNOX ENERGY INC. | Brine | 0 | 365 |
2018 | KNOX ENERGY INC. | Brine | 40 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1448946516 | 2015-10-2 0:00: | PL | No Violations | |
-459278225 | 2015-9-9 0:00:0 | PL | No Violations | |
-961060843 | 2013-10-28 0:00 | AD | No Violations | |
0085294680 | 2015-06-25 | Preliminary Restoration | No Violations | On the day of my inspection I found that 90% of the site was growing with well established vegetation. There was still an issue with water running through the site. It was creating a wash out that runs diagonally through the well site and down the hill. I called Bill Mitton and left a message to contact me. |
0459278225 | 2015-09-09 | Preliminary Restoration | No Violations | On the day of my inspection I found that the culvert had still not been installed. I called and left another message with Bill Mitton. |
0698159017 | 2015-08-28 | Preliminary Restoration | No Violations | On the day of my inspection I found that the site was dry and it was 90% covered in grass, but the drainage problem had not been addressed. I called and left a message with Bill Mitton. He returned my call and claimed that he intended to get the culvert installed the first part of the following week. |
0961060843 | 2013-10-28 | Annular Disposal | No Violations | On site to attempt to perform MIT testing on said well, company rep applied 324# of nitrogen pressure to annulus of casing and it fell off too 300# within 10 minutes and test failed on this attempt so decision was made to attempt to retest later this week when more nitrogen becomes available. |
0987051894 | 2014-10-24 | Preliminary Restoration | No Violations | On the day of my inspection I found that the grass was growing well, but there was an area where water was running off of the hill down across the well site. The run off has eroded ruts across the site. I called Bill Mitton of Knox Energy and left a message to contact me. |
1148767016 | 2013-06-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the access road and location had been cut. The pits were not dug and there was no drilling equipment on the location. |
1371819141 | 2013-06-20 | Casing String Witnessed | No Violations | On the day of my inspection I found that Kilbarger Drilling Rig #5 drilled a 14.75 hole on air to 65 and then ran new 32# 11.75 conductor casing to 62. Petroset broke circulation, pumped 100 lbs of gel, 50 lbs of cotton seed hulls and 50 sacks of class A cement. Good circulation was maintained throughout the job with 2 barrels of cement returns. |
1372083977 | 2013-06-21 | Casing String Witnessed | No Violations | On the day of my inspection I found that Kilbarger Drilling Rig #5 drilled an 11 hole on air to 644 and then ran new 24# 8.625 surface casing to 631. Petroset broke circulation, pumped a mixture of gel and cotton seed hulls, followed by 185 sacks of class A cement. Good circulation was maintained throughout the job with 12 barrels of cement returns. |
1372166983 | 2013-06-25 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Kilbarger Drilling Rig 5 had reached TD and set 4.5 production casing. The crew was rigging down and moving equipment off of the location. The permit was on display, the pit liners were in good shape and there were no leaks or spills. |
1383050565 | 2013-10-28 | Annular Disposal | No Violations | On the day of my inspection I met with UIC Inspector Dave Ball and Terry Wade of Knox Energy to witness a mechanical integrity test on this well for an application to use annular disposal. Terry Wade pressured up the annulus to 324 psi with a combination of nitrogen and natural gas. The pressure decreased to 300 psi within 15 minutes. The test failed. We will repeat the test at a later date. |
1406209307 | 2014-07-23 | Preliminary Restoration | No Violations | On the day of my inspection I found that the drill site had been seeded and strawed. There was minimal grass growth. The restoration does not pass at this time. |
1431697286 | 2015-05-15 | Preliminary Restoration | No Violations | On the day of my inspection I found that the site had been re-seeded, but it was still not growing well. There was still an issue with water running off the hill and through the site. I called Bill Mitton again. He said they would go back out to remediate the restoration. |
1440078531 | 2015-08-20 | Preliminary Restoration | No Violations | On the day of my inspection I found that the drainage issue had not been resolved. I contacted Bill Mitton and requested that they install a culvert to divert water across the site. |
1448946516 | 2015-10-02 | Preliminary Restoration | No Violations | On the day of my inspection I found that a drainage ditch and culvert had been installed to divert rainwater run-off from the well pad. The wash-out ruts had been graded, seeded and covered in straw. |
1450375753 | 2015-12-17 | Preliminary Restoration | No Violations | On the day of my inspection I found that the drainage work had alleviated the run-off problem. The site was covered in grass and I found no further erosion issues. This site passes preliminary restoration. |
1520466342 | 2014-06-17 | Preliminary Restoration | Violations Noted | On the day of my inspection I found that nothing had been done to establish a vegetative cover for erosion control at the drill site. The well owner, Knox Energy, must seed or sod the site in order to bind the soil to prevent erosion and/or sedimentation. The preliminary restoration on this site was due on 12/12/13. |
1954734208 | 2013-08-20 | Plug / Plug Back | No Violations | On the day of my inspection I found that the drilling pits were still open and nothing had been done to reclaim the area. A crew was on site constructing and hooking up the tank battery. |
698159017 | 2015-8-28 0:00: | PL | No Violations | |
85294680 | 2015-6-25 0:00: | PL | No Violations | |
987051894 | 2014-10-24 0:00 | PL | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1520466342 | US-OH-114458 | 2015-12-23 | Failure to restore within six months |
For data sources see[9]