X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-035-21939

Well Details

Well ID: 34-035-21939
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BASS ENERGY CO INC
Well Pad ID:
Farm/Lease Name: GEORGIAN MEDICAL ARTS II LLC UNIT
License Status: Producing
License Date: 2006-11-22
Spud Date: 2007-01-08
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2007-01-15
Well Total Depth: 3490.00 ft
Configuration: Vertical
Latitude: 41.540000
Longitude: -81.440000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-11-22 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:11/22/2006, Expired Date:11/22/2007 6:00:00 AM, Drilling unit acres:23.9607, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2007-01-15
Construction Permit Expires 2007-11-22
Completion Report Received 2008-07-11
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-09-24 3311 3333 45
3311 3333 45
3311 3333 45

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 52159 Gal 30000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 BASS ENERGY CO INC 93329.00 191.00 365
2008 BASS ENERGY CO INC 189224.00 382.00 365
2009 BASS ENERGY CO INC 217478.00 285.00 365
2010 BASS ENERGY CO INC 120211.00 79.00 365
2011 BASS ENERGY CO INC 70810.00 0.00 0
2012 BASS ENERGY CO INC 48587.00 0.00 366
2013 BASS ENERGY CO INC 38004.00 0.00 365
2014 BASS ENERGY CO INC 32678.00 50.00 365
2015 BASS ENERGY CO INC 24058.00 0.00 365
2016 BASS ENERGY CO INC 21409.00 44.00 365
2017 BASS ENERGY CO INC 19780.00 0.00 365
2018 BASS ENERGY CO INC 18311.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 BASS ENERGY CO INC Brine 7 365
2008 BASS ENERGY CO INC Brine 34 365
2009 BASS ENERGY CO INC Brine 146 365
2010 BASS ENERGY CO INC Brine 145 365
2011 BASS ENERGY CO INC Brine 62
2012 BASS ENERGY CO INC Brine 29 366
2013 BASS ENERGY CO INC Brine 34 365
2014 BASS ENERGY CO INC Brine 50 365
2015 BASS ENERGY CO INC Brine 0 365
2016 BASS ENERGY CO INC Brine 20 365
2017 BASS ENERGY CO INC Brine 0 365
2018 BASS ENERGY CO INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1008546991 2008-4-1 0:00:0 PL No Violations
-167780376 2007-1-8 0:00:0 DD No Violations
-1702520033 2007-1-9 0:00:0 DD No Violations
-1826305079 2007-1-8 0:00:0 DD No Violations
-1904222007 2007-5-21 0:00: DD No Violations
-1913765352 2007-1-11 0:00: DD No Violations
0167780376 2007-01-08 Drill / Deepen / Reopen No Violations Making location
0290701189 2017-09-05 UrbanProduction Wells No Violations I inspected this well location as part of routine inspection activity. At the time of this inspection, I observed the following: a wellhead with plunger-lift system and associated tank battery in separate enclosures, both located within the asphalt-paved parking area of a multi-tenant business center. The enclosure gates were locked and secure. The load-line valves were secure. I walked the areas surrounding the well and battery and found no signs of impacts or problems.
0434811985 2010-02-18 Production Wells No Violations No violation.
1008546991 2008-04-01 Preliminary Restoration No Violations
1578683536 2014-02-04 UrbanProduction Wells No Violations The producing unit is comprised of a wellhead with typical valve assembly and mechanical plunger lift system. The associated aboveground storage tank (AST) battery consists of 1 110-barrel steel lowboy production tank, 1 50-barrel brine tank, and separator unit. The wellhead and battery are enclosed in separate board-on-board enclosures. There is a line heater unit located in a separate chain-link enclosure. The unit element separation distances are good and ID, secondary containment, and process safety equipment are present.
1579092518 2007-01-22 Drill / Deepen / Reopen No Violations getting pits ready to close.
1702520033 2007-01-09 Drill / Deepen / Reopen No Violations setting surface
1826305079 2007-01-08 Drill / Deepen / Reopen No Violations cementing conductor in
1904222007 2007-05-21 Drill / Deepen / Reopen No Violations area graded and seeded
1913765352 2007-01-11 Drill / Deepen / Reopen No Violations drilling 1875
2119376897 2008-08-11 Preliminary Restoration No Violations Perliminary Restoration passed.
290701189 2017-9-5 0:00:0 UP No Violations 0.50
434811985 2010-2-18 0:00: PW No Violations

For data sources see[9]

References