X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-055-21783

Well Details

Well ID: 34-055-21783
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Bainbridge Township
Operator Name: SUMMIT PETROLEUM INC
Well Pad ID:
Farm/Lease Name: MCCLENNAN
License Status: Producing
License Date: 2001-10-15
Spud Date: 2002-05-24
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2002-05-30
Well Total Depth: 3980.00 ft
Configuration: Vertical
Latitude: 41.400000
Longitude: -81.330000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2001-10-15 2026 SUMMIT PETROLEUM INC Proposed Formation CLINTON Issued Date 10/15/2001 Expired Date 10/15/2002 6:00:00 AM
Original Spud 2002-05-24 RBDMS Rec
Completed 2002-05-30 RBDMS Rec
Reached Total Depth 2002-05-30 RBDMS Rec
Completion Report Received 2002-09-09 RBDMS Rec
Construction Permit Expires 2002-10-15 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2002-10-22 3754 3822 23
3754 3822 23
3754 3822 23

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 72000 Gal 30000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2002 SUMMIT PETROLEUM INC 3548.00 0.00 365
2003 SUMMIT PETROLEUM INC 28494.00 125.00 365
2004 SUMMIT PETROLEUM INC 19357.00 87.00 365
2005 SUMMIT PETROLEUM INC 15963.00 54.00 365
2006 SUMMIT PETROLEUM INC 12115.00 36.00 365
2007 SUMMIT PETROLEUM INC 11325.00 0.00 365
2008 SUMMIT PETROLEUM INC 12762.00 61.00 365
2009 SUMMIT PETROLEUM INC 10397.00 0.00 365
2010 SUMMIT PETROLEUM INC 9084.00 60.00 365
2011 SUMMIT PETROLEUM INC 5311.00 38.00 365
2012 SUMMIT PETROLEUM INC 9526.00 63.00 366
2013 SUMMIT PETROLEUM INC 7211.00 65.00 365
2014 SUMMIT PETROLEUM INC 6336.00 71.00 365
2015 SUMMIT PETROLEUM INC 6197.00 104.00 365
2016 SUMMIT PETROLEUM INC 4786.00 176.00 365
2017 SUMMIT PETROLEUM INC 2201.00 119.00 365
2018 SUMMIT PETROLEUM INC 5340.00 197.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2002 SUMMIT PETROLEUM INC Brine 83 365
2003 SUMMIT PETROLEUM INC Brine 576 365
2004 SUMMIT PETROLEUM INC Brine 243 365
2005 SUMMIT PETROLEUM INC Brine 306 365
2006 SUMMIT PETROLEUM INC Brine 80 365
2007 SUMMIT PETROLEUM INC Brine 280 365
2008 SUMMIT PETROLEUM INC Brine 238 365
2009 SUMMIT PETROLEUM INC Brine 121 365
2010 SUMMIT PETROLEUM INC Brine 152 365
2011 SUMMIT PETROLEUM INC Brine 248 365
2012 SUMMIT PETROLEUM INC Brine 248 366
2013 SUMMIT PETROLEUM INC Brine 200 365
2014 SUMMIT PETROLEUM INC Brine 200 365
2015 SUMMIT PETROLEUM INC Brine 160 365
2016 SUMMIT PETROLEUM INC Brine 226 365
2017 SUMMIT PETROLEUM INC Brine 323 365
2018 SUMMIT PETROLEUM INC Brine 256 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1795268048 2017-4-17 0:00: UP No Violations
-790867468 2018-6-8 0:00:0 UP No Violations
0790867468 2018-06-08 UrbanProduction Wells No Violations I conducted an inspection on this well site. No changes have occurred since my last inspection. No violations observed.
1480528240 2016-10-24 UrbanProduction Wells No Violations I conducted an inspection on this well. The well was equipped with a gas fired motor on the pumpjack and the valves on the wellhead were open. The last reported production was submitted in 2014 for this well. The well was fenced but needs a lock on the man door. The tank battery consisted of one 210 BBL production tank, one 100 BBL brine tank, a mechanical separator and drip bottle. The tank battery was diked and fenced but needed a lock on the man door. The proper lids were installed on the tank and a charcoal filter was plumbed into the vent stack on the production tank. The signage was located at the tank battery but needs to be updated to reflect the current owner. The lease access was stable. I contacted Alan Lorinchack 440-773-4101 from Summit Petroleum with regards to lock installation on the man door fencing and updating the signage.
1795268048 2017-04-17 UrbanProduction Wells No Violations I conducted a reinspection on this well site regarding installation of locks at the well and tank battery and updating signage. The well was equipped with a gas fired motor on the pumpjack and the valves on the wellhead were open. The well was fenced and a lock has been installed on the man door. The tank battery consisted of one 210 BBL production tank, one 100 BBL brine tank, a mechanical separator and drip bottle. The tank battery was diked and fenced with a new lock installed on the man door. The proper lids were installed on the tank and a charcoal filter was plumbed into the vent stack on the production tank. The signage was located at the tank battery and has been updated to reflect the current owner. The lease access was stable. No violations were observed.

For data sources see[9]

References