34-059-24362

Well Details

Well ID: 34-059-24362
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-000912
Farm/Lease Name: ANDY YODER D
License Status: Producing
License Date: 2014-04-21
Spud Date: 2014-07-09
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-07-25
Well Total Depth: 14600.00 ft
Configuration: Horizontal
Latitude: 40.030000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-04-21 Proposed Formations:POINT PLEASANT, Issued Date:4/21/2014, Expired Date:4/20/2016 12:00:00 PM, Drilling unit acres:415.879, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-07-25
Completion Report Received 2015-04-28
Correction to Well 2015-06-12 CHANGE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2016-04-20
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-03-22 8123 14384 780
8123 14384 780
8123 14384 780

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/02/2014 10/24/2014 7765 6,813,790.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-14 Baker Hughes Corrosion Inhibitor MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0010776 710.5
Sand, White, 40/70 Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 4.37112 2,882,100.0
BF-9L, 300 gal tote Baker Hughes Buffer MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0167857 11067.7
Enzyme G-NE Baker Hughes Breaker MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0125064 8246.08
HCl, 10.1 - 15% Baker Hughes Acidizing MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.70929 467670
Ingredients in Additive(s) (MSDS and non-MSDS) Baker Hughes See Trade Name(s) List Polyoxythylene Sorbitan Monooleate 9005-65-6 0.5 0.000225 148.556
Citric Acid 77-92-9 60 0.0023387 1544.33
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.0008999 594.225
Hydrotreated Light Distillate 64742-47-8 30 0.0252955 16703.9
Polyoxyethylene sorbitan monooleate 9005-65-6 5 0.0019663 1298.42
Ethylene Glycol 107-21-1 45 0.0053483 3531.73
Crystalline Silica (Quartz) 14808-60-7 100 12.8648 8,495,300.0
Isotridecanol, ethoxylated 9043-30-5 5 0.0049745 3284.9
Guar Gum 9000-30-0 60 0.0596939 39418.8
2-Propenoic, Polymer with Sodium Phosphinate, Sodium Salt 71050-62-9 20 0.002377 1569.66
Ammonium Chloride 12125-02-9 3 0.0013498 891.337
2-butoxy-1-propanol 15821-83-7 0.1 0.00009950 65.698
Methanol 67-56-1 100 0.0081143 5358.28
Potassium Hydroxide 1310-58-3 30 0.0050281 3320.3
Calcium Chloride 10043-52-4 5 0.0005943 392.414
Water 7732-18-5 95 0.672559 444124
Mineral Oil 8042-47-5 70 0.0696428 45988.6
Sorbitan Monooleate 1338-43-8 0.5 0.000225 148.556
Sodium Chloride 7647-14-5 5 0.0043348 2862.47
Poly (acrylamide-co-acrylic acid) partial sodium salt 62649-23-4 30 0.013498 8913.37
Hydrochloric Acid 7647-01-0 15 0.106243 70157.6
1-butoxy-2-propanol 5131-66-8 5 0.0049745 3284.9
Fatty Acids 61790-12-3 10 0.0001076 71.05
Ammonium Persulphate 7727-54-0 100 0.0006391 422
Potassium Chloride 7447-40-7 1 0.0001189 78.4829
Olefin 64743-02-8 5 0.00005380 35.525
Propargyl Alcohol 107-19-7 5 0.00005380 35.525
Polyoxyalkylenes 68951-67-7 30 0.0003228 213.15
Modified Thiourea Polymer 68527-49-1 7 0.00007530 49.735
Formaldehyde 50-00-0 1 0.00001080 7.105
Methyl Borate 121-43-7 30 0.0035192 2323.89
Sorbitan, mono-(9Z)-9-octadecenoate 1338-43-8 5 0.0019663 1298.42
Boric Acid 10043-35-3 30 0.0035192 2323.89
Crystalline Silica: Quartz 14808-60-7 5 0.0049745 3284.9
Oleamide DEA 93-83-4 2 0.0008999 594.225
1-Propanesulfonic acid, 2-methyl-2-[(1-oxo-2-propen-1-yl)amino],

polymer with 2-propenamide, sodium

83446-68-8 60 0.0235952 15581.1
Oxyalkylated alcohol 78330-21-9 5 0.0019663 1298.42
Paraffinic Petroleum Distillate 64742-55-8 30 0.0298469 19709.4
Hemicellulase Enzyme Concentrate 9025-56-3 5 0.0006244 412.304
Potassium Carbonate 584-08-7 60 0.0100562 6640.61
Petroleum Distillates 64742-47-8 30 0.0298469 19709.4
Water Operator Carrier Water 7732-18-5 100 86.0332 56,812,000.0
Sand, White, 30/50 Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 7.14416 4,710,500.0
Ferrotrol 300L Baker Hughes Iron Control MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0039037 2573.88
GBW-5 Baker Hughes Breaker MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.00064 422
Sand, White, 100 mesh Baker Hughes Proppant MSDS and Non-MSDS Ingredients Listed Below N/A 0 1.36908 902700
XLW-32, tote Baker Hughes Crosslinker MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0117484 7746.3
FRW-18 Baker Hughes Friction Reducer MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0450614 29711.2
GW-3LDF Baker Hughes Gelling Agent MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0996407 65698.1
MaxPerm-20A, 265 gallon tote Baker Hughes Friction Reducer MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0393849 25968.4
Scaletrol 720, 330 gl tote Baker Hughes Scale Inhibitor MSDS and Non-MSDS Ingredients Listed Below N/A 0 0.0119031 7848.29

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES I LP 741047 99600 282
2016 ECLIPSE RESOURCES I LP 413882 21629 360
2017 ECLIPSE RESOURCES I LP 271141 11660 364
2018 ECLIPSE RESOURCES I LP 155456 7051 337
2019 ECLIPSE RESOURCES I LP 34592 1513 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES I LP Brine 12028 282
2016 ECLIPSE RESOURCES I LP Brine 5157 360
2017 ECLIPSE RESOURCES I LP Brine 3033 364
2018 ECLIPSE RESOURCES I LP Brine 8903 337
2019 ECLIPSE RESOURCES I LP Brine 967 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1205452435 2017-3-9 0:00:0 PW No Violations 0.20
-1258416563 2017-9-12 0:00: PW No Violations 0.50
-1694580189 2015-9-21 0:00: PW No Violations 0.40
-1846594866 2015-1-7 0:00:0 PL No Violations 0.50
-209579051 2015-4-1 0:00:0 PW No Violations 1.00
-511035097 2019-2-12 0:00: PW No Violations 0.30
-74108201 2020-6-11 0:00: PW No Violations 1.00
0107635540 2018-08-16 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. Pressure gauges were present on all casing strings. The production equipment consisted of six sand traps, six gas production units, and two 400-barrel tanks. The identification was present at the wellhead.
0209579051 2015-04-01 Production Wells No Violations On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, I witnessed the well was currently flowing through the site production equipment to the Borton Central Gathering Facility with a formation test in progress.
0486878821 2016-07-26 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a Sweco wellhead and a production tree with valves in the open position and annular pressure monitoring in place. Tubing pressure was at 420 pounds per square inches and casing pressure was at 690 pounds per square inches with annular pressure monitoring in place. The production equipment included a line heater, a sand trap, a GP unit and 2-400 barrel purge tanks. Eclipse personnel were onsite preparing to install a plunger lift system to the well and shutting it in for 24 hours as an additional compressor is being installed at the Borton Central Gathering Facility.
0511035097 2019-02-12 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with valves in the open position. The 13.375-inch diameter surface casing had 750 pounds per square inch, the 9.625-inch diameter intermediate had 0 pounds per square inch, the 5.5-inch diameter production casing had 480 pounds per square inch, and the production tubing had 420 pounds per square inch. The production equipment consisted of six sand traps, six gas production units, and two 400-barrel tanks. The identification was present at the wellhead.
0950668656 2016-08-16 Production Wells No Violations On the day of my inspection of the Borton Central Gathering Facility (CFG) accompanied by ODNR Customer Service Assistant Jimmy Wiles, I witnessed the remediation of the affected area around the flare stack was completed and the facility was online. Repairs were completed yesterday at 22:00 with restart at that time. Inspection of the well pad found the well to be equipped with a plunger lift system with valves in the open position. Gauges present read 480 pounds per square inch on the tubing and 640 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a line heater, a sand trap, a GP unit and 2-400 barrel purge tanks. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
107635540 2018-8-16 0:00: PW No Violations 0.20
1083121880 2017-09-12 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Tom Thomas, I witnessed that the well was equipped with a plunger lift system with valves in the open position and annular pressure monitoring in place. Gauges present read 395 pounds per square inch on the tubing and 420 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a sand trap and a GP unit. Also present a blow case skid and 2-400 barrel purge tanks shared with the 1H, 2H, 3H, 5H and the 6H.
1205452435 2017-03-09 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the open position and annular pressure monitoring in place. Gauges present read 435 pounds per square inches on the tubing and 480 pounds per square inches on the casing with annular pressure monitoring in place. The production equipment included a sand trap and a GP unit. Also present a blow case skid and 2-400 barrel purge tanks shared with the 1H, 2H, 3H, 5H and the 6H.
1258416563 2017-09-12 Production Wells No Violations On the day of my inspection, I accompanied ODNR Inspector Doug Bennett, and I witnessed that the well was equipped with a plunger lift system with valves in the open position and annular pressure monitoring in place. Gauges present read is 395 pounds per square inch on the tubing and 420 pounds per square inch on the casing with annular pressure monitoring in place. The production equipment included a sand trap and a GP unit. Also present is a blow case skid and (2) 400 barrel purge tanks shared with the 2H, 3H, 4H, 5H and the 6H.
1583397671 2016-06-17 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a Sweco wellhead and a production tree with valves in the open position. The production equipment included a line heater, a sand trap, a GP unit and 2-400bbl purge tanks. Tubing pressure was at 450psi and Casing pressure was at 450psi with annular pressure monitoring in place. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF.
1694580189 2015-09-21 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with Sweco wellheads and production trees. The production equipment included a sand trap; a GP unit and 2-400bbl purge tanks. Tubing pressure was at 1250psi and Casing pressure was at 1525psi. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF.
1846594866 2015-01-07 Preliminary Restoration No Violations On the day of my inspection I witnessed that the site passed preliminary restoration according to ORC 1509.072A.
486878821 2016-7-26 0:00: PW No Violations 0.50
950668656 2016-8-16 0:00: PW No Violations 0.50

For data sources see[9]