If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24373 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.03,"lon":-81.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Warren Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001036 | |
Farm/Lease Name: WHEELER UNIT | |
License Status: Producing | |
License Date: 2014-07-24 | |
Spud Date: 2014-09-07 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2014-11-02 | |
Well Total Depth: 14564.00 ft | |
Configuration: Horizontal | |
Latitude: 40.030000 | |
Longitude: -81.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-05-20 | Proposed Formations:TRENTON, Issued Date:5/20/2014, Expired Date:5/19/2016 12:00:00 PM, Drilling unit acres:691.049, Proposed Well Type:ST, Proposed Well Class:STRT |
Reached Total Depth | 2014-11-02 | |
Correction to Well | 2014-12-05 | CHANGE IN PERMIT TYPE AND PERMIT NUMBER PER INSPECTOR. |
Correction to Well | 2016-01-08 | change in taget/takepoint per as-drilled plat-ALE |
Construction Permit Expires | 2016-07-23 | |
Completion Report Received | 2016-12-14 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/26/2016 | 08/10/2016 | 7997 | 10,394,400.0 | 10,394,400.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 3rd Party Surfactant | Mult-Chem | Surfactant | NA | NA | 0 | 0 | 0 |
HYDROCHLORIC ACID | Halliburton | Base Fluid | NA | NA | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 86.8974 | 86,688,600.0 | |
Hazardous and Non-Hazardous Ingredients | Crystalline silica, quartz | 14808-60-7 | 100 | 12.0925 | 12,063,500.0 | |||
Methanol | 67-56-1 | 60 | 0.0019966 | 1992 | ||||
Fatty acids, tall oil | Confidential | 30 | 0.000998302 | 996 | ||||
Acetic acid | 64-19-7 | 60 | 0.000603562 | 603 | ||||
Olefins | Confidential | 5 | 0.000399321 | 400 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.000332767 | 332 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000998302 | 996 | ||||
Alcohols, C14-C15, ethoxylated | 68951-67-7 | 30 | 0.000998302 | 996 | ||||
Water | 7732-18-5 | 100 | 1.00557 | 1,003,160.0 | ||||
Glycerine | 56-81-5 | 7 | 0.00006680 | 67 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.150722 | 150360 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00100594 | 1004 | ||||
Alcohols | 66455-14-9 | 30 | 0.000286287 | 286 | ||||
FE-1A ACIDIZING COMPOSITION, HAI-OS
ACID INHIBITOR, SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK |
Halliburton | Additive, Corrosion Inhibitor, Proppant | NA | NA | 0 | 0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-08-09 | H2O | 15 | 158652 Gal | 266440 | Halliburton | STAGE 56/56 |
2016-07-26 | H2O | 15 | 287965 Gal | 298910 | Halliburton | STAGE 1/56
48 SHOTS STAGES 2-55 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | 292373 | 33963 | 111 |
2017 | ECLIPSE RESOURCES I LP | 679337 | 36341 | 362 |
2018 | ECLIPSE RESOURCES I LP | 370689 | 10088 | 362 |
2019 | ECLIPSE RESOURCES I LP | 73913 | 1584 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ECLIPSE RESOURCES I LP | Brine | 24660 | 111 |
2017 | ECLIPSE RESOURCES I LP | Brine | 29328 | 362 |
2018 | ECLIPSE RESOURCES I LP | Brine | 9913 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 1955 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-130001615 | 2016-10-13 0:00 | PW | No Violations | 0.50 |
-1410076016 | 2014-10-23 0:00 | DD | No Violations | 1.50 |
-1754037414 | 2017-6-7 0:00:0 | PW | No Violations | 0.50 |
-1859180206 | 2020-6-4 0:00:0 | PW | No Violations | 1.00 |
-1884311393 | 2015-4-17 0:00: | PL | No Violations | 0.20 |
-2119112272 | 2016-8-12 0:00: | CT | No Violations | 2.00 |
-645067691 | 2016-12-12 0:00 | PW | No Violations | 0.50 |
-92982992 | 2019-9-4 0:00:0 | PW | No Violations | 0.30 |
0130001615 | 2016-10-13 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2915 pounds per square inches on the casing and 2650 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 3H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
0149237934 | 2016-09-27 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear, I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 3270 pounds per square inches on the casing and 2975 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 3H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
0370473320 | 2016-09-07 | Completion Testing | No Violations | On the day of my inspection I witnessed flowback operations began this morning through Tetra Services flowback equipment. I met with Consultant Cristo Giannareas and completed walk around revealing the well was flowing back with 1584 pounds per square inches on the casing and 2424 pounds per square inches on the tubing at 60 barrels per hour through a 20/64 inch choke. |
0435898252 | 2014-10-15 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that H&P 531 had set their surface casing and was picking up tools to drill out float equipment and begin their intermediate section. Completed walk around with Company Man Jack Turner revealing no violations. |
0645067691 | 2016-12-12 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2210 pounds per square inches on the casing and 1920 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 3H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
1048949907 | 2019-01-28 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with the production tubing opened and the production casing valves closed. The 13.375-inch surface casing had 0 pounds per square inch, the 9.625-inch intermediate had 600 pounds per square inch, the 5.5-inch diameter production casing had 600 pounds per square inch, and the 2.875-inch diameter production tubing had 400 pounds per square inch. The production equipment consisted of five sand traps, five gas production units, a blow case, and one 400-barrel tank. The produced gas and fluid are separated and then transferred to the Borton CGF for sales. Identification was located at each well and on the tank. |
1410076016 | 2014-10-23 | Drill / Deepen / Reopen | No Violations | |
149237934 | 2016-9-27 0:00: | PW | No Violations | 0.50 |
1657097785 | 2014-11-03 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that H&P Drilling Rig #531 was drilling a 17.5 inch diameter surface hole at a depth of 555 feet and a planned td of 1388 feet with 13.375 inch casing and cementing to follow. Completed walk around with Company Man Neil Ingram revealing no violations. |
1754037414 | 2017-06-07 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with a plunger lift system with valves in the open position. Gauges present read 1060 pounds per square inches on the casing and 650 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater and a GP unit. Also present a 400 barrel purge tank within containment and a blow case skid both shared with the 9H, 7H, 5H and the 3H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. Field testing of the sediment pond revealed a pH of 7 and chloride levels of 46 parts per million. |
1781057538 | 2016-11-28 | Production Wells | No Violations | On the day of my inspection I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2320 pounds per square inches on the casing and 2080 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 5H and the 3H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. |
1884311393 | 2015-04-17 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A. |
2119112272 | 2016-08-12 | Completion Testing | No Violations | On the day of my inspection I witnessed Deep Well Services Rig #4 was tripping in with 2.875 inch tubing to begin drilling out the first plug at 7645 feet. I completed a walk around with Consultant Will Ochampaugh revealing proper secondary containment was in place and gas production units were being set. |
370473320 | 2016-9-7 0:00:0 | CT | No Violations | |
435898252 | 2014-10-15 0:00 | DD | No Violations | 2.00 |
For data sources see[9]